15
14
TECHNICAL SPECIFICATIONS
Type of hob GKB 310 GKB 315 GKB 315 W GKB 318 GKB 377 GKB377 W
Electric:
3-core connection lead ■■■■■
Connection
AC 230 V - 50Hz - 0.6 VA ■■■■■
Spark switch integrated in
control buttons ■■■■■
Gas:
Connection G3/8” ■■■■■■
Dimensions (appliance):
580x40x510 wxhxd in mm ■■■■
685x40x510 wxhxd in mm ■■
Dimensions (recess):
560x480 wxd in mm ■■■■■■
Technical specifications (also see cover)
BUILDING-IN
Building-in
1. Make the cut-out in the work surface. Ensure
that there is sufficient space allowed at the
sides and at the back.
Please note:
■ The distance between the hob and the rear
wall must be at least 40 mm.
2. Make a hole in the side of the kitchen cabinet
to enable the gas pipe to be passed through.
3. Place the appliance in the cut-out.
4. Secure the appliance in position.
5. Make the gas connection. Check the gas
connections with a soap/water mixture
(see "Gas Connection").
6. Put the plug in the socket
(see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a
built-in oven is described in the installation guide
for the oven.
Attention!
■ The underside of this built-in hob becomes
hot. Take care that you do not place any
flammable or plastic objects in any drawer
under the appliance.
fig. 5
fig. 4
Packaging and appliances
The packaging of the appliance is recyclable. It is made up off:
– cardboard;
– polyethylene;
– CFK free polystyrene (PS rigid foam).
Please dispose of these materials in a responsible way in accordance with the regulations of
your local authority.
Your local authority will also be able to give you information about disposing disused household
appliances in a responsible way.