19
For fastening the blast chiller in the cabinet, open the
door and lift the lower door to access the lateral
mounting holes. Use the 4 screws provided (fig. 12)
Important! In choosing the place of location, also make
sure that there is enough space for opening the main
door and lower door.
Important! The power cable is 2.5 meters long and for
problems related to overheating it is not possible to use
extension cords or cables to lengthen it.
Take into account the position of the sockets for the
arrangement of the blast chiller.
It is also recommended to strictly comply with the
following provisions.
ROOM TEMPERATURE AND AIR CHANGING
The ambient operating temperature must not exceed
32°C. The yields declared are not guaranteed above this temperature.
FINAL CHECKS
Before turning on the equipment check the following:
• if the equipment has been transported in a non-vertical position (for example on the back) or it has been
overturned during installation, do not turn on immediately but wait at least 4 hours before operating.
• Check the correct electrical connection.
After completing these checks:
• Check the power input with an ammeter.
• Perform at least one full blast chilling or rapid freezing cycle.
• Inform the customer of the exact use of the appliance with specific reference to the use and the needs of the
customer.
SAFETY AND CONTROL SYSTEMS
• Fuses for general protection that protect all the power circuit from short circuits and overloads.
• Clixon compressor which intervenes in the event of overload or malfunction.
• Safety pressure switch that intervenes in case of overpressure in the refrigerant circuit.
• Temperature control in the chamber controlled by the electronic board through a probe.
Fig. 12