8
a) Mark dowel positions of the variable wall holders
under consideration of the minimum clearances
(Fig.1, page 2). Insert dowels and tighten. (Please mind
the positions of the locating screw. They are to be used
for the upper holes) (Fig.2).The minimum clearance
between the wall holders is 12cm, the maximum
clearance is 40cm. Thus, it is possible to drill into the
gaps between the tiles.
Fig.3
Fig.2
b) Put the radiant heater onto the wall
holder (Fig.3). The device is provided
with a variable angle adjustment (Fig.5).
Simply place the device into the position
desired and tighten by means of the two
locating screws (Fig.4).
Fig.4
Fig.4
Fig.5
The device must be centrically
positioned towards the holders
(i.e. same distance on the left
and on the right) (Fig.6).
The locating screws (Fig. 4)
must be tightly screwed in to
ensure that the device does not
fall out of the holders.
Fig.6
Fig.6