810882
50
Verklein
Vergroot
Pagina terug
1/158
Pagina verder
ENGLISH
49
Should ignition fail, DO NOT re-ignite until you have emptied the combustion chamber.
Regular maintenance is required for the thermo-stoves to function correctly.
The thermo-stoves will trigger the message: ‘smoke °C/high’ or ‘Mainten.’ to appear on the panel when further cleaning is
necessary.
FAILURE TO PERFORM at least SEASONAL MAINTENANCE can cause the thermo-stoves to malfunction and any pro-
blems deriving from this will not be covered by the warranty.
Non-compliance with maintenance procedures will render the warranty null and void.
Before performing any maintenance, disconnect the appliance from the mains.
Weekly cleaning (see illustration on next page)
Cleaning should be carried out with the aid of a vacuum cleaner (see optional page. 53).
Operation to be carried out when the stove is cold.
Never vacuum hot ashes, as this would damage your vacuum cleaner.
• Vacuum the door and if necessary clean the glass (cold).
• Open the small door and remove and empty the ash tray (Fig. A-1) vacuum the fire bed.
• Remove the front tile (Fig. B-2).
• Vacuum the crucible or scrape it with the spatula provided, clear any obstructions from the holes on all sides, after removing the
front plate (fig. C -3).
• Clean the spark plug
• Remove the inspection plugs on both sides of the hearth and vacuum the crucible (Fig. D-4).
• Move the cleaning rods (*) :
- For the Quebec/Toronto models, remove the ceramic top and make movements with the lever (see fig. E).
- For the Ottawa model, remove the metal top and make movements with the lever (see fig. F).
- For the Montreal/Miami models, open the top door and act on the lever (see fig. G).
• Following a period in which the stove has been inactive and in any case at least every month, empty the pellet storage tank and vacuum the bottom.
We remind you that using the stove without cleaning the melting pot, may cause a sudden ignition gas inside the combustion cham-
ber with the consequent breaking of the glass
NOTE: The DEALER, upon commissioning, sets the kg value of consumed pellets; after which, the message "SERVICE UTE" will
appear on the display. The thermo stove continues operation, but the end client is invited to perform careful maintenance, descri-
bed above and explained by the DEALER during commissioning, to the extent of his abilities. To eliminate the message from the
display, press the boiler button for at least 5 seconds after having completed maintenance.
Seasonal cleaning (implemented by the dealer)
The DEALER, upon commissioning, sets the kg value of consumed pellets; after which, the message "Mainten." will appear on the display.
The thermo stove continues operation, but the end client must contact the DEALER to perform necessary seasonal maintenance. The end client
is invited to perform seasonal maintenance regardless of which messages may appear on the display.
Before performing any maintenance, disconnect the appliance from the mains.
The Dealer will provide you, on the occasion of the first start up, with the stove maintenance book, where the steps for seaso-
nal cleaning, outlined here below, are listed.
Clean the thermo-stoves internally and externally
• Carefully clean the heat exchange tubes
• Carefully clean and remove dirt from the combustion chamber and the relative compartment
• Clean the motors, verify mechanical and clam loosening
• Clean smoke channel (replace seals on pipes) and smoke extraction fan chamber
• Check the expansion tank
• Check and clean the circulator
• Check the sensors
• Check and if necessary replace the clock battery on the control board
• Clean, inspect and scrape any residue from the ignition resistance compartment and if necessary, replace it
• Clean/check the Synoptic Panel
• Visually inspect the electrical wires, connections and power cable
• Clean the pellet hopper and check loosening of the feed screw - gear motor assembly
• Check and if necessary replace the door seal
• Functionality test: load the feed screw, ignite, let it run for 10 minutes and shutdown
If maintenance if not implemented, the warranty will be rendered null and void.
If the thermo-stoves is used very often, it is recommended to clean the smoke channel every 3 months.
When maintenance is implemented in the smoke channel, consider UNI 10847/2000 Individual chimney installations for generators
running on liquid and solid fuel. Maintenance and control.
The chimney stacks and smoke ducts to which solid fuel appliances are connected should be cleaned once a year (verify whe-
ther in there are regulations in force in your country regarding this)
In the even that regular checks and cleaning are not performed the probability of a chimney fire increases.
In the event of such an occurrence proceed as follows: do not extinguish with water; empty the pellet storage tank; contact the
Dealer before re-starting after such an incident.
MAINTENANCE
50

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Edilkamin ATLANTA bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Edilkamin ATLANTA in de taal/talen: Nederlands, Duits, Engels, Frans, Italiaans, Spaans als bijlage per email.

De handleiding is 4.03 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info