671246
7
Verklein
Vergroot
Pagina terug
1/48
Pagina verder
1
DESCRIPTION
The SANICUBIC
®
2 Pro is a lifting station
designed to evacuate effluent from small
private or commercial units.
Please comply with all the installation
and maintenance specifications set out
in these instructions, and especially the
information marked with the following
signs:
«
» Failure to comply with this
information could entail safety
hazards for personnel,
«
» Information warning of the pre-
sence of an electrical hazard,
«
» Instructions only for qualified
professional specialists,
«
WARNING» Failure to comply with this
information could affect the normal
operation of the equipment.
Please contact our Customer service for
further information.
SANICUBIC OPERATING PRINCIPLE
SANICUBIC
®
2 Pro contains 2 separate
pumps. Each of the pumps is fitted with a
high-performance maceration system.
The 2 pumps operate alternately. In the
event of inflow overload, both motors run
at the same time (or if one of the pumps
is faulty, the other one takes over).
The SANICUBIC
®
2 Pro tank is fitted with
2 dip tubes; one tube controls motor
operation, and the other one controls the
alarm system.
- Long pickup tube (normal operation): as
soon as the waste water level in the tank
reaches the triggering point in the long
tube, the pumping system starts up.
- Short pickup tube (inflow overload
operation): if the waste water level in the
tank reaches the upper point, a contact
is closed, and the auxiliary pumping
system is triggered. The contact also
sets off an audible and visual alarm. The
general alarm LED on the SANICUBIC
®
2 Pro control panel switches to red. The
system sends a high-frequency malfunc-
tion signal to the remote alarm unit. The
SANICUBIC
®
2 Pro is fitted with a remote
alarm module that transmits a visible and
audible alarm (HF link).
2
LIST OF PARTS SUPPLIED
3
DIMENSIONS
4
TECHNICAL DATA SANICUBIC
®
2 Pro
Type R300
Maximum discharge head 11 m
Voltage 220-240V
Frequency 50 Hz
Volume 47 l
Maximum power input 3000 w
Maximum current input 13 A
Electrical classification I
Ave water temp for optimum performance 35°C
Maximum temperature (intermittent) 70°C*
Protection index IP67
Net weight (including accessories) 30 kg
*
Hot water drain cycles from dishwashers or washing machines
5
FIELD OF APPLICATION
Household waste water (the combined
inputs must not exceed 80% of those
shown in the graph
6
).
8
INSTALLATION
The SANICUBIC
®
2 Pro must be installed
in compliance with standard EN12056.
The equipment must be commissioned
and maintained by a qualified professio-
nal specialist.
Please refer to installation standard
EN 12056.
8a
REGULATIONS
1- Attention: the space in which the
SANICUBIC
®
2 Pro is to be installed
must be large enough to leave at least
600 mm of working room around and
above the unit to facilitate such
maintenance work as may be required.
There must be sufficient lighting, and it
must be sufficiently well ventilated and
protected from freezing.
2- Isolating valves (not supplied) must
be fitted on waste inlets (especially
the 110mm inlets) and on the dis-
charge to ensure that any
service/maintenance may be carried
out safely).
3- The discharge pipe must be fitted
so as to avoid all back flow from the
drainage system (see the examples in
drawing
8g
). Back flow can be avoided
by installing an anti-back flow riser
reaching a high point above the
maximum back flow level.
Comment: In the absence of local
information to the contrary, the
maximum back flow level corresponds
to street level (roadway, pavements,
etc.). Continue the discharge pipework
after the anti-backflow riser, using a
larger diameter pipe.
4- If the SANICUBIC is installed in a
space such as a pit for example, we
would recommend the fitting of a bilge
pump in case of flooding.
5- The lifting station must be vented with
an outlet at roof level.
6- The lifting station must be fixed to the
floor (see paragraph
8h
).
8b
CONNECTING THE DISCHARGE
PIPE
Remove the end cover or covers from the
back of the unit (cf.
8g
1
).
As each pump is fitted with a macerator
system, an ND50 mm discharge pipe can
be used.
The discharge bend is at the centre of the
unit, at the back (cf.
8b
). Use the sleeve
D
to connect it to the riser pipe and fix it
in place with the collars.
Each pump in the SANICUBIC
®
2 Pro
unit is fitted with check valves.
See paragraph
8a
regarding control
valves and back flow.
8c
CONNECTING SANITARY
EQUIPMENT TO THE LOWER
INLETS
If you want to install a shower or a
bath at the same level as the
SANICUBIC
®
2 Pro, you must
make sure that the upper parts of the
plugholes on the sanitary equipment are
at least 250 mm above the lower inlets.
8d
CONNECTING THE INLETS ND
40/50
Lower inlets (cf.
8d
1
)
Upper inlets (cf.
8d
2
)
Cut off the end of the ND 50 inlet with
a saw
Cut the sleeve
D
to suit the pipe
diameter: ND 40 or ND 50 (cf.
8d
3
)
Fix the sleeve
D
on the inlet and on the
pipe, using the collars.
8e
CONNECTING THE ND 100/110
INLET
Lower inlets (cf.
8e
1
)
1- Remove the plug from the side inlet.
2- Fix the sleeve
F
in place using the
collar
J
.
3- Fully insert the ND 100/110 tube in
the other end of the sleeve and fix it in
place using the other collar
J
.
Upper inlets (cf.
8e
2
)
1- Cut off the upper end of the ND 100
inlet with a saw.
2- Fix the sleeve
F
in place using the
collar
J
.
3- Fully insert the ND 100/110 tube in
the other end of the sleeve and fix it in
place using the other collar
J
.
8f
CONNECTING THE VENT
The SANICUBIC
®
2 Pro must be vented
with an outlet at roof level.
Fix the sleeve
D
in place using the
collar
C
.
Fully insert the ND 50 tube in the other
end of the sleeve and fix it in place using
the other collar
C
.
WARNING: Do NOT fit air admittance
valve on the top of the air vent pipe. The
vent must be an open vent or the unit will
not operate.
UK
6
PERFORMANCE CURVE
Example: Pump P1 is operating nor-
mally. It discharges 160 l/min at a pum-
ping height of 5 m. If pump P1 shows any
signs of weakness or if the waste water
inflow is too great, pump P2 starts up.
The output is then increased to about 275
l/min, until the situation returns to normal.
The numbers refer to the explanatory diagrams.
7
RATIO OF HEIGHT/LENGTH
FOR DISCHARGE
Fully illustrated step by step
instructions are downloadable
on www.saniflo.co.uk
7

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Sanibroyeur SANICUBIC 2 Pro bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Sanibroyeur SANICUBIC 2 Pro in de taal/talen: Alle talen als bijlage per email.

De handleiding is 2,16 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info