771471
21
Verklein
Vergroot
Pagina terug
1/48
Pagina verder
5.5 Water pipe installation
NOTE
If there is no glycol (anti-freeze) in the system there is a power
supply or pump failure, drain the system (as shown in the
figure below).
WARNING
A <A
When water is not moving inside the system in
cold weather, freezing is very likely and will
damage the system.
5.5.1 Water quality control
1 Water quality control
When industrial water is used as chilled water, little furring may
occur; however, well water or river water, used as chilled water,
may cause much sediment, such as furring, sand, and so on.
Therefore, well water or river water must be filtered and softened
in softening water equipment before flowing into chilled water
system. If sand and clay settle in the evaporator, circulation of
chilled water may be blocked, and thus leading to freezing
accidents; if hardness of chilled water is too high, furring may
occur easily, and the devices may be corroded. Therefore, the
quality of chilled water should be analysed before being used,
such as PH value, conductivity, concentration of chloride ion,
concentration of sulphide ion, and so on.
2 Applicable standard of water quality for the unit
PH value
68
Total hardness
<50ppm
Conductivity
<200μV/cm(25℃)
Sulfide ion
No
Chloride ion
<50ppm
Ammonia ion
No
Sulfate ion
<50ppm
Silicon
<30ppm
Iron content
<0.3ppm
Sodium ion
No requirement
Calcium ion
<50ppm
5.5.2 Checking the water circuit
The units are equipped with a water inlet and outlet for connection to
a water circuit. This circuit must be provided by a licensed technician
and must comply with local laws and regulations.
The unit is only to be used in a closed water system.
Application in an open water circuit can lead to excessive
corrosion of the water piping.
Before continuing installation of the unit, check the following:
The maximum water pressure can not exceed 3 bar.
The maximum water temperature is 60°C according to safety
device setting.
Always use materials that are compatible with the water used in the
system and with the materials used in the unit.
Ensure that components installed in the field piping can withstand
the water pressure and temperature.
Drain taps must be provided at all low points of the system to
permit complete drainage of the circuit during maintenance.
Air vents must be provided at all high points of the system. The
vents should be located at points that are easily accessible for
servicing. An automatic air purge is provided inside the unit. Check
that this air purge valve is not tightened too much so that
automatic release of air in the water circuit remains possible.
5.5.3 Checking the water volume and expansion vessel
pre-pressure
The unit is equipped with expansion vessel that has a
default pre-pressure of 1.5 bar.
To assure proper operation of the unit, the pre-pressure of the
expansion vessel might need to be adjusted and the minimum
and maximum water volume must be checked.
1. Check that the total water volume in the installation, excluding
the internal water volume of the unit, is at least 20L. Refer to 14
Technical specifications to find the total internal water volume of
the unit.
NOTE
In most applications this minimum water volume will
be satisfactory.
In critical processes or in rooms with a high heat load
though, extra water might be required.
When circulation in each space heating loop is controlled by
remotely controlled valves, it is important that this minimum water
volume is kept even if all the valves are closed.
2. Using the table below, determine if the expansion vessel
pre- pressure requires adjustment.
3. Using the table and instructions below, determine if the total
water volume in the installation is below the maximum allowed
water volume.
Installation
Water volume
height
5/7kW
58 L
5/7kW
58 L
difference(a)
10~16kW 88 L
10~16kW 88 L
Actions required:
• pre-pressure must be decreased,
calculate according to "Calculating
≤7 m
No pre-pressure adjustment
the pre-pressure of the expansion
vessel"
required.
• check if the water volume is lower
than maximum allowed water
volume (use graph below)
Actions required:
Pre-pressure must be increased,
calculate according to "Calculating
>7 m
the pre-pressure of the expansion
Expansion vessel of
the unit too
vessel" below.
small for the installation.
Check if the water volume is lower
than maximum allowed water
volume (use graph below)
(a) Installation height difference: height difference (m) between the
highest point of the water circuit and the unit. If the unit is located
at the highest point of the installation, the installation height
should be 0 m.
Calculating pre-pressure of the expansion vessel
The pre-pressure (Pg) to be set depends on the maximum installation
height difference (H) and is calculated as follows:
Pg(bar)=(H(m)/10+0.3) bar
Checking the maximum allowed water volume
To determine the maximum allowed water volume in the entire circuit,
proceed as follows:
1. Determine the calculated pre-pressure (Pg) for the
corresponding maximum water volume using the graph below.
20
21

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Kaysun KEM-07 DVN1 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Kaysun KEM-07 DVN1 in de taal/talen: Engels als bijlage per email.

De handleiding is 7.07 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Kaysun KEM-07 DVN1

Kaysun KEM-07 DVN1 Gebruiksaanwijzing - Nederlands - 48 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info