695365
29
Verklein
Vergroot
Pagina terug
1/76
Pagina verder
English
INSTALLATION MANUAL
Ø
Remove the fire door and disassemble the frame when it is supplied separately (see section 9 'Appliance-specific
information').
Ø
Install the fire.
Ø
If applicable connect the outside air connection (see section 9 'Appliance-specific information').
Ø
If applicable connect the convection opening with the flexible aluminium pipe and ventilation elements.
Keeps these elements at least 30 cm away from the ceiling.
Ø
Use single-walled stainless steel flue pipes or stainless steel double-walled flexible pipes that at least meet the
requirements of standard EN 1856-2 T600.
Ø
The fire may never support the flue.
Ø
After the fire has been connected turn the adjustable legs with the Allen key supplied until the fire is in the
desired position. Make sure that the combustion air supply is not blocked when doing this.
Ø
Replace the restrictor cap for the outflow, fit the inner lining plates in reverse order and place the baffle plate
against the back wall and on the profiles (see section 9 'Appliance-specific information').
Ø
Use a torch or a thin screwdriver to check that the secondary ventilation holes in the back wall are directly facing
the recesses in the interior lining.
Ø
Replace the door and if applicable the frame around the fire (if applicable see section 9 'Appliance-specific
information').
Ø
Lay a fire-resistant floor plate for the fire if the floor is flammable. The floor plate of non-flammable
material must extend at least 300 mm away from the fire and be at least 300 mm wider than the fire.
Installing with build-in cassette (if applicable):
Ø
Place the fire with build-in cassette on a floor with a sufficient load bearing capacity.
Ø
Install the build-in cassette for a fire-safe wall.
Ø
If there is a flammable wall build a 10 cm-thick fire-safe wall.
Ø
Place the build-in cassette level at the desired height and fix it with metal anchors.
Ø
With a corner model fix the tie rod to the wall and adjust it.
Ø
Connect the flue duct to the cassette ring.
Ø
The cassette is not suitable for supporting a flue duct; this must be self-supporting.
Ø
Use non-combustible and heat-resistant material according to European fire classification A1 EN 13501-1 for the
chimney breast (including the upper face), the material in the chimney breast and the back wall against which the
appliance is fitted. Plate material or stony materials can be used for this.
Ø
If the chimney breast is made of heat-resistant plates according to European fire classification A1 EN 13501-1 such
as Promafour, Promatect, Nobranda etc., it can be fixed to the cassette.
Ø
Stony materials may not rest on the cassette; for this use a brick lintel with ceramic felt.
Ø
Leave a space of 6 mm between the cassette and the chimney breast walls.
Ø
Cover the cassette with 6 cm of heat-resistant insulation material.
Ø
Take account of the expansion of the cassette. Keep the cassette free of plasterwork.
Ø
The chimney breast may not be warmer than 90 degrees Celsius on the outside.
Ø
If there is a flammable ceiling, place a fire-resistant plate with a 10 cm thick heat-insulating layer on top 30 cm
below the ceiling in the chimney breast.
Ø
Place the fire before the build-in cassette.
Ø
Turn in the adjustable legs and check whether they are properly adjustable. There may still be some blasting grit
present.
Ø
Carefully slide the fire into the hole. Make sure that no damage is caused.
Ø
Turn the adjustable legs with the associated Allen key so the fire comes into the desired position. Make sure that
sufficient space remains under the fire for the supply of combustion air.
Ø
Make a good, airtight seal between the fire and the flue.
Ø
Leave a space of at least 10 mm between the fire and cassette.
Ø
If applicable fit the restrictor cap for the outflow, place the vermiculite plates in reverse order and place the baffle
plate against the back wall and on the profiles.
Ø
Fit the frame if it is supplied separately.
Ø
Lay a fire-resistant floor plate for the fire if the floor is flammable. The floor plate in non-flammable material must
extend at least 300 mm away from the fire and be at least 300 mm wider than the fire.
UK
29

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Dik Geurts Vidar Triple-wall bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Dik Geurts Vidar Triple-wall in de taal/talen: Nederlands, Duits, Engels, Frans als bijlage per email.

De handleiding is 2,05 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Andere handleiding(en) van Dik Geurts Vidar Triple-wall

Dik Geurts Vidar Triple-wall Gebruiksaanwijzing - Nederlands, Deutsch, English, Français - 64 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info