Select connection, select test standard IEC 62353/VDE 0751, classify DUT (SC I, II or III), application part? (type B/BF/CF)
Visual inspection
OK?
SC I: R
PE
OK?
R
INS
OK?
Short circuit
at DUT?
Yes/No
No
Display results; save / print reports
Yes
No
Test
OK?
Framed with dashed line:
The test is only run,
– if it has been activated in the initial
program window, or in the Setup
menu under Sequence
or
– if possible at all
Switch line voltage to test socket, start function test
Start
function test
I
EDL
I
RC
Contact all exposed, conductive parts with the probe.
The test can be repeated as often as desired for various protective
conductor parts with the manual sequence.*
* If it is not clear whether or not all
exposed, conductive parts are con-
nected to one another or to the
protective conductor, testing can be
performed in the manual mode.
Measurement 1
:
Contact all exposed, conductive parts with the probe
Yes
Switch DUT on
I
LC
I
PL
OK?
Connect application parts.
I
EPL
, only if the DUT can be switched on
I
PA
, for type B only
Mains to application part for type F
No
I
RC
or I
LC
, only if the DUT is switched electronically
OK?
No
No
No
N
Yes
Yes
Yes
I
EPL
Measurement 2
: Connect application parts
If the limit values of leakage currents are exceeded in the following sequence, the first measured values
or the manufacturer’s values can be entered instead for those leakage currents which did not pass.