590776
4
Verklein
Vergroot
Pagina terug
1/96
Pagina verder
4 GMC-I Messtechnik GmbH
Table of Contents Page Page
1 Scope of delivery ............................................................. 5
2 Applications ..................................................................... 5
2.1 Using Cable Sets and Test Probes ...............................................5
2.2 Overview of Features Included
with PROFITEST MASTER & SECULIFE IP Device Variants ..........6
3 Safety Features and Precautions ..................................... 6
4 Initial Start-Up .................................................................. 7
4.1 Preparation for use ......................................................................7
4.2 Installing or Replacing the Battery Pack .....................................7
4.3 Switching the Instrument On/Off .................................................7
4.4 Battery Test .................................................................................7
4.5 Charging the Battery Pack in the Tester .....................................7
4.6 Device Settings ...........................................................................8
5 General Notes ................................................................ 13
5.1 Connecting the Instrument ........................................................13
5.2 Automatic Settings, Monitoring and Shut-Off ...........................13
5.3 Measurement Value Display and Memory .................................13
5.4 Testing Earthing Contact Sockets for Correct Connection ........13
5.5 Help Function ............................................................................14
5.6 Setting Parameters or Limit Values using RCD Measurement as an
Example .....................................................................................14
5.7 Freely Selectable Parameter Settings or Limit Values ..............15
5.8 2-Pole Measurement with Fast or Semiautomatic Polarity Reversal ... 15
6 Measuring Voltage and Frequency ................................ 16
6.1 Single-Phase Measurement ......................................................16
6.1.1 Voltage Between L and N (U
L-N
),
L and PE
(U
L-PE
) a
nd N and PE
(U
N-PE
)
with Country-Specific Plug Insert, e.g. SCHUKO .............................16
6.1.2 Voltage between L – PE, N – PE and L – L with 2-Pole Adapter Connection 16
6.2 3-Phase Measurement (line-to-line voltage) and Phase Sequence 17
7
Testing RCDs .......................................................................17
7.1 Measuring Contact Voltage (with reference to nominal residual
current) with
1
/
3
Nominal Residual Current and Tripping Test with
Nominal Residual Current .........................................................18
7.2
Special Testing for Systems and RCCBs .........................................20
7.2.1 Testing Systems and RCCBs with Rising Residual Current (AC) for Type
AC, A/F, B/B+ and EV RCDs .........................................................20
7.2.2 Testing Systems and RCCBs with Rising Residual Current (AC) for Type
B/B+ and EV RCDs (nur MTECH+, MXTRA & SECULIFE IP) ............20
7.2.3 Testing RCCBS with 5 I
N .............................................................21
7.2.4 Testing of RCCBs which are Suited for
Pulsating DC Residual Current ......................................................21
7.3 Testing for Special RCDs ...........................................................22
7.3.1 System, Type RCD-S Selective RCCBs ..........................................22
7.3.2 PRCDs with Non-Linear Type PRCD-K Elements ............................22
7.3.3 SRCD, PRCD-S (SCHUKOMAT, SIDOS or comparable) ....................23
7.3.4 Type G or R RCCB .......................................................................24
7.4 Testing Residual Current Circuit Breakers in TN-S Systems .....25
7.5 Testing of RCD Protection in IT Systems with High Cable
Capacitance (e.g. in Norway) ....................................................25
8 Testing of Breaking Requirements
Overcurrent Protective Devices,
Measurement of Loop Impedance and
Determination of Short-Circuit Current
(functions Z
L-PE
and I
K
) ................................................. 26
8.1 Measurements with Suppression of RCD Tripping ....................27
8.1.1 Measurement with Positive Half-Waves (only MTECH+/MXTRA/
SECULIFE IP) ...............................................................................27
8.2 Evaluation of Measured Values .................................................27
8.3
Settings for Short-circuit current Calculation – Parameter I
K
........28
9 Measuring Line Impedance (Z
L-N
function) ................... 28
10 Earthing Resistance Measurement (R
E
function) ........... 30
10.1 Earthing Resistance Measurement – Mains Operated ..............31
10.2 Earthing Resistance Measurement – Battery Powered
(only MPRO & MXTRA) ...............................................................31
10.3 Earthing Resistance, Mains Powered – 2-Pole Measurement with 2-
Pole Adapter or Country-Specific Plug (Schuko) without Probe ... 32
10.4 Earthing Resistance Measurement, Mains Powered – 3-Pole Me-
asurement: 2-Pole Adapter with Probe ....................................33
10.5 Earthing Resistance Measurement, Mains Powered – Measu-
rement of Earth Electrode Voltage (U
E
function) ......................34
10.6 Earthing Resistance Measurement, Mains Powered – Selective
Earthing Resistance Measurement with Current Clamp Sensor as
Accessory ..................................................................................35
10.7 Earthing Resistance Measurement, Battery Operated – 3-Pole
(only MPRO & MXTRA) ...............................................................37
10.8 Earthing Resistance Measurement, Battery Operated – 4-Pole
(only MPRO & MXTRA) ...............................................................38
10.9 Earthing Resistance Measurement, Battery Operated – Selective
(4-pole) with Current Clamp Sensor and PRO-RE Measuring Adap-
ter as Accessory (only MPRO & MXTRA) ...................................40
10.10 Earthing Resistance Measurement, Battery Powered – Ground Loop
Measurement (with current clamp sensor and transformer, plus PRO-
RE/2 measuring adapter as accessory) (only MPRO & MXTRA) ..... 41
10.11 Earthing Resistance Measurement, Battery Powered
– Measurement of Soil Resistivity
E
(only MPRO & MXTRA) ...42
11
Measuring Insulation Resistance ........................................ 44
11.1 General ......................................................................................44
11.2 Special Case: Earth Leakage Resistance (R
EISO
) .....................46
12 Measuring Low-Value Resistance
up to 200 Ohm
(protective
conductor and equipotential bonding conductor) ............... 47
12.1 Measurements with Constant Test Current ..............................48
12.2 Protective Conductor Resistance Measurement with Ramp Curve
– Measurements on PRCDs with Current-monitored Protective
Conductor Using PROFITEST PRCD Test Adapter as Accessory 49
13 Measurement with Accessory Sensors .......................... 50
13.1 Current Measurement with Current Clamp Sensor ...................50
14
Special Functions – EXTRA Switch Position ..............................51
14.1 Voltage Drop Measurement (at ZLN) – U Function .................52
14.2 Measuring the Impedance of Insulating Floors and Walls (standing
surface insulation impedance) – Z
ST
Function .........................53
14.3 Testing Meter Start-Up with Earthing Contact Plug
– kWh Function (not SECULIFE IP) .............................................54
14.4 Leakage Current Measurement
with PRO-AB Leakage Current Adapter as Accessory
– I
L
Function (PROFITEST MXTRA & SECULIFE IP only) .............55
14.5 Testing of Insulation Monitoring Devices – IMD Function
(PROFITEST MXTRA & SECULIFE IP only) ...................................56
14.6
Residual Voltage Test – Ures Function (
PROFITEST MXTRA
only) .....58
14.7
Intelligent Ramp – ta+ID Function (
PROFITEST MXTRA
only) ....... 59
14.7.1 Applications ................................................................................59
14.8 Testing Residual Current Monitors
– RCM Function (PROFITEST MXTRA only) ................................60
14.9 Testing the Operating States of Electric Vehicles at Charging Sta-
tions per IEC 61851 (MTECH+ & MXTRA only) ..........................61
14.10 Test Sequences for Report Generation of Fault Simulations on
PRCDs with PROFITEST PRCD Adapter (MXTRA only) ...............62
14.10.1 Selecting the PRCD under Test .....................................................62
14.10.2 Parameter Settings ......................................................................62
14.10.3 Test Sequence PRCD-S (single phase) – 11 Test Steps .................63
14.10.4 Test Sequence PRCD-S (three-phase) – 18 Test Steps ..................63
15 Automatic Test Sequences – AUTO Function ................. 64
16 Database ........................................................................ 66
16.1 Creating Distributor Structures, General ...................................66
4

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Gossen Metrawatt PROFITEST MPRO bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Gossen Metrawatt PROFITEST MPRO in de taal/talen: Engels als bijlage per email.

De handleiding is 2,28 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Gossen Metrawatt PROFITEST MPRO

Gossen Metrawatt PROFITEST MPRO Gebruiksaanwijzing - Nederlands - 92 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info