32
The extractor hood is designed to be mounted on
the wall.
•
During installation, optional accessories may
also require fitting.
•
Observe the minimum distance between hob
and extractor hood (see ”Safety instructions”)!
•
Avoid damaging the sensitive surfaces!
Preparing the wall
ṇ RISK OF INJURY,
DAMAGE TO PROPERTY
Before drilling the holes for the designated
installation location, check for concealed electrical
cables and other lines.
•
The wall must be level and vertical.
•
The enclosed screws and wall plugs are
suitable for solid brickwork. Use the
appropriate fixing materials for other wall
structures (e.g. plaster board, porous concrete,
poroton bricks).
Ensure that the wall has adequate load bearing
capacity.
•
Ensure that the depth of the drilled holes
corresponds with the length of the screws.
•
Ensure that the wall plugs are secure.
Max. weight: 40 kg.
Design subject to modification in line with technical
development.
Installation preparations
1 Mark a centre line on the wall from the ceiling
to the lower edge of the extractor hood.
2 Using the enclosed template, mark positions for
the screws and, to facilitate attachment, the
contour of the attachment area. The lower edge
of the template corresponds to the lower edge
of the extractor hood.
3 Drill 2x 8 mm holes for attachment of the
extractor hood and 2x 8 mm holes for the fixing
bracket for the flue duct and press in wall plugs
flush with the wall.
4 Screw on the fixing bracket for the flue duct.
5 Screw on the brackets for the extractor hood:
hand tight, max. 3 Nm.
Ensure that the washers and brackets are
positioned correctly!
Installation