Page 12
F. Adjustable wall bracket N. Roofing sheet, sloping at 5-30°
G. Concentric pipe O. Roof pass-through
H. Universal mounting plate P. Lead roof plate 20-45°
12.1 Possibilities for connecting concentric flue system
Indirect wall pass through (see page 23 diagrams 1 and 2).
Always fit a length of X=1 metre vertical on the apparatus and then directly after this a bend of 90° with a length
Y (min) wall pass through on this. If required the horizontal part can be extended to 5 metres plus wall pass
through (Y max) .
Note: For propane appliances 4metres plus wall pass through applies (Y max).
This horizontal slope must never
be exceeded.
Roof pass through without slope ( see page 23 diagram 3).
You can use a direct pipe layout without a slope for a maximum length of X=12 metres (excluding the roof vent
flange) measured from the connection on the unit. The minimum length is 2 metres. You can have a flue terminal
at every position on the roof face (both flat and sloping); the flue tube and combustion air supply are located in
the same pressure area. For 2 metres and longer a restriction plate must be used for all gas types.
Roof pass through with slope 45° ( see page 23 diagram 4).
Always fit a length of X=1 metre vertically on the unit. Next, continue building up the flue pipe using 2 45º
bends (the calculation length for each bend is 1 metre) until you have reached the maximum pipe length of 12
metres (including bends excluding roof pass through). The minimum length is 2 metres. You can have a flue ter-
minal at every position on the roof face (both flat and sloping); the flue tube and combustion air supply are lo-
cated in the same pressure area. For 2 metres and longer a restriction plate must be used for all gas types.
Roof pass through with slope 90° ( see page 23 diagram 5).
Always fit a length of X=2 metres vertically on the unit. Next, continue building up the flue pipe using 2 90°
bends (the calculation length for each bend is 2 metres) until you have reached the maximum pipe length of 12
metres (including bends, excluding roof pass through). The minimum length is 3 metres. You can have a flue ter-
minal at every position on the roof face (both flat and sloping); the flue tube and combustion air supply are lo-
cated in the same pressure area. Take into account a maximum horizontal layout of Y=4 metres (measured be-
tween bends) and also ensure sufficient gradient. For 2 metres and longer a restriction plate must be used for all
gas types.
12.2 Construction of concentric flue system
Assembly instructions are given below:
Mounting using an exterior wall duct
The outlet can also be installed above the exhaust in the wall (always one metre vertical first), take into account
obstacles according to environment. The (local) Building Regulations will provide the required guidelines in re-
lation to this matter. Also, ensure that the wind pressure on the flue terminal here is not too extreme either (for
example, in very narrow lanes or alleys) since this may negatively influence the unit efficiency. Provide a recess
in the exterior wall with of around 155 mm (in a flammable wall have 50mm of extra space round the outer pipe)
and fix the wall pass through with the wall plate to the inner side of the wall. The wall plate of the exterior wall
duct must be sealed sufficiently against the wall on the outside; this is in connection to there being leaks of mois-
ture and/or flue gas into the living space. The flue should be cased if necessary. Sufficient fireproof measures
must also be taken when the flue is being mounted along flammable materials. Determine the position of the ap-
paratus and the outlet and begin the construction of the flue with the connection on the apparatus, pay attention to
the direction of installation. The inner flue must be installed for draining. Connect the elements by using clamp-
ing straps. Fit a bend of 90° directly on the wall pass through and make the connection with the elements on the
apparatus. Ensure that the gastightness of all connections is correct. A fitted pipe can be used in between the
bends or when making the connection to the unit. If necessary use wall brackets to support the flue. Provide a re-
cess in the exterior wall of around 155 mm (in a flammable wall have 50mm of extra space round the outer pipe)
and fix the wall pass through with the wall plate to the inner side of the wall. The wall plate of the exterior wall
duct must be sealed sufficiently against the wall on the outside; this is in connection to there being leaks of mois-
ture and/or flue gas into the living space.
12

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Thermocet Coventry S bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Thermocet Coventry S in de taal/talen: Engels als bijlage per email.

De handleiding is 3,19 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info