English LI 16I-TUR
7.5 Electrical connection
7.5.1 General
All electrical installation work must be carried out by a trained
electrician or a specialist for the specified tasks in accordance
with the
installation and operating instructions,
country-specific installation regulations (e.g. VDE 0100),
technical connection conditions of the energy suppliers
and supply grid operators (e.g. TAB) and
local conditions
To ensure that the frost protection function of the heat pump
works properly, the heat pump manager must remain con-
nected to the power supply and the flow must be maintained
through the heat pump at all times.
The switching contacts of the output relay are interference-
suppressed. Therefore, depending on the internal resistance of
the measuring instrument, a voltage can also be measured
when the contacts are open. However, this will be much lower
than the line voltage.
7.5.2 Electrical installation work
1) The 4-core electrical supply cable for the output section of
the heat pump is fed from the heat pump meter via the util-
ity company blocking contactor (if required) into the heat
pump.
The mains cable is connected at the heat pump switch box
using terminals X1: L1/L2/L3/PE
An all-pole disconnecting device with a contact gap of at
least 3 mm (e.g. utility company blocking contactor or
power contactor) and an all-pole circuit breaker with com-
mon tripping for all external conductors must be installed
in the power supply for the heat pump (tripping current and
characteristic in compliance with the device information).
2) The three-core supply cable for the heat pump manager
(heating controller N1) is fed into the heat pump.
Connection of the control cable to pin X1.1 “230 V-IN”
(white): L/PE/N.
Details on the power consumption of the heat pump are
listed on both the product information sheet and the type
plate.
The supply cable (L/N/PE~230 V, 50 Hz) for the heat pump
manager must have a continuous voltage. For this reason,
it should be tapped upstream from the utility company
blocking contactor or be connected to the household cur-
rent, because otherwise important protection functions
could be lost during a utility block.
3) The utility company blocking contactor (K22) with 3 main
contacts (1/3/5 // 2/4/6) and an auxiliary contact (NO
contact e.g. 13/14) should be dimensioned according to
the heat pump output and must be supplied on-site. The
NO contact of the
utility company blocking contactor (13/14) is connected to
pin (1) (=DI1) of function block 0 (grey). CAUTION! Extra-
low voltage!
4) The contactor (K20) for the immersion heater (E10) of
mono energy systems (HG 2) should be dimensioned ac-
cording to the radiator output and must be provided on-
site. The control (230 V AC) is performed from the heat
pump manager, with the function applied via pin (7) (=NO3)
of function block 0 (grey).
5) The contactor (K21) for the flange heater (E9) in the do-
mestic hot water cylinder should be dimensioned accord-
ing to the radiator output and must be provided on-site.
The control (230 V AC) is performed from the heat pump
manager via pin (7) of the defined function block.
6) The contactors mentioned above in points 3, 4 and 5 are
installed in the electrical distribution system. The mains ca-
bles for the radiators should be dimensioned and pro-
tected according to DIN VDE 0100.
7) The heat circulating pump (M13) is connected to pin (5)
(230V) and (8) (control signal) of function block 0 (grey).
8) The domestic hot water circulating pump (M18) is con-
nected to pin (5) of the defined function block.
9) The external sensor (R1) is connected to pin (3) (=U1) of
function block 0 (grey).
10) The domestic hot water sensor (R3) is installed in the do-
mestic hot water cylinder and is connected to pin (3) of the
defined function block
NOTE
ººººº
If three-phase pumps are implemented, a power contactor
can be controlled via the 230 V output signal of the heat pump
manager.
Sensor cables can be extended up to 40 m with 2 x 0.75 mm
cables.
NOTE
º
ºººº
Further information on the wiring of the heat pump manager
is available in the electrical documentation.
34

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Dimplex LI 16I-TUR bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Dimplex LI 16I-TUR in de taal/talen: Duits, Engels, Frans als bijlage per email.

De handleiding is 4.21 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info