Installation Instructions Installation Instructions
16
5.2 Removing the glass from the side
It is not necessary to take out the glass from the side to place the
log set or for maintenance.
MatriX 1050-II and -III:
First, remove the front glass (see Chapter 5.1).
Remove the left or right clamp strip on the top (g. 3.4).
Place the suction cups on the glass (g. 3.5).
See g. 3.5, number:
1. Slide the glass towards to you and to the top so the
bottom and back side will release.
2. Now, carefully get the underside towards to you and
put the glass on a safe place.
> Please note:
Replace the glass in reverse order.
Clean all ngerprints on the glass; otherwise they will burn in once
the re is used.
6 Placing the decoration material
It is not permitted to use other or to add more material in the
combustion chamber.
Keep the pilot light always free of decoration material!
See g. 4.0 to 4.5 or the included log set card:
Divide the glass granulate on the perforated bottom plate.
Place the 2 large wood blocks and make sure there is no
glass granulate underneath.
Place the other wood blocks.
Divide the chips on the glass granulate and the perforated
bottom plate.
Start the re as described in the user manual.
Assess whether the ame distribution and the Symbio-effect
is good. Move or remove any chips/glass granulate to a good
Symbio-effect.
Replace the glass (Chapter 5) and check the re image.
7 Checking the installation
7.1 Checking the main burner ignition, pilot ame
Ignite the re as described in the user manual.
Check that the pilot ame is well above the main burner and
not covered by chips.
Check the ignition of the main burner on full and small
setting. (Ignition must be smooth and quiet).
7.2 Checking for gas leaks
Check with a gas leak nder or spray all connections and pipes for
gas leakage.
7.3 Checking the burner pressure and primary
pressure
Check that the burner pressure and primary pressure match with
the information listed in the manual, Chapter 14 “Technical
specications”.
Measuring the primary pressure:
Close the shut-off valve.
Turn measuring nipple B (see g. 1.7) some turns open and
connect a measuring hose to the gas regulator.
Take this measurement at highest setting of the re and when
the re is set to pilot light.
Do not connect the unit if the pressure is too high.
Measuring the burner pressure:
Check the burner pressure only with proper primary pressure.
Turn measuring nipple A (see g. 1.7) some turns open and
connect a measuring hose to the gas regulator.
The pressure must correspond to the value indicated in the
technical specications of this manual. In case of deviation
contact the manufacturer.
> Please note:
Close all pressure measuring nipples and check for gas leakage.
7.4 Checking the ame image
Let the re burn for at least 20 minutes at highest setting and check
the ame for:
* Flame distribution
* Color of the ames
If one or both points are not acceptable then check:
The log set layout and/or the amount of glass granulate/chips
on the bottom plate.
The pipe connections for leaks (in case of blue ames).
Whether the correct ue restrictor is tted. (see g, 2.0 F, rst
remove hatch “G”).
The outlet.
- Wall terminal right side up
- Roof terminal on the right position
- If the maximum horizontal ue lengths is not exceeded.
7.5 Flue gas analyzer
If you are in possession of a CO/CO2 ue gas analyzer, then it is
possible to check the supply air and the combustion gases.
There are two measuring pipes at the front of the re between the
mounting frame and the glass (g. 2.1).
The ratio CO2 and CO must not be greater than 1:100.
Example:
CO2 is 4% and CO is 400ppm, measured at the highest point.
If the ratio is greater than 1:100 or exhaust gases are measured in
the supply air, then also check above points.
16

Hulp nodig? Stel uw vraag in het forum

Spelregels
1

Forum

Faber-MATRIX-1050-500-I

Zoeken resetten

  • Faber 1050/500
    Wie heeft ook last van binnenstromende koude lucht vanuit binnenzijde bovenrand van het stalen kader ?? Gesteld op 8-3-2022 om 23:41

    Reageer op deze vraag Misbruik melden

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Faber MATRIX 1050-500 I bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Faber MATRIX 1050-500 I in de taal/talen: Engels als bijlage per email.

De handleiding is 11,47 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Faber MATRIX 1050-500 I

Faber MATRIX 1050-500 I Installatiehandleiding - Nederlands - 48 pagina's

Faber MATRIX 1050-500 I Installatiehandleiding - Deutsch - 52 pagina's

Faber MATRIX 1050-500 I Installatiehandleiding - Français - 48 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info