Step A Step B
Step D
5
4
3
Step E
MOUNTING THE COVERING
Step A
This step shows the stove after having been unpacked
and positioned in the room.
Step B
Remove the lower front panel, using a screwdriver as a
lever on the upper part, whilst ensuring not to damage
the manual channelling control (if applicable).
Step C
Fasten the lower front panel (1) to its support found
beneath the door, using the screws and washers D.6 sup-
plied.
Use M6 screws and washers to install the upper stone
profile (2) and the cast iron front panel (3).
Unless already in place, position 4 rubbers in the 4 upper
front panel support holes. Then open the door and fasten
the front panels to the structure by applying the screws
supplied to the lower part of the front panels.
Step D
- Remove both right and left closure tops (3) from the
aluminium profiles and remove the 2 M4 screws.
- Insert the stone side into the two grooves in the base,
as shown in figure (4).
- Straighten the side, making it as vertical and centred as
possible between the two aluminium profiles (5).
- Set both tops (3) into the profiles and insert the profile
pins. Then fasten the two M4 screws so that they enter
the groove of the stone profiles.
Step E
Unless already inserted, place 5 rubbers into the sheet
metal central top and place the stone top on these.
The picture shows all parts necessary to mount the stone
covering (the numbers refer to the exploded diagram
shown on page 23).