•Make sure that the stove is transported in compliance with safety regulations.
Avoid any improper transfers or knocks that may damage the ceramics or the structure.
•The metal structure is coated using high temperature paints. When using the appliance for the first few times, unpleasant odours may be given off due to the
paint of the metal parts that is drying: this is in no way dangerous and in such case, simply ventilate the premises. After the first heating cycles, the paint will
reach its maximum adhesion and all its chemical and physical features.
•The reload the hopper, simply open the access lid and pour in the pellets, also during normal operation, making sure that no pellets fall out of it. Always refuel
the hopper before leaving the operating stove unattended for long periods of time.
•Whenever the hopper and the auger tube become completely empty, the appliance will be automatically switched off. It may take two separate ignitions to
resume operation at ideal working conditions as the auger tube is very long.
•ATTENTION! If the stove is not properly installed, power outages may result in fume spillages. Under specific circumstances, an uninterrupted
power supply unit must be installed.
•ATTENTION! Being a heating appliance, some parts of the stove can become extremely hot. We therefore recommend paying special attention
during operation.
WHEN THE STOVE IS WORKING:
odo not open the door;
odo not touch the door glass since it becomes extremely hot;
okeep children away from it;
odo not touch the fume outlet;
odo not pour any liquid inside the firebox;
odo not perform any maintenance operations if the stove is not cold;
oonly qualified technicians are allowed to perform any operation;
ofollow all the instructions contained herein.
INTRODUCTION
INSTALLATION WITH WALL FUME OUTLET IS PROHIBITED. INSTEAD THE FUME OUTLET MUST BE ROOF-TYPE AS PROVIDED FOR BY NATIONAL
REGULATIONS.
Eva Stampaggi S.r.l. declines any liability for any damage to persons or property arising from the failure to comply with the points mentioned above
and from non-compliant product installation.
Install the stove according to the regulations in force in the country of use.
For example, in Italy this refers to UNI 10683: 2012, which dictates 4 points
1. preliminary activities - for which the retailer/installer is responsible and liable for at the time of the inspection before definitive installation. The preliminary
activities include:
•installation site suitability verification;
•fume evacuation system suitability verification;
•external air inlet suitability verification;
At this stage, it is necessary to check that the product can be safely operated and that it satisfies the relevant technical characteristics.
The safety conditions must be ascertained by means of a prior inspection.
Stoves and fireplaces are heating systems and must be installed safely and comply with the manufacturer's instructions!
2. Installation - responsibility of the installer. At this phase, the aspects of installation of the product and of the fume evacuation system are taken into account
and the following issues are addressed:
•safety distance from combustible materials;
•chimney flue construction, smoke ducts, intubated systems and chimney cowls.
3. issuing of additional documents - responsibility of the installer.
Issuing of the technical documentation must include:
•manual of use and maintenance of the appliance and of the components of the system (e.g. smoke ducts, chimney flue, etc.);
•Photocopy or photograph of the chimney flue plate;
•system manual: (if applicable);
•Declaration of Conformity in relation to Ministerial Decree 37/08.
4. control and maintenance - responsibility of the maintenance technician who must oversee protection and maintenance of the product during its operation over
time. The operator in charge of control and maintenance of the systems for winter and summer climate control performs these activities to a professional standard
in accordance with the regulations in force. The operator, at the end of these operations, must draw up and sign a technical inspection report in accordance with
the models provided by the provisions of this decree and the implementing rules, in relation to the type and capacity of the system, to be issued to the person who
signs a copy thereby confirming receipt and reading thereof."
02. VENT PIPE
THE PRODUCTION OF THE STOVES IS REQUIRED WITH HIGHER PERFORMANCES, SO IT IS IMPORTANT TO PERFORM THE INSTALLATIONS
ACCORDING TO THE LAW. IF THE FLUE DUCT PASSES THROUGH NON-HEATED AREAS, IT MUST BE INSULATED FOR A PROPER COMBUSTION.
Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.
Product:
Spelregels forum
Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:
lees eerst de handleiding door;
controleer of uw vraag al eerder door iemand anders is gesteld;
probeer uw vraag zo duidelijk mogelijk te stellen;
heeft u een probleem en al geprobeerd om dit op te lossen, vermeld dit erbij aub;
heeft u een oplossing gekregen van een bezoeker dan horen wij dat graag in dit forum;
wilt u een reactie geven op een vraag of antwoord, gebruik dan niet dit formulier maar klik op de knop 'reageer op deze vraag';
uw vraag wordt direct op de website gezet; vermijd daarom persoonlijke gegevens in te vullen;
Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.
Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.
Abonneren
Abonneer u voor het ontvangen van emails voor uw Eva Calor Enrica bij:
nieuwe vragen en antwoorden
nieuwe handleidingen
U ontvangt een email met instructies om u voor één of beide opties in te schrijven.
Ontvang uw handleiding per email
Vul uw emailadres in en ontvang de handleiding van Eva Calor Enrica in de taal/talen: Engels als bijlage per email.
De handleiding is 5,83 mb groot.
U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.
Uw handleiding is per email verstuurd. Controleer uw email
Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.
Er is een email naar u verstuurd om uw inschrijving definitief te maken.
Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken
U heeft geen emailadres opgegeven
Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.
Uw vraag is op deze pagina toegevoegd
Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.