Installing the hot air circulation
system
jacket of the fireplace absolutely must
be conducted into the indoor environ-
ment. This ensures compensation for the
air that is expelled from the fireplace
through the flue, while it is operating,
and at the same time achiehe heating
function.
The hot air is fed into the rooms through
outlet pipes connected to the holes in the
upper wall of the shell with aluminium
tubes Ø 14 cm.
If hot air is being channelled to rooms
other than the one where the fireplace is
installed it is essential to ensure the
return of the air itself to the room with
the fireplace through grilles located at
the base of the walls or through spaces
under doors.
The pipes must not be any less than 14
cm in diameter so that the air does not
exceed a speed of 5 m/sec thus avoiding
bothersome noises and an excessive
drop in pressure due to friction. It is
important that the route of the pipes is as
straight as possible.
The aluminium tubes can be hidden with
chests of drawers, faux or recessed
beams, in any case it is essential that
they are very well insulated.
The channelling ducts can be a maxi-
mum length of 6 ÷ 8m each for version
V, and 4 ÷ 5 m each for version N.
This length is reduced by 1.2 m for each
curve and for each pipe outlet as a result
of the loss in pressure.
Installing the hot air circulation Kit
We offer the following hot air channel-
ling kits.
Kit One/bis
only for the room where the fireplace
is installed
- attach the two fittings "R2" to the
holes on the shell
- insert the two pipes (21) and secure
them with their clamps
- build the frames with the fittings with
the two outlets "B2" into the wall on
the top part of the fireplace mantle
- connect the two aluminium pipes to
the fittings and secure them with
clamps, and snap on the front grilles
Kit Two/bis
for the room where the fireplace is
installed, plus an adjacent room
- attach the two fittings "R2" to the
holes on the shell
- insert the two pipes (21) and secure
them with their clamps
- build the frame with the fitting for
outlet "B1" into the wall on the top
part of the fireplace mantel
- build the frame with the fitting for
outlet "B3" into the wall of the room
requiring heating
- connect the two aluminium pipes to
the fittings and secure them with
clamps, and snap on the front grilles
Kit Three/bis
for the room where the fireplace is
installed, plus two
adjacent rooms
- attach the two fittings "R2" to the
holes on the shell
- insert the two pipes (21) and secure
them with their clamps
- build the frames with the fitting for
the two "B3" outlets into the walls of
the rooms requiring heating
- mount slit "G1" in the top part of the
mantel to allow for ventilation inside
the mantel itself
- connect the two aluminium pipes to
the fittings and secure them with
clamps, and snap on the front grilles
Kit four/bis
for the room where the fireplace is
installed, plus three adjacent rooms
- attach the four fittings "R2" to the
holes on the shell
- insert the four pipes (21) and secure
them with their clamps
- recess the frame with the fitting for
outlet "B1" into the wall on the top
part of the mantel
- recess the frames with the fitting for
the three "B3" outlets into the walls of
the rooms requiring heating
- connect the four aluminium pipes to
the fittings and secure them with
clamps, and snap on the front grilles
Kit five/bis
for the room where the fireplace is
installed, plus four adjacent rooms
- attach the four fittings "R2" to the
holes on the shell
- insert the four pipes (21) and secure
them with their clamps
- recess the frames with the fitting for
the four "B3" outlets into the walls of
the rooms requiring heating
- mount a "G1" slit onto the top part of
the mantel to allow for ventilation
inside the mantel itself
- connect the four aluminium pipes to
the fittings and secure them with
clamps, and snap on the front grilles
Any hot air outlet holes provided on the
top of the mantel that are not being used
should be kept closed with the supplied
caps.
Special ducts can be built by adding
extra individual parts, as shown in the
pricelist, to the various kits.
INSTALLATION INSTRUCTIONS
Kit one/bis
Kit two/bis
Kit three/bis
Kit four/bis
Kit five/bis
7

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Edilkamin Titano Up 2 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Edilkamin Titano Up 2 in de taal/talen: Engels als bijlage per email.

De handleiding is 2.56 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Edilkamin Titano Up 2

Edilkamin Titano Up 2 Gebruiksaanwijzing en installatiehandleiding - Italiano - 16 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info