695395
13
Verklein
Vergroot
Pagina terug
1/44
Pagina verder
Installation Instructions Installation Instructions
13
1 Dear user
Congratulations on purchasing your Faber product, a quality
product that will provide you with the warmth and atmosphere for
many years. Please read the user manual before using the re.
Should a malfunction occur despite the careful nal checks, then
you can always contact your Faber dealer.
Please note:
The data of your re is available in the user manual.
1.1 Introduction
Only have the appliance installed by a qualied installer according
to the gas safety regulations.
Read this installation manual properly.
1.2 Please check
Check the re for transport damage and report any damage
immediately to your dealer.
1.3 CE Declaration
Glen Dimplex Benelux certies that this Faber re complies with the
essential requirements of the gas appliances directive.
Product: gas room heater
Model: MatriX 800/500-I/IIL/IIR/III
MatriX 800/650-I/IIL/IIR/III
Applicable EC directives: 90/396/EEC
Harmonized standards applied: NEN EN 613:2000 and NEN EN
613/A1:2003
This declaration is invalid, if without the written permission of Glen
Dimplex Benelux:
Changes are made to the appliance.
The re is connected to other exhaust materials than
specied.
2 Safety instructions
The unit must be installed and subsequently serviced every
year and maintained in accordance with these instructions
and the applicable national and local regulations.
Ensure that the data on the type label matches the local gas
type and pressure.
The settings and the construction of the re must not be
changed!
Do not place extra imitation wood or other smoldering
material on the burner or in the combustion chamber.
The appliance is for atmosphere and heating purposes. This
means that all surfaces, including the glass, can be very hot
(over 100°C). Exceptions to this are the bottom of the re
and the control elements.
Do not place any combustible materials within 0,5m of the
radiation area of the re.
Through the natural air circulation of the re moisture and
uncured volatile components from paint, building materials
and carpeted oors, etc. are attracted. These parts can settle
as soot on cold surfaces. Therefore do not light the re
shortly after installation.
Light the re for the rst time and run for several hours on the
highest setting, so that the paint can cure. Provide adequate
ventilation, so that any fumes can disperse; we recommend
vacating the room during this process.
> Please note:
1. All transport packaging is removed.
2. No children and pets in the room present.
3 Installation requirements
3.1 Fire
This device can be built into an existing or new chimney.
For devices with exible gas pipes, the gas regulator block is
mounted on the right side of the re for transport reason (g
1.6). The gas regulator block with the receiver and the I.T.C.
must be placed on a distance of max. 30cm behind a service
door.
When desired, there are 2 metres burner pipes
(To prevent damage to cables and pipes during transport,
these are tied together with tie-wraps.
Remove it to ensure the proper functioning of the appliance).
3.2 False chimney breast or other structure
The false chimney should be of non-combustible material.
The space above the re should always be ventilated using
the supplied grids or a similar alternative with minimal free
passage of 200cm² per grid.
The false chimney breast and its construction may not rest on
the appliance.
It is not permitted to start directly on the device with
concentric cut down pipe material.
The air supply could then possibly be closed.
3.3 Flue pipe and terminal requirements
For the supply of the combustion air and the discharge of the
combustion gases you should always use the Flue materials
specied by Faber. Only when using these materials can
Faber guarantee the safe and proper operation of the
appliance.
The outside of the concentric ue material can heat up to
+/-150°C. Ensure, when penetrating a ammable wall or
ceiling, construction with proper insulation and protection.
And ensure respective distance.
Ensure for great discharge lengths that the concentric
discharge material is supported every 2m, so that the weight
of the material is not supported by the re.
It is not permitted to start directly on the device with
concentric cut down pipe material.
The air supply could then possibly be closed.
13

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Faber MATRIX 800-500 III bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Faber MATRIX 800-500 III in de taal/talen: Engels als bijlage per email.

De handleiding is 12,24 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Faber MATRIX 800-500 III

Faber MATRIX 800-500 III Installatiehandleiding - Nederlands - 48 pagina's

Faber MATRIX 800-500 III Installatiehandleiding - Deutsch - 52 pagina's

Faber MATRIX 800-500 III Installatiehandleiding - Français - 48 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info