TECHNICAL SPECIFICATIONS
BUILDING-IN
Technical specifications (also see table on cover)
Type of hob GKB201 GKB206 GKV101 GKV106
Electric:
3-core connection lead ■■
Connection 230 V - 50Hz 0,8 VA ■■
Spark switch ■■
Gas:
Connection G3/8” ■■■■
Dimensions (appliance):
580x45x510 wxhxd in mm ■■
576x67x510 wxhxd in mm ■■
Dimensions (recess):
560x490 wxd in mm ■■■■
Building-in
1. Make the cut-out in the work surface. Ensure
that there is sufficient space allowed at the
sides and at the back.
.
Please note:
■ The area to be cut away at the front is
measured from 10 mm from the body of the
cupboard (cupboard front without door).
2. Make a hole in the side of the kitchen cabinet
to enable the gas pipe to be passed through.
3. Place the appliance in the cut-out.
4. Secure the appliance in position.
5. Make the gas connection. Check the gas
connections with a soap/water mixture
(see "Gas Connection").
6. Put the plug in the socket
(see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a
built-in oven is described in the installation guide
for the oven.
Attention!
■ The underside of this built-in hob (GKB)
becomes hot. Take care that you do not
place any flammable or plastic objects in
any drawer under the appliance.
fig. 5