7. Electrical Supply
7.1 Electrical connections must meet the requirements of
national Building Regulations and standards, along with
any European, local regulations and working practices that
may apply. Should conflict occur between these instructions
and these regulations then the regulations must be followed.
The connection to the mains supply should allow
complete electrical isolation and only serve the heating
circuit pump.
All water connections should be completed by a competent
person to meet the requirements of local water authority
by-laws.
CONVENTIONAL PIPEWORK SYSTEMS
All pipe work must be able to operate at above 100
degrees Celsius. Any pipe work installed in an exposed
position e.g. loft space must have provision to prevent
freezing.
Ensure the pipe work system has sufficient drain
points to enable the complete removal of water for the
purposes of servicing.
8. Gravity Pump Circuit
8.1 To prevent the risk of boiling it is essential to arrange the
pipe work and position the hot water cylinder and heat leak
radiator so that gravity circulation can take place when the
pump is not running. Position the cylinder and the radiator
vertically above the boiler with sufficient height to encourage
gravity flow.
8.2 Horizontal pipe work in a gravity system must have an
incline of at least 5mm in every 1000mm and a minimum
diameter of 28mm. Vertical pipe must have a minimum
diameter of 22mm.
8.3 Any motorised valves fitted in this circuit must return to the
fully open position when the power is interrupted.
9. Pump Assisted Central Heating
9.1 The most common arrangement is to have a pumped central
heating circuit combined with a gravity hot water circuit. This
arrangement requires careful balancing of the two in order
to avoid the gravity circuit being starved when the pump is
running.
To overcome this problem it is common practice to fit an
injector tee where the pumped central heating return re-joins
the gravity return from the hot water cylinder. This injector tee
induces a much stronger gravity flow when the pump runs.
Only use proprietary injector tees, homemade ones are
difficult to get right.
9.2 When installing a system that has pumped central heating
and gravity hot water it is recommended to use all 4
boiler tappings. Each flow and return should be diagonally
opposite each other.
10. Fully Pumped System
10.1 In many installations (especially new build) a fully pumped
system is the best choice to give increased control.
WARNING - To prevent the risk of boiling it is essential
to arrange the pipe work and position the hot water
cylinder and heat leak radiator so that gravity
circulation can take place when the pump is not
running. Any motorised valves fitted in this circuit must
return to the fully open position when the power is
interrupted.
11. Sealed (Pressurized) System
11.1 Do not fit this appliance to sealed or pressurised systems or
an unvented hot water cylinder.
12. Pipework Diagrams
12.1 See below for a typical layout of a pumped central heating
and gravity hot water circuit.
HEATING SYSTEM CONTROLS
CONTROLS GENERAL
1.1 The controls fitted to the system will provide two functions:
— To control the comfort level in the house.
— To maintain safety in the event of misuse or mechanical
failure.
COMFORT CONTROLS
1.2 This primarily consists of a time clock wired into the pump.
The pump is switched on when heat is required and when it
is not, the pump is switched off.
The time clock, when combined with a room thermostat and
or thermostatic radiator valves, enhances the comfort levels
in the house.
Some room thermostats combine the function with the
time clock and can be programmed to reduce the room
temperature rather than turning the system off. This is
effective in not allowing the rooms to become too cold and
speeding up recovery time.
1.3 The hot water cylinder can also be fitted with a thermostatic
valve which turns off the flow when the cylinder has reached
the desired temperature but the heat leak radiator will have
to be bigger to cope with the extra load when the tank is
isolated.
SAFETY CONTROLS
1.4 This primarily consists of a high limit thermostat fitted to
thegravityflowpipesetat80˚C,thisthermostatshould
be connected to the pump so that the pump is turned on if
thetemperatureexceeds80˚C.Thiswillpreventaccidental
boiling in the gravity circuit.
Installation Instructions
27

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Stovax View 7 Inset High Output Boiler Inset bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Stovax View 7 Inset High Output Boiler Inset in de taal/talen: Engels als bijlage per email.

De handleiding is 4.77 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info