Capacities (in accordance with DIN 18873-2)
Hourly capacity
Cups/h
Single prepa-
ration
Double prepara-
tion
Espresso 160 238
Coffee/café crème 109 141
Milk coffee 158 260
Cappuccino 149 200
Latte macchiato 114 200
Hot chocolate 129 -
Hot water 165 -
A1000 technical data (FCS4059)
Bean hopper 1.2kg per grinder
Powder container 1.2kg (may differ from this, depending on the powder used)
Grounds container 60—110 cakes, depending on the grind quantity (grounds ejection option)
Boiler Coffee: 0.9l; 2.5kW (at 230V); operating pressure 800kPa (8bar)
Hot water: 0.9l; 2.5kW (at 230V) operating pressure 800kPa (8bar)
Steam: 0.9l; 2.5kW (at 230V) operating pressure 100kPa (1bar)
Noise emission < 70dB
Weight Approx. 58kg without packaging; approx. 64kg with packaging
Water connection G 3/8" outside thread
Water pipeline pressure 0.8—8.0bar
Water shut-off With check valve and filter
Water hardness 4—8°dH (German total hardness)
7—14°fH (French total hardness)
70—140 ppm (mg/l)
Chlorine content <0.5mg/l
Acid content/ph value 6.5—7.5 pH
Funnel d = 50mm with siphon
Drain line dmin = 1"
Ambient conditions Humidity: max. 80%
Ambient temperature: 10—32° C
Energy loss/day
(incl. refrigeration unit SU12
FM)
3.165kW
Electrical connection
(see type plate)
CH/GB/EU 380—415 V/50 –60 Hz3L N PE6.3—7.5 kW
220—240 V/50 –60 Hz1L N PE2.6—3.0 kW
220—240 V/50 –60 Hz1L N PE4.4—5.0 kW
220 —240 V/50 –60 Hz3L PE5.6—7.9 kW
USA (UL) 220—240 V/60 Hz2L PE4.5—5.3 kW
JP 200—220 V / 50 –60 Hz2L PE4.5—6.3 kW
200—220 V / 50 –60 Hz3L PE6.8—8.1 kW
CN 380 V/50 Hz3L NPE6.3kW
Preparations
•The power connection for the coffee machine must be pro-
tected by a ground fault circuit interrupter (FI).
•Each terminal of the power supply must be able to be inter-
rupted by a switch.
•The fixed water connection must have a water shut-off with a
check valve and filter that can be inspected and must meet
the requirements of the technical data.
•The fixed water connection to your coffee machine must be
done using the hose set that is supplied with it. Do not use
any other water hoses that happen to be present.
Installation
You must have completed these preparations before one of our
Service technicians can install the coffee machine for you.
Your Service technician will install your coffee machine and
carry out the initial commissioning. The technician will walk you
through the basic functions.
Your A1000 must be properly installed so that you can operate it correctly – your service technician will gladly do that for you.
You'll have to take care of a few things first. You'll find the requirements for problem-free enjoyment of your coffee machine here.
INSTALLATION AND TECHNICAL DATA