697433
4
Verklein
Vergroot
Pagina terug
1/72
Pagina verder
Contents
6720813171 (2016/05)4
Contents
1 Key to symbols and safety instructions . . . . . . . . . . . . . . . . . . . 5
1.1 Key to symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.2 Safety instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3 Regulations and directives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.1 Designated use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.2 Boiler room . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.3 Combustion air flue gas connection . . . . . . . . . . . . . . . . . 9
3.4 Quality of the heating system water . . . . . . . . . . . . . . . . . 9
3.5 Quality of the pipework . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.6 Maintenance schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.7 Applicability of regulations . . . . . . . . . . . . . . . . . . . . . . . . 9
4 Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
4.1 Please observe these instructions . . . . . . . . . . . . . . . . 10
4.2 Tools, materials and further equipment . . . . . . . . . . . . 10
4.3 Recycling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
5 Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
5.1 Lifting and carrying the boiler . . . . . . . . . . . . . . . . . . . . 10
5.2 Transporting the boiler with a trolley . . . . . . . . . . . . . . 11
6 Items supplied with boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
7 Dimensions of boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
8 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
8.1 Installing the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
8.2 General connection of mains water and gas
components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
8.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
8.2.2 Install the water and gas connections to the boiler
using a pump group (accessory) . . . . . . . . . . . . . . . . . . 15
8.2.3 Install the water and gas connections to the boiler
without a pump group . . . . . . . . . . . . . . . . . . . . . . . . . . 15
8.2.4 Installing the differential pressure controller . . . . . . . 16
8.2.5 Installing the isolating valves . . . . . . . . . . . . . . . . . . . . 16
8.2.6 Installing the drain cock . . . . . . . . . . . . . . . . . . . . . . . . 16
8.2.7 Installing a pressure relief valve . . . . . . . . . . . . . . . . . . 16
8.2.8 Selecting and installing the pump . . . . . . . . . . . . . . . . 16
8.2.9 Installing the condensate trap . . . . . . . . . . . . . . . . . . . 17
8.2.10 Condensate removal . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
8.2.11 Connecting the condensate drain pipe . . . . . . . . . . . . 19
8.2.12 Connecting the expansion vessel in a single-boiler
system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
8.3 Flue Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
8.3.1 Siting the flue terminal . . . . . . . . . . . . . . . . . . . . . . . . . 20
8.3.2 Air supply and flue gas exhaust in a room sealed
installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
8.3.3 Maximum Flue length (L) . . . . . . . . . . . . . . . . . . . . . . . 22
8.3.4 Additional flue parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
8.3.5 Standard 100 mm flue systems . . . . . . . . . . . . . . . . . . . 22
8.3.6 Installation of the horizontal flue . . . . . . . . . . . . . . . . . . 23
8.3.7 Flue pipe preparation and assembly . . . . . . . . . . . . . . . 23
8.4 Flue gas connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
8.4.1 Open flue operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
8.4.2 Room sealed operation . . . . . . . . . . . . . . . . . . . . . . . . . . 23
8.4.3 Flue material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
8.4.4 Calculating the air intake and flue gas pipe
dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
8.5 Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . 24
8.5.1 Electrical wiring diagram . . . . . . . . . . . . . . . . . . . . . . . . 25
8.5.2 Terminal strip connections . . . . . . . . . . . . . . . . . . . . . . . 26
8.5.3 Routing the cable through the boiler . . . . . . . . . . . . . . . 26
8.5.4 Description of the terminal strip connections . . . . . . . . 26
8.5.5 230 V connections (only for GB162-50/65) . . . . . . . . 29
8.5.6 Installing function modules (accessories) . . . . . . . . . . . 30
9 Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
9.1 General items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
9.2 BC10 control operating instructions . . . . . . . . . . . . . . . 33
10 Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
10.1 Filling the heating system . . . . . . . . . . . . . . . . . . . . . . . . 37
10.1.1 Filling the heating system . . . . . . . . . . . . . . . . . . . . . . . . 37
10.1.2 Filling the condensate trap with water . . . . . . . . . . . . . 38
10.2 Testing and measuring . . . . . . . . . . . . . . . . . . . . . . . . . . 38
10.2.1 Checking for gas leaks . . . . . . . . . . . . . . . . . . . . . . . . . . 38
10.2.2 Bleeding the gas flow pipe . . . . . . . . . . . . . . . . . . . . . . . 39
10.2.3 Gas consumption test . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
10.2.4 Checking the flue gas connection . . . . . . . . . . . . . . . . . 40
10.2.5 Checking the appliance configuration . . . . . . . . . . . . . . 40
10.2.6 Measuring the gas inlet pressure (working pressure) . . 40
10.2.7 Checking and adjusting the gas/air-ratio . . . . . . . . . . . . 41
10.2.8 Carrying out a leakage test in operating conditions . . . 42
10.2.9 Measuring the flue gases CO
2
emissions . . . . . . . . . . . . 43
10.2.10Carrying out a function test . . . . . . . . . . . . . . . . . . . . . . 43
10.2.11Measuring the ionisation current . . . . . . . . . . . . . . . . . . 43
10.3 Boiler settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
10.3.1 Setting the heating capacity . . . . . . . . . . . . . . . . . . . . . . 44
10.3.2 Setting the maximum CH flow temperature . . . . . . . . . 44
10.3.3 Setting the pump run-over time . . . . . . . . . . . . . . . . . . . 44
10.3.4 Switching DHW mode on/off . . . . . . . . . . . . . . . . . . . . . 44
10.3.5 Setting the DHW temperature . . . . . . . . . . . . . . . . . . . . 44
10.4 Final activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
10.4.1 Closing the boiler door and the control panel . . . . . . . . 45
10.4.2 Handing over . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
10.5 Commissioning record log book . . . . . . . . . . . . . . . . . . 45
11 Shutting down the heating system . . . . . . . . . . . . . . . . . . . . . . 46
11.1 Shutting down the heating system using the
basic controller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
11.2 Shutting down the heating system if there is a risk
of freezing (interruption of use) . . . . . . . . . . . . . . . . . . 46
12 Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
12.1 Preparing the heating system for inspection . . . . . . . . 46
12.2 Opening the boiler door . . . . . . . . . . . . . . . . . . . . . . . . . 47
4

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Worcester-Bosch GB162-65 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Worcester-Bosch GB162-65 in de taal/talen: Engels als bijlage per email.

De handleiding is 5,43 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Worcester-Bosch GB162-65

Worcester-Bosch GB162-65 Installatiehandleiding - English - 12 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info