With Lat Tower Cable (36) in groove of
Pulley(34).thread the Lat Tower Cable (36) through
Lat Tower Post Upper(15) bracket.
Attach the Pulley (34) and Pulley Covers (35) to Lat
Tower Post Upper (15) bracket using one Hex Bolt
(47), two Flat Washers (56) and one Nylon Lock Nut
(53).
Slide the Glide Carriage (17) onto the Lat Tower Post
Upper (15) as illustration.
Attach the Lat Tower Post Upper assembly to the Lat
Tower Post Lower (16) using two Hex Bolts (47) ,
two Flat Washers (56) and two Nylon Lock Nut
(53).
Attach Lat Tower Handle Bar (18) to one end of Lat
Tower Cable (36) using a Hook (44). Fix the other
end of Lat Tower Cable (26) to Glide Carriage (17)
with a Hex Bolt, two Flat Washers (56) and one
Nylon Lock Nut (53)
Put the Spring Collar (41) to the Glide Carriage (17)