5
List of spare parts page 38-39
When ordering spare parts, always state the full article number,
spare-partnumber, the quantity required and the S/N of the product
(see handling).
Example order: Art.no. 07664-000 / spare-part no. 10100030
/ 2 pieces / S/N ....................
Please keep original packaging of this article, so that it may be
used for transport at a later date, if necessary.
Goods may only be returned after prior arrangement and in
(internal) packaging, which is safe for transportation, in the original
box if possible.
It is important to provide a detailed defect description / damage
report!
Important: spare part prices do not include fastening material; if
fastening material (bolts, nuts, washers etc.) is required, this should
be clearly stated on the order by adding the words „with fastening
material“.
Waste Disposal
KETTLER products are recyclable. At the end of its useful life please
dispose of this article correctly and safely (local refuse sites).
KETTLER GB Ltd.
Kettler House, Merse Road
North Moons Moat
Redditch, Worcestershire B98 9HL
+44 1527 591901 +44 1527 62423
www.kettler.co.uk Mail: sales@kettler.co.uk
KETTLER International Inc.
1355 London Bridge Road +1 888 253 8853
Virginia Beach, VA 23453 +1 888 222 9333
www.kettlerusa.com
Instructions for Assembly
RISK! Ensure that your working area is free of possible sources
of danger, for example don’t leave any tools lying around. Always
dispose packaging material in such a way that it may not cause
any danger. There is always a risk of suffocation if children play
with plastic bags!
■ Ensure that you have received all the parts required (see check
list) and that they are undamaged. Should you have any cause
for complaint, please contact your KETTLER dealer.
■ Before assembling the equipment, study the drawings carefully
and carry out the operations in the order shown by the diagrams.
The correct sequence is given in capital letters.
■ The equipment must be assembled with due care by an adult
person. If in doubt call upon the help of a second person, if pos-
sible technically talented.
■ Please note that there is
always
a danger of injury when
working with tools or doing manual work. Therefore please be
careful when assembling this machine.
■ The fastening material required for each assembly step is shown
in the diagram inset. Use the fastening material exactly as
instructed.
■ Bolt all the parts together loosely at first, and check that they
have been assembled correctly. Tighten the locknuts by hand
until resistance is felt, then use spanner to finally tighten nuts
completely against resistance (locking device). Then check that
all screw connections have been tightened firmly. Attention:
once locknuts have been unscrewed they no longer function cor-
rectly (the locking device is destroyed), and must be replaced.
■ For technical reasons, we reserve the right to carry out prelim-
inary assembly work (e.g. addition of tubing plugs).