42
The equipment is very heavy, if it has no machinery, it needs to be handled by more
than one person.
The first step is to assemble a series of parts so that they are ready before you start
moving the equipment. Place the 4 feet levelers on the 4 vertical columns, screwing them
to the bottom. With the help of an Allen wrench No. 6, mount 1 vertical column with its
symmetrical by means of 1 side rail (the shortest) using 2 screws DIN 912 M10x20mm.
You will get a subset like the one in the following figure, it is not necessary to tighten the
screws well, since you will have to remove them later.
Figure 34
To tighten the 2 screws DIN 912 M10x20mm you will have to use the Allen key nº6
the process is very similar to the previous step, but in this case you will have to place the
front and rear rails (the longest ones) between the vertical columns and the side beam.
Tighten the screws but do not tighten them to allow the subassembly to fit the equipment.
Figure 35
Remove all the packaging that surrounds the equipment and leave it alone on the
pallet, remove the parts that are inside the combustion chamber, in this way will avoid
some weight and bumps or damage. Remove the 4 screws DIN 6921 M6x20mm with the