646332
12
Verklein
Vergroot
Pagina terug
1/36
Pagina verder
12
SECTION 4 - gENEral INSTallaTION rEquIrEmENTS
4.1 RECOMMENDATIONS
Current Gas Safety (Installation and Use) Regulation or Rules in
Force.
Theboilerissuitableonlyforinstallationinthespeciedcountries
and should be installed in accordance with the rules in force.
In GB, the installation must be carried out by a Gas Safe
RegisteredEngineer,orinothercountriesaqualiedand
competent Gas Installer. It must be carried out in accordance with
the relevant requirement of the:
• GasSafety(InstallationandUse)Regulations
• AppropriateNationalStandards
• TheWaterFittingsRegulations
• CurrentIEEWiringRegulations
• Health&SafetyDocumentNol.635
• TheElectricityatworkRegulations1989.
• BS5482Part1CodeofPracticeforDomesticbutaneand
propane gas burning installation in permanent dwellings,
residential park homes and commercial premises.
• BSEN1949:2011SpecicationfortheinstallationofLPG
Systems for habitation purposes in leisure accommodation
vehicles and other road vehicles.
IMPORTANT
The manufacturer’s notes MUST NOT be taken, in any way as
overriding statutory obligations.
4.2 BOILER LOCATION
Theboilermustbeinstalledonaatandverticalwall,capableof
adequately supporting the weight of the boiler and any ancillary
equipment.
Theboilermaybettedonacombustiblewallandinsulation
between the wall and the boiler is not necessary unless required
by National Standards.
For Electrical Safety reasons there must be no access available
from the rear of the boiler.
Theboilermustnotbettedoutside.
BATHROOM INSTALLATIONS
This appliance is rated IP20.
The boiler may be installed in any room or internal space, although
particular attention is drawn to the requirements of the current
IEE (BS.7671) Wiring Regulations and the electrical provisions
of the building regulations applicable in Scotland, with respect to
the installation of the boiler in a room or internal space containing
a bath or shower. For IE reference should be made to the current
ETCI rules for electrical installations and I.S. 813:2002.
If the appliance is to be installed in a room containing a bath or
shower then, providing water jets are not going to be used for
cleaning purposes (as in communal baths/showers), the appliance
must be installed beyond Zone 2, as detailed in BS.7671.
0.6m
Zone 0
Recessed
window
Zone 2
Ceiling
3G8913a
2.25m
Zone 1
COMPARTMENT INSTALLATIONS
A compartment used to enclose the boiler should be designed
and constructed specially for this purpose.
An existing cupboard or compartment may be used, provided
thatitismodiedforthepurpose.
• ThepositionselectedforinstallationMUSTallowadequate
space for servicing in front of the boiler.
4.3 FLUE TERMINAL POSITION
Pluming will occur at the terminal so avoid locations where this
will cause a nuisance.
The boiler MUST be installed so that the terminal is exposed to
external air.
It is important that the positions of the terminal allows the free
passage of air accross it at all times.
Minimum acceptable spacing from the terminal to obstructions
andventilationpumparespeciedinthetablebelow.
ForCaravanHolidayHomes;iftheheightoftheueterminal
from any ground, decking or steps is under 1.5m then a suitable
terminalguardshouldbetted.
For Residential Park Homes, please refer to BS 5440 Part 1.
Terminal Guards are available from boiler suppliers.
TFC Flue Guard - Model K6 Round Plastic Coated.
www.tfc-group.co.uk
* Only one reduction down to 25mm is allowable per installation
otherwise BS5440-1 2008 dimensions must be followed.
Flue Terminal Positions
Min. Spacing*
1. Directly below, above or alongside an opening
window, air vent or other ventilation opening. 300mm (12”)
2. Below guttering, drain pipes or soil pipes. 25mm ( 1”)*
BS5440-1 2008 75mm (3”)
3. Below eaves. 25mm (1”)*
BS5440-1 2008 200mm (8”)
4. Below balconies or a car port roof. 25mm (1”)*
BS5440-1 2008 200mm (8”)
5. From vertical drain pipes or soil pipes. 25mm (1”)*
BS5440-1 2008 150mm (6”)
6. From an internal or external corner or to a 25mm (1”)*
boundary along side the terminal. BS5440-1 2008 300mm (12”)
7. Above adjacent ground, roof or balcony level. 300mm (12”)
8. From a surface or a boundary facing the terminal. 600mm (24”)
9. From a terminal facing a terminal. 1,200mm (48”)
10. From an opening in a car port
(e.g. door or window) into dwelling. 1,200mm (48”)
11. Vertically from a terminal on the same wall. 1,500mm (60”)
12. Horizontally from a terminal on the wall. 300mm (12”)
Vertical Terminals
13. Above the roof pitch with roof slope of all angles. 300mm (12”)
Aboveatroof. 300mm(12”)
14. From a single wall face. 300mm (12”)
From corner walls. 300mm (12”)
15. Below velux window 2000mm (79”)
16. Above or side of velux window 600mm (24”)
Table 4 - Balanced Flue Terminal Position
12

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Morco GB24 SII bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Morco GB24 SII in de taal/talen: Engels als bijlage per email.

De handleiding is 6,25 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Morco GB24 SII

Morco GB24 SII Gebruiksaanwijzing - Nederlands - 10 pagina's

Morco GB24 SII Gebruiksaanwijzing - Français - 10 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info