The heating appliance of the machine is an ignition plant.
Please follow the local regulations while installing it.
Use only certified chimneys/exhaust pipes.
DANGER
Scalding danger! This symbol must be attached at every tapping
point.
While installing a fuel tank for the heating oil in the machine in-
stallation room, please follow the regulations applicable to the
storage of inflammable fluids (can be acquired from Carl Hey-
manns Verlag, Cologne, www.heymanns.com).
Please follow the diagram given below for laying the fuel pipes.
It is necessary to provide a two-channel system - for the forward
and backward flow.
Maximum starting pressure of the fuel: 0.05 MPa (0.5 bar)
Maximum under-pressure between fuel filter and pump: 0.04
MPa (0.4 bar)
Suction pipe length in m
Suction height in m
Possible suction pipe length in pipes with NW 8
Each appliance must be connected to a separate chimney.
The exhaust system must be designed according to the local
rules and regulations after consulting the concerned chimney
expert.
We recommend the installation of a draught interceptor between
the plant and the chimney.
Note: The chimney draught specifications given in the technical
data must be maintained if you want to achieve the prescribed
combustion values.
Before installing, please check the load-bearing capacity of
the wall. The fastening material delivered with the plant is
suitable for concrete walls. Use suitable anchor plugs and
screws for hollow component walls, brick walls and gas con-
crete walls - for e.g. injection anchor (for drilling diagram see
the specifications sheet).
Figure 3 - items 19 and 23
The appliance should not be directly attached to the network
of water and high pressure pipes. It is mandatory to install the
connecting hoses.
Figure 3 - A
A shut-off tap must be installed between the main water sup-
ply and the connecting hose.
All national laws and regulations about installation of electrical
appliances must also be followed when installing high pressure
lines.
The pressure loss in the pipe connections must lie below 1.5 MPa.
The completed pipe connections must be checked using 28 MPa.
The insulation of the pipes must be resistant to temperatures
until 155 °C.
Figure 3 - Pos. 20
The tanks are to be installed in such a way that the lower level
mirror of the detergent should not be more than 1.5 m under the
machine floor and the upper level mirror should not be located
above the machine floor.
Figure 3 - B and item 19
The water inlet is to be connected to the main water supply
using an appropriate water hose.
The water supply must have a minimum output of 1300 l/h at
minimum 0.1 MPa.
The water temperature must lie below 30 °C.
ATTENTION
The highest allowed net impedance at the electrical connection
point (refer to technical data) is not to be exceeded. In case of
confusion regarding the power impedance present on your con-
nection, please contact your utilities provider.
Note: Operating procedures create short term power sinkings.
During unfavorable net conditions other devices might be dis-
turbed.
For connection values, see technical data and type plate.
The electrical connections must be done by an electrician ac-
cording to IEC 60364-1.
Current-carrying parts, cables and appliances in the working
area must be installed in a defectless state and must be pro-
tected against water sprays.
DANGER
To avoid accidents due to electrical faults we recommend the use
of sockets with a line-side current-limiting circuit breaker (max.
30 mA nominal tripping current).
Establish the electrical connection.
A main switch that can be locked (figure 3 - item 6) is to be in-
stalled at a safe and easily accessible place to switch off the sta-
tionary high pressure cleaner.
The contact opening of the main switch must be minimum 3 mm.
Install Cekon plug on the connection cable of the appliance.
Insert Cekon plug into the socket.
To switch off the stationary high pressure cleaner, the Cekon plug
must be easily accessible so that it can be removed from the
mains.
Before using for the first time, cut off the tip of the lid of the oil
tank on the water pump.
Installing the plant
Only for authorised technicians!
General
Replace high pressure
nozzle with steam
nozzle if working tem-
perature is above 100
°C.
Fuel tank for heater
Fuel pipes
Smoke pipe
Wall mount
!
4.116-001.0
4.116-000.0
Installing the high pressure connections
Install the detergent tank
Water supply
Electrical connection
Firmly installed electrical connection
Electrical connection with plug/ socket
Initial startup
35EN
35

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Karcher HDS 12-14-4 ST bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Karcher HDS 12-14-4 ST in de taal/talen: Alle talen als bijlage per email.

De handleiding is 17,62 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info