the power plug.
Keep electric cables always free from oil and grease.•
The operator‘s work place is in front of the machine.•
Wear protective gloves to avoid injuries to fingers and •
hands when handling the sawblade and grooving tools,
feeding the work piece into the machine, or when
executing repairs.
Do not try to remove wood chips while the sawblade is •
running and while the sawing unit has not come to a
standstill.
Only use the machine with all the guards in place and •
all the cutting tools in perfect condition.
Legend Fig. 1
Sawblade guard1
Table extension folding down2
Longitudinal fence3
Motor4
Lifting bow for transport5
Lower sawblade cover6
Switch-plug combination, ON/OFF switch7
Cross-cutting gauge8
Unpacking
Unpacking the machine, Fig. 1.1
Remove the hoops1
Remove the cover and side parts2
Remove the enclosed parts and check them for 3
completeness:
– 1 longitudinal fence
– 1 stop rail
– 1 cap type plate
– 1 cross-cutting gauge
– 1 guard with riving knife
– 1 sawblade key
– 1 counter holder key
– 1 push stick
– 1 push handle
– 1 suction connector with closing plug
– 1 table length extension
– 4 foot caps, and
– Accessory pack with fixing parts
Assembly
For reasons of packing, your scheppach machine is not
completely assembled.
Crane‘s bows, Fig. 6
The two crane‘s bows (6) are mounted diagonallytowards
each other. The machine may be lifted with belts fitted
to the bows by a crane.
Assembly of the base, Fig. 2
Fold up the front and rear supporting legs (1). Fix each 1
leg with hexagon bolts, washers and nuts (2). Firmly
tighten all the bolts.
Attach four foot caps (3).2
Attach the suction connector (4) with four bolts, washers 3
and hexagon nuts.
Place the construction saw on its feet.4
Mount the tool holder for push stick, push handle and 5
sawblade key on the right-hand leg (Fig. 2.1).
Fasten the sawblade guard with riving knife, Fig. 3
Put the assembled sawblade guard with riving knife from 1
above in between the guide plate and clamping plate.
Set the clearance between riving knife and sawblade 2
to 3 8 mm (a), and tighten the clamping plate with
four hexagon bolts and washers (2).
Assembly of the table length extension, Fig. 4.1 and 4.2
Mount the table length extension (1) on both sides to 1
the table (2) with four hexagon bolts (3), four washers,
and four nuts. Tighten the nuts slightly by hand.
Fold out the supporting bow (4) for the table extension 2
and lock it on the table.
Adjust the table extension as follows:3
Place a ruler across the sawing table and the table 4
extension.
Adjust the height of the table extension and tighten 5
firmly to the sawing table (3) with the bolts and the
support (5).
Clamping device for longitudinal fence, Fig. 5.1
Fasten the clamping device (1) for the fence to the table
top using two cheese-head screws M 6 x 30, two washers
and two nuts M 6.
Assembly of the fence, Fig. 5.2
Screw the spacer plate to the fence with two saucer-1
head screws M 6 x 50, two washers 6 mm, and two wing
nuts M 6. Do not tighten!
Insert the stop rail and tighten it.2
Insert the fence into the clamping device.3
Tighten = Raise clamping flap
Release = Press clamping flap down
Place the fence into the clamping device.4
Position 1 = High fence surface
Position 2 = Low fence surface
Mount the cross-cutting gauge, Fig. 5.1
Put a saucer-head screw M 8 x 70 from below through 1
the square tube into the cross-cutting gauge and tighten
with washer 8 mm and handle.
Set the swinging part (3) in the square tube at a right 2
angle to the sawblade using the hexagon bolt (2). Use
a right-angle gauge to this purpose, and subsequently
make a trial cut.
Crane bow, Fig. 6
The two crane bows (6) are fitted diagonally to each other.
On the two crane bows, carrying belts can be attached for
supporting the machine on a crane.
Sawblade guard, Fig. 7
The sawblade guard is fitted ready for use.•
The sawblade guard is a protecting device and must •
always be fitted.
Make sure the guard always lies on the table top by •
its own weight, but that the two bolts are tightened
without play.
Setting the riving knife, Fig. 8
The clearance between sawblade and riving knife must •
not exceed 8 mm.
After every sawblade change check the clearance and •
re-adjust, if necessary. The riving knife tip must not
be lower than the base of the uppermost tooth. We
recommend a maximum setting of 5 mm underneath
the upper sawing tooth tip.
10

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Scheppach Structo 5 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Scheppach Structo 5 in de taal/talen: Duits, Engels, Frans, Italiaans, Pools, Fins als bijlage per email.

De handleiding is 9.22 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info