813457
32
Verklein
Vergroot
Pagina terug
1/44
Pagina verder
32
LEGAL REQUIREMENTS
Before installation and/or use of this appliance please read these
instructions carefully to ensure that all requirements are fully
understood.
The appliance must be fitted by a registered installer, or
approved by your local building control officer.
It is very important to understand the requirements of the
national Building Regulations and standards, along with any local
regulations and working practices that may apply. Should any
conflict occur between these instructions and these regulations
then the regulations must apply.
Your local Building Control Office can advise regarding the
requirements of the regulations.
Works must be carried out with care to meet the requirements of
Health and Safety and comply with the Health and Safety rules,
and any new regulations introduced during the lifetime of these
instructions. Particular attention should be drawn to:
Handling: The appliance is heavy. Adequate facilities
must be available for loading, unloading and on site
handling.
Fire Cement: Some fire cement is caustic and must not
come into contact with the skin. Protective gloves must
be worn. Wash hands thoroughly with plenty of water
after
contact with skin.
Asbestos: This appliance contains no asbestos. If there
is the possibility of disturbing any asbestos in the course
of installation seek specialist guidance and use
appropriate equipment.
Metal Parts: Take care when installing or servicing the
stove to avoid personal injury.
A faulty installation can cause danger to the inhabitants and
structure of the building.
For users of this appliance:
Your building insurance company may require you to inform them
that a new heating appliance has been installed on your property.
Check that your cover is still valid after installing the appliance.
FLUE OR CHIMNEY
The flue or chimney system must be in good condition.
It must be inspected by a competent person and passed for use
with the appliance before installation.
Products of combustion entering the room can cause serious
health risks.
The following must be checked:
The construction of the masonry chimneys, flue block
chimneys and connecting flue pipe system must meet the
requirements of the Building Regulations.
A flexible flue liner system can be used if certified for
use with solid fuel systems and installation complies with
manufacturer’s instructions and Building Regulations.
The flue liner must be replaced when an appliance is
replaced, unless proven to be recently installed and in
good condition.
If it is necessary to fit a register plate it must conform to
the Building Regulations.
The minimum height of the flue or chimney must be 4.5m
from the hearth to the top of the flue, with no horizontal
sections and a maximum of 4 bends. Bends must have
angles of less than 45 degrees from the vertical.
— There should be at least 600mm of vertical flue pipe
above the appliance before any bends are introduced.
Ensure the connecting flue pipe is kept a suitable
distance from any combustible material and does not
form part of the supporting structure of the building.
— The installer must ensure the flue pipe diameter is not
less than the diameter of the outlet of the appliance and
does not narrow to less than the size of the outlet at any
point in the system.
Make provision to remove the appliance without the need
to dismantle the chimney.
Any existing flue must be confirmed as suitable
for the new intended use as defined in the Building
Regulations.
The flue or chimney systems must be inspected and
swept to confirm the system is structurally sound and
free from obstructions.
If the chimney is believed to have previously served an
open fire it must be swept a second time within a month
of regular use after installation to clear any soot falls that
may have occurred due to difference in combustion
levels.
The flue exit from the building must comply with local
building control rules.
— Chimney heights and/or separations may need to
be increased in particular cases where wind exposure,
surrounding tall buildings, high trees or high ground could
have adverse effects on flue draught.
Do not connect or share the flue or chimney system with
another heating appliance.
Do not connect to systems containing large voids or spaces over
230mm square.
Suitable access must be provided to enable the collection and
removal of debris.
The flue must be swept and inspected when the appliance is
installed.
FLUE DRAUGHT
The flue draught must be checked with all windows and doors
closed and any extraction fans in this, or adjoining rooms, running
at maximum speed (see Installation Checklist for ventilation
requirements).
TWIN WALL FLUE SYSTEM
If this appliance is to be used in conjunction with a twin
wall flue system then Stovax recommend the use of their
Professional XQ range. Details of this product are available
from your Stovax retailer.
32

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Stovax Vision bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Stovax Vision in de taal/talen: Engels als bijlage per email.

De handleiding is 5.99 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Stovax Vision

Stovax Vision Gebruiksaanwijzing - English - 16 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info