776259
6
Verklein
Vergroot
Pagina terug
1/62
Pagina verder
6GMC-I Messtechnik GmbH
1 Scope of Delivery
1Test instrument
1 Shoulder strap
1 Battery pack
1 KS-PROFiTEST INTRO (Z503L)
1 Factory calibration certificate
1 Condensed operating instructions
1 Supplementary sheet with safety information
1 Comprehensive operating instructions available on the Inter-
net for download at www.gossenmetrawatt.com
2 Application
This test instrument fulfills all requirements of applicable European
and national EC directives. We confirm this with the CE mark. The
relevant declaration of conformity can be obtained from
GMC-I Messtechnik GmbH.
The measuring and test instrument allows for quick and efficient
testing of protective measures in accordance with DIN VDE 0100-
600:2008
(Erection of low-voltage installations; tests – initial tests),
as well as
ÖVE-EN 1 (Austria), NIV/NIN SEV 1000 (Switzerland)
and other country-specific regulations.
The test instrument complies with IEC 61557/EN 61557/
VDE 0413 regulations:
Part 1: General requirements
Part 2: Insulation resistance
Part 3: Loop resistance
Part 4:
Resistance of earth connection and equipotential bonding
Part 5: Earth resistance
Part 6: Effectiveness of residual current devices (RCDs) in TT and
TN systems
Part 7: Phase sequence
Part 10:Electrical safety in low-voltage systems up to 1000 V AC
and 1500 V DC – Equipment for testing, measuring or
monitoring of protective measures
The test instrument is especially well suited for:
•Systems setup
Initial start-up
Periodic testing
Troubleshooting in electrical systems
All of the values required for approval reports (e.g. per ZVEH) can
be measured with this test instrument.
All acquired data can be archived, and measurement and test
reports can be printed out at a PC. This is of special significance
where product liability is concerned.
The applications range of the test instrument covers all alternating
and three-phase current systems with nominal voltages of 230 V /
400 V (300 V / 500 V) and nominal frequencies of 16⅔ / 50 / 60 /
200/ 400Hz.
The following can be measured an tested with the test instrument:
Voltage / frequency / phase sequence
Loop impedance / line impedance
Residual current devices (RCDs)
Earth resistance / earth loop resistance (relative to the mains)
Insulation resistance
Low-value resistance (potential equalization)
Voltage drop
Refer to section 19.3 regarding testing of electrical machines in
accordance with DIN EN 60204.
Refer to section 19.3 for periodic testing in accordance with
DGUV regulation 3 (formerly BGV A3).
2.1 Using Cable Sets and Test Probes
KS-PROFiTEST INTRO (Z503L)
Remote control with measurement key (Z550A), optional
accessory
Measurements per DIN EN 61010-031 may only be performed in
environments in accordance with measuring categories III and IV
with the safety cap attached to the test probe at the end of the
measurement cable.
In order to establish contact inside 4 mm jacks, the safety caps
have to be removed by prying open the snap fastener with a
pointed object (e.g. the other test probe).
See also section 17.1, “Technical Data for Measurement Cables
and Adapters”, beginning on page 52.
2.2 Overview of Included Features
1The so-called live measurement is only advisable if there is no bias current within
the system. Only suitable for motor protection switches with small nominal current
values.
2Currently available languages: D, GB, I, F, E, P, NL, S, N, FIN, CZ, PL
PROFITEST INTRO (M520T)
Testing of residual current devices (RCDs)
UB measurement without tripping the RCD
Tripping time measurement
Measurement of tripping current IF
Selective, SRCDs, PRCDs, type G/R
AC/DC sensitive RCDs, types B and B+, EV, MI
Testing for N-PE reversal
Measurement of loop impedance ZL-PE / ZL-N
Fuse table for systems without RCDs
Without tripping the RCD, fuse table
With 15 mA test current1, without tripping the RCD
Earth resistance RE (mains operation)
Measurement of equipotential bonding RLO
Automatic polarity reversal
Insulation resistance RINS
Variable or rising test voltage (ramp)
Voltage UL-N / UL-PE / UN-PE / f
Special measurements
Phase sequence
Earth leakage resistance RE(INS)
Voltage drop (ΔU)
Features
Selectable user interface language 2
Memory (database for up to 50,000 objects)
RS 232 port for RFID/barcode reader
USB port for data transmission
ETC user PC software
Measuring category: CAT III 600 V / CAT IV 300 V
Factory calibration certificate
6

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Gossen Metrawatt Profitest Intro bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Gossen Metrawatt Profitest Intro in de taal/talen: Engels als bijlage per email.

De handleiding is 1.69 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info