Installation Instructions
Please read these instructions carefully prior to
installation!
Installation should only be carried out by persons
qualified to do so!
Incorrect installation can put the safety of persons at
risk!
In case of improper installation, the manufacturer’s
guarantee becomes void.
Check the supplied screws and plugs to ensure
that these are suitable for the structural
conditions on site.
Move the gate to the closed position: the track should
terminate at least 50 mm next to the operator.
Preparing for installation
Required tools
Aligning the operator
2a
Install the track
3a
Inserting the toothed belt
4d
4.
- Drilling machine with 10 mm masonry drill
- Sturdy side cutter
- Metal saw
- Wrench, size 13
- Slot-head screwdriver 3 mm
- Cross-head screwdrivers PH2 and Ph3
-
Stand the operator on the foundation and align .
Cables emerge between the fixing feet 2b. Mark out
the holes and drill with a 10 mm masonry drill. Insert
the plugs.
Position the operator at a distance to the gate, as
specified.
Mount the operator .
nsert end locks into both track ends .
!
1. The gate must travel without inclination (0 %
gradient).
2. The gate must be guided in such a way that it
does not swing to the side when moving and
comes to a standstill at both travel limits.
3. The foundation must be of an adequate size.
Check the track length
Slide the gate into the opened position: the track
should terminate at least 50 mm next to the operator.
Offer up the track lengths and with a 5.5 mm metal
drill drill through the track and gate frame, deburr and
screw on with the supplied self-tapping threaded
screws (M6 x 16) .
Connect the track lengths with the tensioning pins
. Fasten the next length of track to the gate . Cut
the last length of track to the required size. .
Remove the operator cover .
Align the operator so that the rollers easily lower into
the track . Screw on with 4 x bolts (8 x 40) and
washers . I
Lay the toothed belt end into the toothed belt
tensioner , feed through the end lock and screw
on threaded bush .
5. Empty conduits and cables of the external
devices leading to the control elements (e.g. key
switch) and safety devices (e.g. photocells,
closing edge safety devices) must arrive
underneath the operator.
- Spirit level
To facilitate height alignment, insert a pencil at the
side of operator ,
Slide gate along the path of travel, drawing a line at
the same time .
The drive wheels should locate the centre
of the track along the full length of travel and
not butt against the track when in operation.
Disengage the operator (see control elements).
Feed the other toothed belt end through the end lock
and tension. Mark the point of emergence and
return the toothed belt. Lay the toothed belt at
marked point in the toothed belt tensioner, again feed
3b
3c
4i
3d
3e
3f 3g
3h
6a/b
4a
4b
4e 4c
4f
1
2
3
4
through the end lock and screw on the threaded
bush. Repeat to .
Tension the toothed belt only slightly.
Cut off the protruding length of toothed belt .
Finally, spray toothed belt with silicone.
a partial opening of approx. 1 m can be
triggered by a series resistance of 82 Ohm.
4e 4h
4j
Hold the toothed belt tensioner with wrench to
prevent it twisting ( und ).
Push the cable through the cable lead-throughs,
then insert a piece into the receptacle and tighten the
cable glands.
An all-pole switch-off with fuse to prevent
any inadvertent switching back on must be
fitted.
Connect mains cable to spring clamps L and N.
Screw protective conductor to earthing clamp. Route
remaining cable upwards.
4g 4h
Mains connection
!
!
Connections
Connection diagram 5c
Putting on the cover
6a 6b.
Control elements
7c
7a/b
7g/h
A
Do not connect any current-carrying cables,
only connect volt-free push buttons or volt-
free relay outputs (exception connection L).
E. Connection for aerial
On using an external aerial, the shielding must
be assigned to the adjacent terminal (F, right).
F. Connection for an external impulse generator
(Accessories, e.g. Key switch or digital coder)
G.Input STOP A (8k2 evaluation)
Connection for safety strips on secondary
closing edges with 8.2 ohm terminating
resistance.
H.Input STOP B (Photocell)
Connection for safety devices (accessories, e.g.
one-way photocell).
An interruption at this input end causes the
operator to automatically change direction
during the closing phase only.
I. Voltage supply24 V ~
(eg for one-way photocell), max. connected
load100 mA.
J. Plug-in base for radio receiver
K Connection for a signal light.
Output supplies 230 V.
Connection for a signal light.
Connect a signal light with protection class
II.
L Output for connecting automatic staircase
lighting volt-free relay contact, 250 V AC /5A.
M Output status signal "OPEN"
Connection to traffic light control, volt-free relay
contact 120 V AC /0,5 A oder 24 V DC /1A.
N Output status signal "CLOSE"
Connection to traffic light control, volt-free relay
contact 120 V AC /0,5 A oder 24 V DC /1A
Put on cover and fasten with 2 screws
The control elements for programming the gate
operator are located behind the transparent cover
. The cover is opened and removed with the
triangular wrench .
After programming the operator, replace the cover
.
.The numerical display serves to indicate the menu
stage, the respectively set value and for error/fault
5
6
7
diagnosis.
. The incremental display, lights up to indicate
readiness for operation and flashes on
acknowledgement of learned hand transmitter
codes.
.When making settings/adjustments the
button button serves as an "UP" button and
outside the menu as a START button.
.When making settings/adjustments the
button serves as a "DOWN" button.
.Button serves to call up the
settings/adjustment menu, to switch the menu
stages and to store the settings.
Programming of the control unit is menu-driven.
Pressing the button , calls up the menu prompting.
The numbers displayed indicate the menu stage.
After approx. 2 seconds, the display flashes and the
setting can be altered via the buttons and . The
selected setting is stored via the button and the
program automatically jumps to the next menu
stage. By repeatedly pressing the button menu
stages can be skipped. To quit the menu, press
button until "0" is displayed again.Outside the
menu, button can be used to generate a start
impulse.
By pulling the pull cord with knob, the operator can
be permanently disengaged from the gate . "8" is
displayed. Move the gate by hand . To lock in
place, press lever . Replace cover and lock
in place with triangular wrench .
Hold button pressed for 3 seconds. "3" is
displayed . Wait a short time until "3" flashes.
Press button and check to see that the gate opens.
If on pressing the button the gate travels in the
opposite direction, ie closes, keep the button
pressed for a further 3 seconds. "3" flashes for a
short time. The direction of travel has now been
switched.
Now press button to cause the gate to travel to the
desired upper OPEN travel limit .
By pressing button the position in the closing
direction can be corrected.
Do not let the gate travel right up to the limit
stop-allowadistanceofatleast3cmtothe
limit stop.
Once the gate has reached the travel limit, press
button ..
The operator stores the open travel limit and "4" is
displayed .
- Press button . The gate opens.
- Afterthe gate has reached the open position,
press button . again. The gate closes.
- The display goes out 2 seconds after the gate
has reached the closed position.
a
B
C
D
7d
7e
7e 7g/h
17g
Menu stage 3: setting the OPEN position:
8a
8b
8c
17
Disengagement.
Menu stage 4: setting the closed position
9a
9b
Force-learning operations
Caution:
!
Press button . The operator causes the gate to
travel in the CLOSE direction, as long as the button is
pressed . By pressing button the direction can
be corrected, causing the gate to travel in the OPEN
direction.
Once the gate has reached the desired closed travel
limit, press button . The operator stores the closed
travel limit and "5" is displayed.
Then press button twice until "0" is displayed .
When the gate opens and closes in this
operation mode, the operator is learning the
necessary forces and is It is
important that the travel operations are not
interrupted. Throughout these travel operations, "0"
is displayed.
not force-limited!
8
9
10
GB
Retain these installation, operating and maintenance instructions for the full duration of the operator’s service life!
17

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Tormatic NovoGate bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Tormatic NovoGate in de taal/talen: Nederlands, Duits, Engels, Frans, Spaans als bijlage per email.

De handleiding is 1,18 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info