637681
14
Verklein
Vergroot
Pagina terug
1/20
Pagina verder
27
ENGLISH
Part 2: For the operator
When the CHECK LED switched OFF, the
regeneration cycle is nished.
The machine is now ready for use again.
ATTENTION
Programming of cycles for the start-up of regeneration
should be carried out by authorised technicians only (see
Part 3: Reserved for technicians, paragraph 3.2 Setting
cycles for REGENERATION PROMPT).
2.2 CLEANING (Fig. 10)
2.2.a General information
Strict compliance with the maintenance instructions in this
section will keep your machine in a good working condition
and will notably reduce the need for repairs.
ATTENTION
If any machine component becomes faulty, FIRST CHECK
that all the instructions given in the previous paragraphs
have been complied with during use.
Repairs must be carried out immediately, as soon as the
fault occurs. This will prevent the trouble from becoming
worse and damaging other parts.
ATTENTION
Daily operations to carry out when work has ended, with
the machine OFF , the main circuit-breaker disconnected,
the water cocks off and the washing tub empty.
1. Thoroughly clean the inside parts of the machine.
2. Remove the suction protection (23).
3. Remove the lter (22) from the bottom of the machine
by releasing the overow (21).
4. Wash the lters under running water and t them cor-
rectly back in their housings.
ATTENTION
Frequently check and clean the spraying units, removing
them from their housings and eliminating any dirt and
fouling. The frequency with which this operation must be
carried out depends on the quantity of dirt or on the unsa-
tisfactory washing results. Never use corrosive products
like sodium hypochlorite (bleach) or hydrochloric acid, wire
wool or steel brushes to clean either the inside or outside
parts of the machine.
2.3. PREVENTION MAINTENANCE (Fig. 10)
The preventive maintenance operations must be carried
out with the machine OFF, the main circuit-breaker di-
sconnected, the water delivery cocks off and the washing
tub empty.
2.3.a Checking and cleaning the spray arms and
nozzles (Fig. 10)
Periodically check to make sure that the lower washing
arm and rinsing arm (24/25) and their relative nozzles are
not clogged (26/27).
Cleaning the lower/upper unit
1. Unscrew the ring nut and lift the arm (24/25).
2. Wash the washing and rinsing arm.
If the nozzles (27) are clogged, unscrew them to de-
mount and clean, taking care to prevent the shape of
the nozzle from being deformed. After cleaning, t the
nozzles exactly back in their original positions.
3. Remount all parts by complying with the above in-
structions in reverse.
2.4 DESCALING
Where hard water is present lime scale deposits will for
in the machine and on dishes, which must, for reasons
of hygiene, be removed by descaling.
Advice on operation procedures and frequency for this
treatment are generally given by the detergent supplier,
who can provide suitable products.
In order to avoid damaging the machine, do not
exceed recommended doses, follow the detergent
producer’s directions scrupulously and, having
nished operations, rinse thoroughly.
2.5 TEMPORARY STOPPAGE
If the machine is to be left inactive for a period of some
weeks, it is advisable beforehand to load the tank and
run a few empty cycles with clean water then drain, so
as to avoid the formation of unpleasant odours.
If necessary, repeat the process several times until the
water is still clean after washing.
If the stoppage is to be very long, it is advisable to
drain the water from the boiler and from the electric
pump.
2.6 DEMOLITION and DISPOSAL
When the machine is to be scrapped, drain the water
from the tank and from the boiler, as indicated in the
points above, and disconnect the machine from the
water and electricity supply networks, then dispose of
the components according to current regulations, re
specting national and local ecological and environmetal
legislation, and taking care to separate the parts as
follows:
- metallic parts: body work, surfaces, panels, lters;
- electrical parts: motors, remote switches, micro-
switches, cabling;
- plastic parts: connectors, baskets;
- rubber parts: tubes, couplings
2.7 SCHEDULED MAINTENANCE
It is advisable to subject the machine to scheduled
maintenance every 6 months.
The producer declines all responsibility for any
printing errors contained in this booklet.
The instructions, drawings, tables and everything else
in this manual are of a condential technical nature.
For this reason, none of the information may be either
completely or partially duplicated or disclosed to
third parties without prior written authorization from
HOONVED which is the sole proprietor and which
reserves the right to make any modications as may
be considered necessary without advance warning.
14

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Hoonved DP 50E bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Hoonved DP 50E in de taal/talen: Engels als bijlage per email.

De handleiding is 1,62 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Hoonved DP 50E

Hoonved DP 50E Gebruiksaanwijzing - Deutsch - 20 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info