14 Manual for installation and operation, Comfort 211 accu, solar GB (#76810)
6.3 / 4
• Open the door.
• Determine the highest point that the door reaches
during operation.
At the highest point reached by the door, the upper
edge of the door leaf must be 10 - 50 mm below the
horizontal underside of the drive boom.
The drive boom must be mounted parallel to the door
booms.
• Close the door.
10 - 50 mm
6. Installation
6.3 Installation on swing-out retractable
up-and-over doors
• Connect both door link brackets (A) with the door
connector (B).
6.3 / 2
B
C
C
6.3 / 1
B
• Drill the necessary holes in the upper edge of the
door leaf (ø 5 mm).
• Screw the door connector (B) to the upper edge of
the door leaf using 4 screws (C).
A
• Locate the door connector position in the middle
of the upper edge of the door leaf.
Advice:
If the door connector cannot be
positioned in the centre (for doors
with centre outside handles and for low
ceiling heights), it must be mounted
approx. 100 mm left or right from the
door centre.
6.3 x 16
6.3 / 3