Aktobis AG, Borsigstr. 20, D-63110 Rodgau / Germany
www.AKTOBIS.de
Email: Info@Aktobis.de
1.5. Finally, you must secure the heating head with the supplied Allen screw (M6X10):
1.6. Always make sure that the heating head is in a horizontal position at all times before putting the unit into
operation !
Instructions for use:
2. Commissioning
2.1. Insert the mains plug properly into the socket.
2.2. Switch the unit on by pulling the main switch (pull cord). The unit then signals that it is ready for operation
by the red operating light lighting up.
2.3. The unit switch is located next to the red operating light. You can use this to switch the operation in the
following sequence (circuit):
Level 1 (1,200 Watt heating power)
Level 2 (2,400 Watt heating power)
From
The supplied remote control also functions according to the one-button switching in the order listed above !
The remote control requires two AAA (micro) batteries (not included) !