Regulations | 13
3 Regulations
Observe all rules, regulations, standards and guidelines
applicable to the installation and operation of this appliance
in your country.
In the Commonwealth of Massachusetts, this appliance
must be installed by a licensed plumber or gas tter. Valves
external to the boiler must be tted with T-handles and
condensate piping must be installed in accordance with the
State Plumbing Code.
3.1 Compliance with standards and regulations
The installation must conform to the requirements of the authority having
jurisdiction or, in the absence of such requirements, to the latest edition
of the National Fuel Gas Code, ANSI Z223.1./NFPA 54. In Canada,
installation must be in accordance with the requirements of CAN/CSA
B149.1, Natural Gas and Propane Installation Code.
This condensing gas boiler complies in its design and mode of operation
with the American National Standard ANSI Z21.13/CSA4.9, latest edition
for Gas Fired Low Pressure Steam and Hot Water Boilers.
Other conrmed approvals and certications are indicated by labels on
the boiler.
Where required by the authority having jurisdiction, the installation
must conform to the Standard for Controls and Safety Devices for
Automatically Fired Boilers, ANSI/ASME CSD-1.
Install CO detectors per local regulations. Boiler requires yearly
maintenance (see section “7 Maintenance”).
3.2 Operating limits of the boiler
The heat exchanger has been designed and certied in accordance with
the ASME Boiler and Pressure Vessel Code, Section IV.
The hot water distribution system must comply with all applicable codes
and regulations. When replacing an existing boiler, it is important to
check the condition of the entire hot water distribution system to ensure
safe operation. Common practice calls for inspecting an existing system
in its entirety and bringing it up to code. All pipework should be properly
cleaned and ushed.
3.3 Additional regulations for installation in
Massachusetts
(a) For all side wall horizontally vented gas fueled equipment installed in
every dwelling, building or structure used in whole or in part for residential
purposes, including those owned or operated by the Commonwealth and
where the side wall exhaust vent termination is less than seven (7) feet
[2150 mm] above nished grade in the area of the venting, including but
not limited to decks and porches, the following requirements shall be
satised:
INSTALLATION OF CARBON MONOXIDE DETECTORS. At the
time of installation of the side wall horizontal vented gas fueled
equipment, the installing plumber or gastter shall observe that a hard
wired carbon monoxide detector with an alarm and battery back-
up is installed on the oor level where the gas equipment is to be
installed. In addition, the installing plumber or gastter shall observe
that a battery operated or hard wired carbon monoxide detector
with an alarm is installed on each additional level of the dwelling,
building or structure served by the side wall horizontal vented gas
fueled equipment. It shall be the responsibility of the property owner
to secure the services of qualied licensed professionals for the
installation of hard wired carbon monoxide detectors.
- In the event that the side wall horizontally vented gas fueled
equipment is installed in a crawl space or an attic, the hard wired
carbon monoxide detector with alarm and battery back-up may be
installed on the next adjacent oor level.
- In the event that the requirements of this subdivision can not be
met at the time of completion of installation, the owner shall have
a period of thirty (30) days to comply with the above requirements;
provided, however, that during said thirty (30) day period, a
battery operated carbon monoxide detector with an alarm shall be
installed.
APPROVED CARBON MONOXIDE DETECTORS. Each carbon
monoxide detector as required in accordance with the above
provisions shall comply with NPA 720 and be ANSI/UL 2034 listed and
IAS certied.
SIGNAGE. A metal or plastic identication plate shall be permanently
mounted to the exterior of the building at a minimum height of eight (8)
feet above grade directly in line with the exhaust vent terminal for the
horizontally vented gas fueled heating appliance or equipment. The
sign shall read, in print size no less than one-half (.) inch in size, “GAS
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
INSPECTION. The state or local gas inspector of the side wall
horizontally vented gas fueled equipment shall not approve the
installation unless, upon inspections, the inspector observes carbon
monoxide detectors and signage installed in accordance with the
provisions of 248 CRM 5.08(2)(a) 1 through 4.
(b) EXEMPTIONS: The following equipment is exempt from 248 CRM
5.08(2)(a) 1 through 4:
The equipment listed in Chapter 10 entitled “Equipment Not Required
To Be Vented” in the most current edition of NFPA 54 as adopted by
the board; and
Product Approved side wall horizontally vented gas fueled equipment
installed in a room or structure separate from the dwelling, building or
structure used in whole or in part for residential purposes.
(c) MANUFACTURERS REQUIREMENTS - GAS EQUIPMENT
VENTING SYSTEM REQUIRED. When the manufacturer of Product
Approved side wall horizontally mounted gas equipment provides a
venting system design or venting system components with the equipment,
the instructions provided by the manufacturer for the installation of the
equipment and venting shall include:
Detailed instructions for the installation of the venting system or the
venting system components; and
A complete parts list for the venting system design or venting system.
(d) MANUFACTURERS REQUIREMENTS - GAS EQUIPMENT
VENTING SYSTEM NOT PROVIDED. When the manufacturer of Product
Approved side wall horizontally vented gas fueled equipment does not
provide the parts for the venting of ue gases, but identies special
venting systems, the following requirements shall be satised by the
manufacturer:
The referenced special venting systems shall be included with the
appliance or equipment installation instructions; and
The special venting systems shall be Product Approved by the Board,
and the instructions for that system shall include a parts list and
detailed installation instructions.
(e) A copy of all instructions for all Product Approved side wall horizontally
vented gas fueled equipment, all venting instructions, all parts lists for
venting instructions, and/or venting design instructions shall remain with
the appliance or equipment at the completion of the installation.
13

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Buderus SSB512 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Buderus SSB512 in de taal/talen: Engels als bijlage per email.

De handleiding is 9,92 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Buderus SSB512

Buderus SSB512 Installatiehandleiding - Français - 68 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info