GMC-I Messtechnik GmbH 91
Tests for electrical systems include “visual inspection”, “testing”
and “measurement”, and thus may only be conducted by experts
with appropriate work experience.
In the final analysis, the values from VDE 0664 are technically
binding.
21.3 Testing Electrical Machines per DIN EN 60204 –
Applications, Limit Values
The PROFITEST 204+ test instrument has been developed for the
testing of electrical machines and controllers. After a revision to
the standard in 2007, measurement of loop impedance is now
additionally required. Measurement of loop impedance, as well as
other measurements required for the testing of electrical
machines, can be performed with test instruments from the
PROFITEST MASTER series.
Comparison of Tests Specified by the Standards
Uninterrupted Connection of a Protective Conductor
Uninterrupted connection of a protective conductor system is
tested here be using an alternating current of 0.2 to 10 A with a
line frequency of 50 Hz (= low-resistance measurement). Testing
must be conducted between the PE terminal and various points
within the protective conductor system.
Loop Impedance Measurement
Loop impedance Z
L-PE
is measured and short-circuit current I
K
is
ascertained in order to determine if the breaking requirements for
protective devices have been fulfilled (see section 8).
Insulation Resistance Measurement
All of the active conductors in the primary circuit are short-cir-
cuited at the machine (L and N, or L1, L2, L3 and N) and mea-
sured against PE (protective conductor). Controllers or machine
components which are not laid out for these voltages (500 V DC)
can be disconnected from the measuring circuit for the duration
of the measurement. The measured value may not be any less
than 1 MOhm. The test can be subdivided into separate seg-
ments.
Voltage Tests (with PROFITEST 204HP/HV only)
The electrical equipment of the machine under test must with-
stand a test voltage of twice its own rated voltage value or 1000
V~ (whichever is largest) applied between the conductors of all
circuits and the protective conductor system for a period of at
least 1 second. The test voltage must have a frequency of 50 Hz,
and must be generated by a transformer with a minimum power
rating of 500 VA.
Voltage Measurement
The EN 60204 standard specifies that after switching supply
power off, residual voltage must drop to a value of 60 V or less
within 5 seconds at all accessible, active components of a
machine to which a voltage of greater that 60 V is applied during
operation.
Function Test
The machine is operated with nominal voltage and tested for cor-
rect functioning, in particular with regard to safety functions.
Special Tests
Pulse control mode for troubleshooting (with
PROFITEST 204HP/HV only)
Protective conductor test with 10 A test current (with
PROFITEST 204+ only)
Limit Values per DIN EN 60204, Part 1
Overvoltage Protection Device Characteristics for
Limit Value Selection for Protective Conductor Testing
Tests per DIN EN 60204, part 1
(machines)
Tests per DIN EN 61557
(systems)
Meas.
Func-
tion
Uninterrupted connection of a
protective conductor
Part 4: resistance of:
– Ground conductor
– Protective conductor
– Bonding conductor
RLO
Loop impedance Part 3: loop impedance ZL-PE
Insulation resistance Part 2: insulation resistance RISO
Voltage test
(test for absence of voltage)
——
Voltage measurement (protec-
tion against residual voltage)
Part 10: Combined measuring
equipment (amongst others for volt-
age measurement) for testing, mea-
suring or monitoring of protective
measures
U
Function test ——
Measurement Parameter Cross-
Section
Standard
Value
Protective conduc-
tor measurement
Test Duration 10 s
Limit value for protective
conductor resistance
based on phase conductor
cross-section and charac-
teristics of the overvoltage
protection device (calcu-
lated value)
1.5 mm²
2.5 mm²
4.0 mm²
6.0 mm²
10 mm²
16 mm²
25 mm² L
(16 mm² PE)
35 mm² L
(16 mm² PE)
50 mm² L
(25 mm² PE)
70 mm² L
(35 mm² PE)
95 mm² L
(50 mm² PE)
120 mm² L
(70 mm² PE)
500 m
500 m
500 m
400 m
300 m
200 m
200 m
100 m
100 m
100 m
050 m
050 m
Insulation resistance
measurement
Nominal voltage 500 V DC
Resistance limit value 1M
Leakage current
measurement
Leakage current 2.0 mA
Voltage measure-
ment
Discharge time 5 s
Voltage test
Test duration 1 s
Test voltage 1 kV
or 2 U
N
Breaking Time, Characteristics Available for Cross-Section
Fuse breaking time: 5 s All cross-sections
Fuse breaking time: 0.4 s 1.5 through 16 sq. mm
Circuit breaker, characteristic B
Ia = 5 x In – breaking time: 0.1s
1.5 through 16 sq. mm
Circuit breaker, characteristic C
Ia = 10x In – breaking time: 0.1s
1.5 through 16 sq. mm
Adjustable circuit breaker
Ia = 8 x In - break time: 0.1s
All cross-sections
91

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Gossen Metrawatt PROFITEST MPRO bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Gossen Metrawatt PROFITEST MPRO in de taal/talen: Engels als bijlage per email.

De handleiding is 2,28 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Gossen Metrawatt PROFITEST MPRO

Gossen Metrawatt PROFITEST MPRO Gebruiksaanwijzing - Nederlands - 92 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info