Photovoltaic modules setting:
Allows to set the power of the panels connected to the 2 inputs of the
SC300M
.
The proposed value is 100Wp per panel, but if you have
only one panel, you can reset the value of power to Zero
PF2 by clicking on this button under the corresponding
white box.
Setting the date and time:
Input the current date and time by clicking the "+" (plus)
or "–" (minus) icon under the relevant box.
By clicking on the arrow on the left, you can go back and
change the input data.
By confirming, all the data inserted earlier are saved and
you get to the DT001 main screen
8
5. OPERATION
5.1 Main screen
In the main screen of DT001 it is possible to monitor all information about the battery
status, tension, current, SoC, date and time and status of the solar panels. .
Main screen
The current is shown just for the service battery and refers oly to the charge current and
only by solar panels. The display shows which panel is working in that precise moment and
shows only the tension of the engine battery.
9