English Page 8
D. Installation
Preparation
• Unpack the boom and the motor unit and keep it ready for mounting.
Required tools
2
1
Combination wrench SW 10
Combination wrench SW 13
Socket wrench SW 8
Socket wrench SW 10
Socket wrench SW 13
Screw driver, size 5
Screw driver, size 8
Phillips Screw driver, size 2
Masonry drill ø 6 mm
Masonry drill ø 10 mm
Metal drill ø 5 mm
Pliers
Hack saw
Electric drill
Electric drill
Attention!
Before drilling, cover the motor unit with foil or cardboard.
Drilling dust and chippings can lead to malfunctions.
Site requirements
• Please suspend the motor unit together with the boom in such a way,
that the upper door edge lies approx. 10 mm below the downward horizontal
boom edge- measured at the highest point of the opening course
(see points 8, 9 and 10).
• Mount the unit to the ceiling according to the site requirements.
Please observe as well the indicated measurements for wall plug drilling.
3
GB
English Page 85
N. Index of illustrations
Fig. D.1: Required tools
Fig. D.2: Site requirements
Fig. D.3: Push on adapter sleeve
Fig. D.4: Turn operator unit
Fig. D.5: Boom on operator
Fig. D.6: Screw boom to operator
Fig. D.7: Mount suspension clamp
Fig. D.8: Mount securing sleeve
Fig. D.9: Lintel joining plate
at the boom end piece
Fig. D.10: Release pin out of carriage
Fig. D.11: Release pin inside carriage
Fig. D.12: Release the carriage
Fig. D.13: Operator with up-and-over
door
Fig. D.14: Operator with sectional door
Fig. D.15: Operator with heavy
sectional door
Fig. D.16: Operator with retractable
up-and-over door
Fig. D.17: Fixing angle for adapter arm
Fig. D.18: Adapter arm at the door
Fig. D.19: Measurements of adapter
arm
Fig. D.20: Suspension of operator
system
Fig. D.21: Separate door from
operator - 1
Fig. D.22: Separate door from
operator - 2
Fig. D.23: Connect door with operator
Fig. E.1: Hand transmitter
Fig. E.2: Open hand transmitter /
Insert battery
Fig. E.3: Attachment clip
for hand transmitter
Fig. E.4: Learn hand transmitter coding
Fig. E.5: Change hand transmitter
coding
Fig. F.1: Electronic aerial
Fig. F.2: Summary on control unit
housing Control 53
Fig. F.3: Summary on electronic
control unit Control 53
Fig. F.4: Function of the coding
switches S19, S20 and S20A
Fig. H.1: Cabling plan
Control 53
Fig. H.2: Wiring diagram
Comfort 257
Fig. H.3: Wiring diagram
Comfort 257 closing edge
safety device
Fig. H.4: Connection control unit –
door
Fig. I.1: Travel limit signals (relay)
Fig. I.2: Signal light connection for
automatic timer function
Fig. I.3: Lighting (relay for special
functions)
Fig. Q.1: Supply package
Comfort 257 - 1
Fig. Q.2: Supply package
Comfort 257 - 2