BRAVO CHARCOAL GRILL
ASSEMBLY INSTRUCTIONS
STEP 8: ASSEMBLE LID HANDLE AND
TEMPERATURE GAUGE
Assemble the lid handle [ X ] to the lid
using (2) 15MM bolts [ AZ ] and (2) large
finishing washers [ AJ ]. Assemble as
shown.
Remove the brass hexnut from the
temperature gauge [ AG ] and align the
probe key with the lock on the logo
plate [ AH ].
Align the temperature gauge and logo
plate probe and pins with the holes in
the lid. Secure to lid with the brass
hexnut.
STEP 9: ASSEMBLE THE BLOCKING
PLATE AND VENTS
Assemble (2) vents [ AC ] to the lid using
(1) M6 x 10MM bolt [ AQ ] and (1) M6
locking hexnut [ AX ] per vent. Tighten
enough to allow for some friction.
Assemble the blocking plate [ P ] to the
the cooking chamber using (4) M6 x
10MM bolts [ AQ ] and (4) M6 kep
hexnuts. Tighten bolts securely.
Assemble (1) vent to the cooking
chamber and (1) vent to the blocking
plate using (1) M6 x 10MM bolt [ AQ ]
and (1) M6 locking hexnut [ AX ] per
vent. Tighten enough to allow for some
friction.
PAGE 10
AG
8
STEP
9
STEP
AH
X
AJ
AZ
A
BRASS HEXNUT
AC
AC
AC
AX
AX
P
AQ
AT
AQ
AC
A
DO NOT RETURN PRODUCT TO THE STORE.
IF YOU HAVE QUESTIONS OR HAVE
TROUBLE WITH ASSEMBLY, PLEASE CALL
1-877-347-4557 FOR ASSISTANCE.