1. Commissioning
1.1 To commission:
Replace the internal components.
Check the door alignment and catch operation, adjust if
required, see Maintenance & Servicing, Section 5.
Check the soundness of door seals, castings and joints.
Check the operation of the air controls.
Ensure the system has been filled with water and
includes a suitable inhibitor.
1.2 Now carry out a final smoke draw test:
First warming the flue with a blowlamp, or similar, for
about 10 minutes.
Place a smoke pellet on the centre of the grate, with the
air controls open.
Close the door. Smoke should now be drawn up the flue
and be seen to exit from the flue terminal.
Complete test with all doors and windows closed in the
room where the appliance is fitted.
If there are any extractor fans in adjacent rooms, the test
must be repeated with the fans running on maximum and
interconnecting doors open.
Check the effect of ceiling fans during the test.
If the test fails, re-check the suitability of the flue system
and ventilation. An inadequate air supply to the room is
potentially dangerous.
Light the appliance and slowly increase the temperature
to operating levels.
Ensure no combustion products enter the room.
Open the main fire door when the appliance reaches
operating condition and carry out a spillage test with a
smoke match or pellet around the door opening.
Run the system up to temperature.
BALANCING THE SYSTEM
It is essential to balance the central heating system in
order to achieve an even heating performance across all of
the radiators in the house. Balanced means each radiator
havinga10˚Cdifferenceintemperaturebetweentheflow
andthereturn,ideally80˚Cflowand70˚Creturn.
Have the system running and adjust the appliance
thermostat so that the flow temperature measured near
theapplianceisapproximately80˚C.Ensurethatallvalves
including lock-shield valves are in the fully open position
and the pump is at its estimated correct speed. If there
are thermostatic radiator valves, have these on maximum
setting and ensure that they do not activate.
Ensure that the radiators have been bled of air.
Write down the return temperature of each radiator in turn
and its difference to the flow temperature at the appliance.
Make sure that the flow temperature remains constant.
The radiator with the greatest difference (the index radiator)
and any other radiator within 1 degree should be left with
the lock-shield fully open. The remainder of the lock-shield
valves should be closed to about 1/3 open. Leave the
system to stabilise, this could take some time.
When the system has stabilised, write down the new
difference between the flow and return temperatures and
any which differ from the index radiator by more than 1
degree will need further adjustment, some valves will have
been closed too much and others not enough, usually the
adjustments need to be only a fraction of a turn at a time.
Leave sufficient time for the system to stabilise after each
adjustment.
When the radiator temperatures are starting to become
consistent, but before final adjustments, the index radiator
needs to be considered, if the return temperature of this
radiator is not near 70 degrees then the pump will need
to be adjusted to either provide more (to increase the
temperature) or less flow to decrease the temperature.
Again, sufficient time will need to be left to allow the system
to stabilise after adjusting the pump speed.
When the radiator flow and return temperatures are correct
the final adjustments can be made and the lock-shield
covers replaced.
Knowing how far to shut down a valve to get the desired
change in flow and return temperature, and knowing how
long to wait for the system to stabilise, takes a little time and
practice.
1.3 If excessive spillage occurs:
Allow the appliance to cool and re-check the flue system
and ventilation.
1.4 Finally:
Explain the safe operation of the appliance and the
use of the controls to the user and the importance of
only using suitable fuels.
Ensure that a thermostat has been fitted and make
the user aware of its operation and importance.
Ensure that a CO alarm has been fitted and make the
user aware of its operation and importance, referring
them to the Warning section on page 6 of the User
Instructions.
Explain the cleaning and routine maintenance
requirements.
Explain the requirement to use a suitable fireguard
when children, elderly or infirm persons are near the
appliance.
Record dealer/supplier and installer details
in Appliance Commissioning Checklist (page 3,
Instructions for Use).
Record serial number in Appliance Commissioning
Checklist (page 3, Instructions for Use). This number
is required when ordering spare parts and making
warranty claims.
— Give the copy of the Instructions to the customer.
Commissioning
29

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Stovax View 7 Inset High Output Boiler Inset bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Stovax View 7 Inset High Output Boiler Inset in de taal/talen: Engels als bijlage per email.

De handleiding is 4.77 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info