SECTION 7 - ROuTINE SERvICINg INSTRuCTIONS
7.1
SERVICING SCHEDULE
Fortheverylatestcopyofliteratureforspecication,maintenancepracticesandpartsreplacement,visitourwebsitewww.morcoproducts.co.uk
where you will be able to download the relevant information.
WARNING. Always turn OFF the gas supply at the gas service cock, and switch OFF and disconnect the electricity supply to
the appliance before servicing.
Combustion testing must be carried out by a competent person using a combustion analyser conforming to BS7927.
Toensurethecontinuedsafeandefcientoperationoftheapplianceitisrecommendedthatitischeckedatregularintervalsand
serviced as necessary. The frequency of servicing will depend upon the installation condition and usage but should be carried out at
least annually.
ItisthelawthatanyserviceworkmustbecarriedoutbyaGasSafeRegisteredEngineer,orinothercountriesaqualiedand
competent Gas Installer.
INSPECTION
1. Light the boiler and carry out a pre-service check, noting any
operational faults.
2.Checktheueterminal(andterminalguardiftted)is
undamaged and clear of any obstruction.
3. Check all water and gas joints for signs of leakage. Remake
any suspect joints ensuring a gas tightness check is carried
outifapplicableandthewatersystemiscorrectlyrelled,
vented and re-pressurised.
CLEANING PROCEDURE
Note. In order to carry out either servicing or replacement of
components the boiler upper and lower front panels must
be removed. Refer to Frame 7.2.
1. Clean the main burner. Refer to Frame 7.4.
2. Cleantheheatexchanger&condensatetrap/siphon.Referto
Frames7.5&7.6.
3.
Check the main injector for blockage or damage. Refer to
Frame 7.3.
4. Checkthattheueterminalisunobstructedandthattheue
system is sealed correctly.
The cleaning procedures are covered more fully in Frames 7.3-7.7
and MUST be carried out in sequence.
IMPORTANT.
5. After completing the servicing or exchange of components
always test for gas tightness.
6. When work is complete the front panels MUST be correctly
retted,ensuringthatagoodsealismade.
Do NOT OPERATE the boiler if the upper front
panel is not tted.
7. If, for any reason, the condensate trap/siphon has been
removedensurethetrapisrelledwithwaterbefore
reassembling.
8. Check the gas consumption if on metered installations.
9.
Checkcombustionbyconnectingtheuegasanalysertothe
uegassamplingpointasshowninthediagramandmeasure
CO&CO
2
.
If the CO/CO
2
ratio is greater than 0.004 AND the integrity of
thecompleteuesystemandcombustioncircuitsealshave
beenveriedandtheinletgaspressurehavebeenveried,
then contact Morco.
Flue Sampling Point
Air Sample
Point
Ensure all caps and seals
are re-fitted after use
GENERAL
Please Note: During routine servicing, and after any maintenance
or change of part of the combustion circuit, the following must be
checked:
- Theintegrityoftheuesystemandtheueseals,
- The integrity of the boiler combustion circuit and the relevant seals
- The operational (working) gas inlet pressure at maximum rate.
Turn on one or more DHW taps.
- The combustion performance.
COMPETENCE TO CARRY OUT THE CHECK OF
COMBUSTION PERFORMANCE
Please Note: BS6798:2009Specicationforinstallationand
maintenanceofgas-redboilersofratedinputnotexceeding70kW
net advises that:
- The person carrying out a combustion measurement should have
beenassessedascompetentintheuseofauegasanalyserand
the interpretation of the results.
- Theuegasanalyserusedshouldbeonemeetingthe
requirements of BS7927 or BS-EN50379-3 and be calibrated in
accordance with the analyser manufacturers requirements, and
- Competence can be demonstrated, for example, by satisfactory
completion of the CPA1 ACS assessment (UK Only), which
covers the use of electronic portable combustion gas analysers in
accordance with BS7967, Parts 1 to 4.
SERVICE MODE
To access the service mode:
Using the central heating potentiometer, starting from the 11 o’clock
position, move the thumb piece to the maximum position, back to the
11o’clockpositionandthennallynishatthemaximumposition.
The letter “S” will now be displayed.
To toggle to maximum DHW output move the thumb piece up to
the 11 o’clock position and then back to maximum. A minimum of 3
seconds will reset the boiler back to normal mode.
25

Hulp nodig? Stel uw vraag in het forum

Spelregels
1

Forum

Morco-GB30

Zoeken resetten

  • quel est la consommation de la bouteille de gaz propane pour 12 heures de chauffage avec la chaudière GB24 SII Gesteld op 28-12-2022 om 17:07

    Reageer op deze vraag Misbruik melden

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Morco GB30 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Morco GB30 in de taal/talen: Engels als bijlage per email.

De handleiding is 7,41 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Morco GB30

Morco GB30 Gebruiksaanwijzing - Nederlands - 10 pagina's

Morco GB30 Gebruiksaanwijzing - English - 8 pagina's

Morco GB30 Gebruiksaanwijzing - Français - 10 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info