ENGLISH
2
Fasten the drilling template to the wall leaving the necessary space from the ceiling, oor and side walls as shown on the template
that may be xed using adhesive tape.
Use a small drill or punch to mark, with extreme care, the exact centre of each of the holes to be drilled.
Using a core boring head measuring at least 162 mm to drill the two holes for entry and exit of the air.
WARNING: drill the foregoing holes tilted slightly downwards to prevent water from being fed back through the ducts
(g. 7).
Most of the removed material is expelled outwards, therefore make sure that it does not hit any person or object when it falls out.
In order to avoid as much as possible outer plaster breaking, it is necessary to proceed carefully with the last part of hole execution,
decreasing pressure on core borers.
Next, drill the holes for anchoring the fastening brackets to the wall using as a rst option the 4 holes on the ends of the bracket
as shown on the drilling template.
If the wall is not very solid, it is advisable to use some extra anchor bolts.
As you can see, the bracket can be fastened in a number of different ways and positions. The majority of the weight of the appliance
is to the right side so ensure that xing is more secure on this side.The anchor bolts provided require holes with a diameter of 10
mm.
In any case, the wall should be inspected carefully to determine the best possible anchorage and type of bolts suitable for particular
situations.
WARNING: the manufacturer will not be held liable for any underestimates made in the structural consistency of the anchor prepared
by the installer.
Therefore, pay utmost attention to the foregoing operation that could cause serious injury/damage to people/property if carried out
incorrectly.
When installing models equipped with heating pump, if no condensate discharge was built into the wall (see paragraph 2.1.6), in
order to drain the condensate it will be necessary to drill a hole through the wall in the position shown on the template.
2.1.6 Preparing the condensate discharge (gg. 8, 9, 10)
The condensate discharge pipe (supplied) must be connected to the UNICO BOILER MASTER by coupling it with the specic
vent (g. 8 ref. A) that is on the back of the machine (remove cap B). When the max level is reached, a solenoid valve ensures the
condensate will ow out from the internal tray.
Since condensate drains by gravity, there must be a minimum slope of at least 3% at every point of the discharge line. Use a rigid
or exible tube having an inside diameter of at least 16 mm.
If the line empties into a sewerage system, install a siphon before the point in which the pipe reaches the main discharge, at least
300 mm below the inlet from the unit (g. 8).
If the drainpipe drains into a vessel (tank or other container), this container should not be sealed and the drainpipe should not
remain immersed in the water (see g. 9).
The hole through which the condensate pipe passes should always slope towards the outside (see g. 10).
The exact position in which to place the pipe inlet, as compared to the machine, is shown on the drilling template.
CAUTION: make sure, in this case, that the water expelled outward does not damage or disturb persons or property.
During the winter this type of drainage may cause sheets of ice to form.
When the condensate drainage is tted, pay much attention not to compress the rubber hose.
2.1.7 Assembly of the air ducts and external grids (g. 11, 12, 13, 14, 15, 16)
After having drilled the holes, insert the plastic sheet supplied with the conditioner into them.
Since the sheet was made for 202 mm holes, you will have to cut off 130 mm from the long side of the sheet for the 162 mm holes.
The length of the sheets must be 65 mm less than the thickness of the wall.
Roll the sheet and insert it into the hole (g. 11), paying attention to the splicing line (g. 11 ref. A), which must always
upwards.
Use an ordinary cutter for the foregoing operation (g. 11).
To position the external grids, proceed as follows:
- Apply the seal (g. 12 ref. B) to the wall ange (g. 12 ref. A), ensuring it lines up with the outer edge of the ange as indicated
in the gure.
- Fix the two anges using 2 pegs having a diameter of 6 and check that the two xing holes are horizontal.
- Fit the small eyelet of the spring, with the long stem, on the cap pin (on both components) (g. 13).
- Insert the two caps (with spring), on the front part of the external grid, on its two housings, pulling until it clicks (g. 14) and
couple the two chains to the large eyelet of the spring.
- Using one hand, grip the two chains connected to the grid.
- Bend the external grids back, gripping them with your free hand where they bend, and insert your ngers inside the single
2
40

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Olimpia Splendid Unico Boiler bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Olimpia Splendid Unico Boiler in de taal/talen: Duits, Engels, Frans, Italiaans, Spaans als bijlage per email.

De handleiding is 21,81 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info