696355
3
Verklein
Vergroot
Pagina terug
1/38
Pagina verder
INSTALLER MANUAL
Pellet replace insert
EN
©2018 CADEL srl | All rights reserved - Tutti i diritti riservati
ZEFIRO
3
- ZEN AIRTIGHT
ZEFIRO
3
- ZEN AIRTIGHT
2
SUMMARY
1 MANUAL SIMBOLOGY .................................... 2
2 PACKAGING AND HANDLING ..........................2
2.1 PACKAGING .............................................................2
2.2 REMOVING THE STOVE FROM THE PALLET ..............2
2.3 STOVE HANDLING....................................................3
3 CHIMNEY FLUE ...........................................3
3.1 INTRODUCTION .......................................................3
3.2 CHIMNEY FLUE ........................................................3
3.3 TECHNICAL FEATURES ............................................. 4
3.4 HEIGHTDEPRESSION .............................................. 5
3.5 MAINTENANCE ........................................................5
3.6 CHIMNEY POT ..........................................................5
3.7 CHIMNEY COMPONENTS .........................................6
3.8 CHIMNEY FLUE CONNECTION ..................................6
3.9 EXAMPLES OF CORRECT INSTALLATION ..................7
4 COMBUSTION AIR .........................................9
4.1 EXTERNAL AIR INLET ...............................................9
4.2 COMBUSTIBLE AIR INLET FOR SEALEDCHAMBER
INSTALLATION .................................................................10
4.3 COMBUSTIBLE AIR INLET FOR SEALEDCHAMBER
INSTALLATION .................................................................10
5 INSTALLATION ............................................11
5.1 INTRODUCTION .....................................................11
5.2 OVERALL DIMENSIONS .........................................11
5.3 GENERAL INSTALLATION .......................................12
5.4 INSERT EXTRACTION .............................................13
5.5 INSERT REMOVAL .................................................. 14
5.6 INSTALLATION WITH EXTERNAL COVER ................15
5.7 INSTALLATION ON EXISTING FIREPLACE ...............16
5.8 DOOR ADJUSTMENT ..............................................17
5.9 ELECTRIC CONNECTION .........................................18
5.10 CONNECTION TO THE EXTERNAL THERMOSTAT .....18
5.11 AIR REGULATOR ....................................................19
5.12 INSERT LEGS INSTALLATION OPTIONAL .............19
5.13 HOT AIR DUCTING OPTIONAL .............................20
5.14 PELLET DRAWER INSTALLATION OPTIONAL ....... 23
5.15 TRAPDOOR INSTALLATION OPTIONAL ................25
5.16 FRAME INSTALLATION OPTIONAL ......................26
5.17 CONCENTRIC PIPE INSTALLATION OPTIONAL .....27
5.18 DISPLAY ROTATION ...............................................27
6 WIFI KIT INSTALLATION .............................28
7 SPECIAL MAINTENANCE ..............................29
7.1 INTRODUCTION .....................................................29
7.2 FEED SCREW MAINTENANCE.................................30
7.3 FLUE GAS EXTRACTOR CLEANING..........................30
7.4 FUME PIPES ANNUAL CLEANING ......................... 31
7.5 GASKET REPLACEMENT ......................................... 32
7.6 GLASS REPLACEMENT ...........................................32
8 IN CASE OF ANOMALY ..................................32
8.1 PROBLEM SOLVING ...............................................32
9 TECHNICAL DATAS ......................................36
9.1 FUSE REPLACEMENT .............................................36
9.2 FEATURES .............................................................. 37
3
ZEFIRO
3
- ZEN AIRTIGHT
1 MANUAL SIMBOLOGY
USER
AUTHORISED TECHNICIAN
(ONLY to interpret or the Stove-manufacturer or the Authorized Techni-
cian of Technical Assistance Service approved by the Stove-manufacturer)
SPECIALIZED STOVE-REPAIRER
CAUTION:
READ CAREFULLY THE NOTE
CAUTION:
DANGER OR IRREVERSIBLE DAMAGE POSSIBILITY
The icons with the stylized figures indicates whom the subject dealt in the paragraph is addressed to (between the User and/
or the Authorized Technician and/or the Specialized Stove-repairer).
WARNING symbols indicates an important note.
2 PACKAGING AND HANDLING
2.1 PACKAGING
The packaging is made up of recyclable cardboard boxes according to RESY standards, recyclable expanded polystyrene inserts
and wooden pallets.
All packaging materials can be re-used for a similar use or eventually discharged as waste assimilable to the municipal solid
ones, in accordance with current regulations.
After having removed the packaging please assure you about the integrity of the product.
2.2 REMOVING THE STOVE FROM THE PALLET
Proceed as follows to remove the stove from the pallet:
Fig. 1 - Screw removal
ZEFIRO
3
- ZEN AIRTIGHT
4
Slightly pull out the machine body from the structure (see INSERT EXTRACTION a pag. 14)
Remove the screws fixed to the base of the insert (see Fig. 1) and then remove it from the pallet.
2.3 STOVE HANDLING
Both whether the stove is packed or not it is necessary to observe the following instructions for handling and transporting the
stove from its sale point to its installation point and for any future movements:
The stove must be handled with idoneous means paying attention to the existing safety regulations;
do not turn the stove upside down and/or upset it on one side, but keep it in vertical position or as accorded with the construc-
tor instructions;
if the stove is made up of ceramic, stone, glass or any particularly fragile material components, all must be moved with the
utmost care.
3 CHIMNEY FLUE
3.1 INTRODUCTION
This chapter about the Chimney Flue has been drawn up in cooperation with Assocosma (www.assocosma.org) and is based on
European Standards (EN 15287 - EN 13384 - EN 1856 - EN 1443) and UNI 10683:2012.
It provides instructions for a good and correct execution of the chimney flue but it does not absolutely replace the current stan-
dards which the qualified manufacturer/installer should comply with.
3.2 CHIMNEY FLUE
Fig. 2 - Chimney Flues
LEGEND Fig. 2
1 Chimney flue with insulated stainless-steel pipes
2 Chimney flue on the existing chimney
3 Inspection plug
4 Inspection door
5 ≥ 3,5 mt
The chimney flue or chimney is of great importance for the correct running of the heating appliance.
It is fundamental that the chimney flue is perfectly built and always maintained with a perfect efficiency.
The chimney flue must be sole (see Fig. 2) with insulated stainless-steel pipes (1) or installed on the existing chimney flue (2).
5
ZEFIRO
3
- ZEN AIRTIGHT
Both this solutions must be endowed with an inspection plug (3) and/or an inspection door (4).
3.3 TECHNICAL FEATURES
Fig. 3 - Inclined roof
LEGEND Fig. 3
1 Height over the ridge of the roof = 0,5 mt
2 Roof inclination ≥ 10°
3 90°
4 Measured distance at 90° from the roof surface = 1,3 mt
The chimney flue must be sealed from fumes.
It must have a vertical run without narrowing. It must be realized with fume and condensation resistant materials with ther-
mal insulation and able to last against usual mechanical stresses.
It must be insulated to avoid condensation and to reduce fume cooling effects.
The stove must be spaced out from fuels or flammable materials with an air gap or with insulating materials. Check the distan-
ce with the chimney manufacturer.
The chimney entrance must be placed in the same room where the appliance is installed or otherwise in the adjacent room
and it must be provided with a solid and condensation collection chamber under the entrance, accessible through the sealed
metal gate.
Auxiliary exhaust fans cannot be installed neither along the chimney nor on the chimney pot.
The inner section of the chimney flue can be round (the best one) or square and the jointed sides must have a minimum radius
of 20 mm.
The section dimension must be:
minimun Ø100 mm
recommended max Ø180 mm
Made the efficiency of the chimney flue overhauled by an expert stove-repairer and if necessary cover the chimney flue with
materials in compliance with current regulations.
The flue system must be placed on the roof.
The chimney flue must be provided CE in accordance with EN 1443 regulation. Please find attached an example of label:
ZEFIRO
3
- ZEN AIRTIGHT
6
Fig. 4 - Example of label
3.4 HEIGHTDEPRESSION
The depression (draught) of a chimney flue depends also on its height. Check the depression with the values provided at FEATU-
RES a pag. 37. Minimum height 3,5 meters.
3.5 MAINTENANCE
The fumes extraction pipes (fumes conduit + chimney flue + chimney pot) must always be cleaned, scrubbed and checked
by an expert stove-repairer, in compliance with current regulations, with the instructions of the stove-manufacturer and the
directives of your insurance company.
In case of doubts, please follow the most restrictive regulations.
Have your chimney flue and chimney pot checked and cleaned by an expert chimney sweep at least once a week. The chimney
sweep has to release a written declaration about the security of the system.
Not cleaning compromise safety.
3.6 CHIMNEY POT
Fig. 5 - Anti-wind chimney pots
The chimney pot is important for the correct running of the heating appliance:
We recommend using an anti-wind chimney pot, see Fig. 5.
The hole width for fumes exhaust must be the double of the chimney flue width and fitted in a way that the fume exhaust is
assured also in case of wind.
It should prevent the infiltration of rain, snow and animals.
The outlet height in the atmosphere must be away from the reflux area caused by the roof structure or by obstacles laying
nearby (see Fig. 3).
7
ZEFIRO
3
- ZEN AIRTIGHT
3.7 CHIMNEY COMPONENTS
Fig. 6 - Chimney components
LEGEND Fig. 6
1 Chimney pot
2 Fume outlet
3 Chimney flue
4 Termal insulation
5 External wall
6 Chimney union
7 Fume pipe
8 Heat generator
9 Inspection door
10 T-union with inspection plug
3.8 CHIMNEY FLUE CONNECTION
Your pellet stove works through a fume draught forced by a fan. It is obligatory to check that all pipes are realized in compliance
with the following regulation on material selection: EN 1856-1, EN 1856-2 e UNI/TS 11278. All must be effected by specialized
personnel or companies as provided by UNI 10683:2012.
The connection between the appliance and the chimney flue should be short in order to favor the draught and to avoid con-
densation in the pipes.
The fume conduit should be equivalent or longer than the outlet joint ones (Ø 80 mm).
Some stove models are endowed with a lateral and/or back exhaust. Check that the unused exhaust is sealed with the plug
given with standard equipment.
SYSTEM TYPE Ø80 mm PIPE Ø100 mm PIPE
Minimum vertical length 1,5 mt 2 mt
Maximum length (with 1 union) 6,5 mt 10 mt
ZEFIRO
3
- ZEN AIRTIGHT
8
SYSTEM TYPE Ø80 mm PIPE Ø100 mm PIPE
Maximum length (with 3 unions) 4,5 mt 8 mt
Maximum number of unions 3 3
Level section (minimum inclination 3%) 2 mt 2 mt
Installation at a height above 1200 m a.s.l. NO Obligatory
Use a plate pipe for stoves of Ø80 mm or Ø100 mm depending on the type of system and with silicone gaskets.
It is forbidden to use metal, fibre cement or aluminium flexible pipes.
For change of direction it is obligatory always to use a union (with angle > 90°) with inspection plug which enables an easy
periodic cleaning of the pipes.
Please assure you that after the cleaning the inspection plugs are sealed with its efficient gasket.
It is forbidden to exhaust flue gases directly from the wall towards the outside and closed spaces also at open top.
The fume conduit must be placed at a distance of minimum 500 mm from flammable or heat-susceptible components.
It is prohibited to connect more than one wood/pellet (*) or any other type of appliance (vent cowling...) to the same flue.
(*) unless there are national derogations (for instance in Germany), which under suitable conditions allow for the installation of
several appliances in the same fireplace. In any case, strictly follow the product/installation requirements of the relative regulations/
legislation in force in that country.
3.9 EXAMPLES OF CORRECT INSTALLATION
Fig. 7 - Example 1
LEGEND Fig. 7
1 Insulating material
2 Reduction from Ø100 to Ø80 mm
3 Inspection plug
4 Minimum safety distance = 0,5 mt
Chimney flue installation Ø100/120 mm with an enlarged drilling for pipe transit.
9
ZEFIRO
3
- ZEN AIRTIGHT
Fig. 8 - Example 2
LEGEND Fig. 8
1 Insulating material
2 Inspection plug
3 Chimney inspection entrance
4 Minimum safety distance = 0,5 mt
5 Inclination ≥ 3°
6 Level section ≤ 1 mt
Old chimney flue with an inserted pipe of minimum Ø100/120 mm and with an external door which enables the chimney
cleaning.
Fig. 9 - Example 3
LEGEND Fig. 9
1 Insulating material
2 Inspection plug
3 Minimum safety distance = 0,5 mt
External chimney flue entirely made up of insulated stainless steel pipes, i.e. with double wall of minimum Ø100/120 mm: all
must be firmly attached to the wall. For chimney against wind effects please (see Fig. 5).
Ducting system through T-unions which enables an easy cleaning without disassembling the pipes.
ZEFIRO
3
- ZEN AIRTIGHT
10
We recommend to check with your chimney flue manufacturer the safety distances which must be respected
and the type of insulating material. The aforesaid regulations are valid also for holes made on the wall (EN
13501 - EN 13063 - EN 1856 - EN 1806 - EN 15827).
4 COMBUSTION AIR
4.1 EXTERNAL AIR INLET
Fig. 10 - Direct air inow
LEGEND Fig. 10
1 Room to ventilate
2 External air inlet
The room must be endowed with an external air recycling for a good climate in your ambient.
The air inflow from outside to the inner occurs directly, through an opening on the external wall of the room (see Fig. 10).
Bedrooms, garages, and store of flammable materials are excluded.
The air inlet should have a total net surface of 80 sqcm
2
: the aforesaid surface is to widen if inside the room there are other
activated appliances (for example: electric ventilators for foul air suction, cooker hoods, other stoves, etc...) which depress the
environment.
At switched on appliance it is necessary to check that the pressure fall between the room and the outside does not exceed 4,0
Pa value: if necessary widen the air inlet (EN 13384).
The air inlet must be realized at a height close to the floor with an external grid against birds. In such a way it cannot be ob-
structed by any object.
In case of installation with sealed-chamber the air inlet is not necessary.
11
ZEFIRO
3
- ZEN AIRTIGHT
4.2 COMBUSTIBLE AIR INLET FOR SEALEDCHAMBER INSTALLATION
Fig. 11 - Air inlet for sealed-chamber installation
LEGEND Fig. 11
1 ≥ 1,5 mt
2 ≥ 0,3 mt
3-3 Sectional view
4 Shield grid
5 Curve inlet to turn downwards
Check if the purchased stove has a sealed-chamber. If the stove is endowed with a sealed-chamber and you want also the whole
installation with sealed chamber, please read the following instructions:
It is necessary to extract the air for combustion directly from outside.
Use a tube with minimum Ø60 mm and maximum 2 meters lenght; to connect see the back of the stove.
French standards require installation in double-walled flues (concentric system). The combustion air is drawn from the cavity.
During installation step is necessary to verify the minimum distances required for the combustible air inlet as (for example) an
open door or window causes a vortex which could remove the combustible air necessary to the stove (see the underlying scheme).
On the external wall it is necessary to install a curve at 90° to protect the combustible air inflow from wind effects: turn the
curve inlet downwards, see Fig. 11.
Endow the curve with an external shield grid against birds in such a way that it cannot be obstructed by any object.
Check with your local authorities if exists any restrictive regulation regarding the combustible air inlet: if pre-
sent, they must be applied
In some countries and/or regions the installation with sealed-chamber is obligatory: in case of doubt, please
follow the most restrictive regulations.
4.3 COMBUSTIBLE AIR INLET FOR SEALEDCHAMBER INSTALLATION
How to connect to the stove in the sealed chamber with concentric system:
ZEFIRO
3
- ZEN AIRTIGHT
12
Fig. 12 - Phase1 Fig. 13 - Phase 2 Fig. 14 - Phase 3
Remove the ring inside the combustion air fitting (see Fig. 12 and Fig. 13).
Insert the concentric pipe as in Fig. 14.
5 INSTALLATION
5.1 INTRODUCTION
The assembly position must be chosen depending on environment, outlet, chimney flue.
Check with local authorities if there are any restrictive regulations which regard the combustible air inlet, room ventilation,
fume exhaust system together with chimney flue and chimney pot.
Check if there is the combustible air inlet.
Check the probable presence of other stoves or appliances which could depress the room.
Check at switched on stove if there is the presence of CO in the room.
Check if the chimney has the necessary draught.
Check if during the fume passage all has been executed in safety (probable fume losses and distances from flammable mate-
rials, etc.…).
The installation of the appliance must enable an easy access for appliance, fume exhaust pipes and chimney flue cleaning.
The installation must enable en easy access to the electric connection plug (see ELECTRIC CONNECTION a pag. 19).
To install more appliances, the external air inlet must be correctly dimensioned (see FEATURES a pag. 37).
5.2 OVERALL DIMENSIONS
Fig. 15 - General dimensions: Zero
3
, Zen Airtight
LEGEND Fig. 15
1 69,7 cm
2 49 cm
13
ZEFIRO
3
- ZEN AIRTIGHT
LEGEND Fig. 15
3 55 cm
4 6,2 cm
5 17,7 cm
6 6,1 cm
7 49,4 cm
8 25,8 cm
9 14,5 cm
10 Exhaust fumes d.8 cm
11 Hole combustion air inlet d.6 cm
12 Hot air outlet 18x3 cm
13 Ducting outlet d.8 cm (optional)
14 37,7 cm
15 27,2 cm
16 7,5 cm
17 54÷72 cm
5.3 GENERAL INSTALLATION
Fig. 16 - General installation
LEGEND Fig. 16
1 Fireplace insert
2 Minimum lateral distance = 240 mm
3 Minimum rear distance = 190 mm
4 Minimum front distance = 1000 mm
5 Minimum thickness of insulating material = 40 mm
Please check that the floor has an adequate load capacity. If the existing one does not satisfy this requirement, appropriate
measure should be provided (for example a plate for distributing the load).
It is obligatory to install the stove away from walls and/or pieces of furniture, with a minimum air flow of 240 mm on the sides
and 190 mm on the back, to enable an eficient appliance cooling and a good distribution of heat in the room (see Fig. 16).
For safety fire regulations the distances from flammable or sensible to heat objects (sofas, pieces of furniture, wooden cove-
ring, etc...) must be respected, has described in Fig. 16.
The probable insulating material to use must have the following technical features:
DESCRIPTION VALUE
Material thickness 40 mm
ZEFIRO
3
- ZEN AIRTIGHT
14
DESCRIPTION VALUE
Screening temperature 1000 °C
Density 245 Kg/m3
Shrinkage at referring temperature (12h) 1,3 % /1000 °C
Cold crushing strenght 1,4 MPa
Bending strenght 0,5 MPa
Thermal expansion coefficient 5,4x10-6 m/mK
Specific heat 1,03 Kj/kgK
Thermal conductivity at medium temperature
200 °C 0,07 W/mK
400 °C 0,10 W/mK
600 °C 0,14 W/mK
800 °C 0,17 W/mK
If there are highly flammable objects (curtains, fitted carpet, etc...), all these distances must be further increased with 1 meter.
If the floor is made up of flammable material two solutions are possible:
build a protection (steel plate, refractory, marble...) made up of no flammable material;
otherwise the insert must be raised at a minimum height of 200mm from the floor (adjusting legs' lenght).
If the walls are made up of flammable materials, check the safety distances (see Fig. 16).
At maximum power check that the wall temperature does not ever exceed 80°C. If it would be necessary please install a fire
resistant plate on the concerned walls.
In some countries also masonring load-bearing walls are considered flammable.
5.4 INSERT EXTRACTION
The insert is composed of:
Fig. 17 - Structure + machine body
Key Fig. 17
1 Structure
2 Machine body
Proceed as follows to extract the insert:
Open the door.
15
ZEFIRO
3
- ZEN AIRTIGHT
Lift the hook (vedi Fig. 18) and pull the machine body firmly towards you (see Fig. 19).
Once the machine body has been extracted, you can access the pellet tank.
Fig. 18 - Lift hook Fig. 19 - Machine body extraction
5.5 INSERT REMOVAL
If the insert is inserted on the guides, there is a danger of tipping over!
Assembly operations must always be carried out by 2 people!
Pull out the machine body from the structure (see INSERT EXTRACTION a pag. 14).
Loosen the 2 hex screws on both sides of the insert (see Fig. 20).
Lift the safety plate locking the guide open (see Fig. 21).
Fig. 20 - Loosen screws Fig. 21 - Lift locking plate
Using the supplied handles (see Fig. 22) place them in the appropriate seats (see Fig. 23) and remove the machine body from
the guides.
To reassemble it proceed in reverse order.
ZEFIRO
3
- ZEN AIRTIGHT
16
Fig. 22 - Handle Fig. 23 - Machine body removal
5.6 INSTALLATION WITH EXTERNAL COVER
It is possible to cover the insert with your liking cover respecting the correct execution as described in GENERAL INSTALLA-
TION a pag. 13 and following the under mentioned instructions.
Fix the legs (optional) to the floor and lift the insert frame till the desired height by adjusting the legs and then block it with
screws on the fitting guides.
It is obligatory to fix the supporting frame legs at the base with metal plugs able to bear a weight of 50 kg for leg.
In case of insert extraction fixed on guides there is the risk of overturning!
Check if the insert frame is fixed to the floor.
Fig. 24 - Installation with cover
LEGEND Fig. 24
1 Ceiling to protect
17
ZEFIRO
3
- ZEN AIRTIGHT
LEGEND Fig. 24
2 Ceiling plaster to protect from heat
3 Ventilation grid with a minimum entrance of 400 cm
2
for natural hot convective air outlet
4 Self-supporting metal frame
5 Combustible air outlet
6 Pellet load entrance
7 Lower air grid with a minimum entrance of 400 cm
2
for natural cool convective air inlet
8 Floor protecting plate
9 Outlet clutch Ø80 mm
10 Fume pipe Ø80 mm with a minimum vertical lenght of 1 mt
11 Chimney flue of minimum Ø120 mm
12 Sealed chimney flue's inspection door
13 Wall
14 Floor
15 Ceiling with wooden beam
16 Fireplace insert
17 Insulating between wall and fume pipe of minimum 200 mm on the whole diameter
18 Combustible air inlet
19 Minimum distance between the wooden beams and the fume pipe = 0,5 mt
Build a metal frame for supporting cover panels (4).
Do not discharge the metal structure weight on the insert frame.
Cover the metal frame with panels made up of no flammable materials.
Made a cleft of min. 400 cm
2
on the lower (7) and upper (3) parts of the panels for the inner air recycling.
The pellet loading can occur by extracting the insert at switched off appliance, otherwise through the installation of a loading
trap door (6).
The loading trap door can be frontally or laterally installed, extending the flexible pipe Ø160 mm according to your needs.
5.7 INSTALLATION ON EXISTING FIREPLACE
It is possible to build the insert into an existing fireplace respecting the distances and the correct execution as described by
GENERAL INSTALLATION a pag. 13 and following the below mentioned instructions.
Fix the legs (optional) at the lowest height and block them with screws on its fitting guides.
It is obligatory to fix the leg of the supporting frame at the base with metal plugs able to bear a weight of 50 kg for leg.
In case of fixed on guides insert extraction there is the risk of overturning!
Check if the insert frame is correctly fixed to the base.
Check if the upper hot air outlet is not choked, see Fig. 25.
Make a cleft of 400 cm
2
on the lower and upper part of the fireplace for the inner air recycling.
The pellet loading can occur by extracting the insert at switched off appliance, otherwise through the installation of a loading
trap door (6).
The loading trap door can be frontally or laterally installed, extending the flexible pipe Ø160 mm according to your needs.
ZEFIRO
3
- ZEN AIRTIGHT
18
Fig. 25 - Installation on the existing replace
LEGEND Fig. 25
1 Ceiling to protect
2 Ceiling plaster to protect from heat
3 Ventilation upper grid minimum entrance 400 cm
2
for natural hot convective air outlet
4 Hot air deflector
5 Combustible air inlet
6 Fireplace's fire plate
7 Lower air grid with minimum entrance 400 cm
2
for natural cool convective air inlet
8 Ventilation cleft of 400 cm2 for convective cool air recycling
9 Outlet clutch Ø80 mm
10 Fume pipe Ø80 mm with minimum vertical lenght of 1 mt
11 Chimney flue > Ø120 mm
12 Fume pipe Ø100 mm
13 Wall
14 Floor
15 Ceiling with wooden beams with a minimum distance from the fume pipe = 0,5 mt
16 Fire place insert
17 Pellet loading entrance
18 Locking ring
5.8 DOOR ADJUSTMENT
To centre the door, proceed as follows:
19
ZEFIRO
3
- ZEN AIRTIGHT
Fig. 26 - Door adjustment
Open the door.
Loosen the two front screws in the upper hinge and, using the side screw (the one circled in the picture) adjust the door
forward or backward (see Fig. 26).
Once the door is centred, lock the 2 front screws.
5.9 ELECTRIC CONNECTION
Warning: the appliance must be installed by an authorized technician!
The electric connection occurs through a cable with plug put in an electric socket which is able to support charge and tension
specific of every model, as described in the technical datas table (see FEATURES a pag. 37).
The plug must be easily accessible when the appliance is installed.
Please further assure you that your network is endowed with an efficient earth connection: if it does not exist or if it is not
efficient, please endow you with one in compliance with the law.
Connect the supply cable first on the back of the stove (see Fig. 27) and then at a wall electric socket.
Fig. 27 - Electric socket with master switch
The master switch O/I (see Fig. 27) is to open only to switch the stove on, otherwise it is advisable to keep it off.
Do not use extension cables.
If the feeder cable is damaged, it must be replaced by an authorized technician.
When the stove is not going to be used for a long period of time, it advisable to remove the plug from the socket on the wall.
5.10 CONNECTION TO THE EXTERNAL THERMOSTAT
The stove is already working by means of a thermostat probe positioned inside it.
We strongly recommend connecting the insert to an external thermostat, as the room probe may not work properly in the presen-
ce of high temperatures (given the close distance to the combustion chamber).
This operation must be performed by an authorised technician.
Connect the wires from the external thermostat to the "Term opt" terminal on the stove board. Activate the external thermostat
ZEFIRO
3
- ZEN AIRTIGHT
20
(default setting OFF) as indicated below:
Press the "menu" button.
Scroll with the arrows to "Settings".
Select by pressing "menu".
Scroll with the arrows again to "Ext.Thermostat".
Select by pressing "menu".
Press the - + buttons.
To activate the external thermostat select "on".
Press the "menu" button to confirm.
5.11 AIR REGULATOR
The stove is fitted with a removable rear air regulator
The stove is regulated according to the flue data and pellet used, as per the technical features (see FEATURES a pag. 37)
If the data does not match, the authorised technician can increase the stove draft by removing/loosening the ring located inside
the air inlet pipe (see Fig. 28 and Fig. 29).
Fig. 28 - Ring removal 1 Fig. 29 - Ring removal 2
Air regulator opening 35 mm for nominal power with flue 11 Pa.
5.12 INSERT LEGS INSTALLATION OPTIONAL
It is possible to install the insert on a support structure with height-adjustable legs.
To assemble the legs, proceed as follows:
Fix the leg reinforcement with the extension using the screws (see Fig. 30).
Compose the 4 legs and fix them with the screws (see Fig. 31).
Fix the insert support surface above the legs (see Fig. 32).
Fig. 30 - Assemble reinforcement + extension Fig. 31 - Assemble legs Fig. 32 - Assemble legs + surface
Fix the 2 reinforcement crosspieces of the structure (see Fig. 33).
Also fix the reinforcements + the extensions assembled previously (see Fig. 34).
21
ZEFIRO
3
- ZEN AIRTIGHT
Place the insert above the structure, fixing it with the screws in the appropriate seats (see Fig. 35).
Fig. 33 - Assemble reinforcements Fig. 34 - Assemble reinforcements + extensions
to the structure
Fig. 35 - Fix insert above
Position the structure with the insert as desired and fix the legs to the floor and the extensions to the wall behind (see Fig. 36).
Fig. 36 - Fix the structure to the oor and wall
5.13 HOT AIR DUCTING OPTIONAL
WITH THE INSTALLATION OF THE DUCTING, IT IS NECESSARY TO LOAD THE NEW DATABASE IN THE BOARD (DA-
TABASE NO.02).
SEE “SERVICE MANUAL.
By default, the insert inserts the hot air into the environment from both the front vents.
It is possible to channel the left air on the back of the stove, through a ducting kit.
To assemble the kit, proceed as follows:
Extract the machine body.
Remove the 4 fixing screws of the left fan (see Fig. 37).
Use a clamp to break the corner of the casing (see Fig. 38) and bend the flap inwards with your hands (see Fig. 39).
ZEFIRO
3
- ZEN AIRTIGHT
22
Fig. 37 - Remove the fan Fig. 38 - Break the corner Fig. 39 - Fold the ap
Place the fan and casing on a surface (see Fig. 40).
Loosen the 4 screws (see Fig. 41) and rotate the casing and retighten the screws in the new position. Pay attention to the
position of the holes (see Fig. 42).
Fig. 40 - Fan + casing Fig. 41 - Remove the screws Fig. 42 - Rotate the fan
Insert the air diverter temporarily as shown in the picture Fig. 43.
Fit the new fan + casing in the new position and secure the screws (see Fig. 44).
Then align the diverter with the holes in the boiler. Attention: the air diverter must protrude about 16 mm above the machine
body (see Fig. 45).
Fig. 43 - Position the air diverter Fig. 44 - Secure the fan Fig. 45 - Projection of the air diverter
Seal the joint between the fan and the diverter with adhesive aluminium tape (see Fig. 46).
23
ZEFIRO
3
- ZEN AIRTIGHT
Mount the fitting on the air diverter for the air to be ducted (see Fig. 47).
Connect the ducting pipe d.80 and block the pipe with the clamp. Attention: use at least 20 cm of flexible pipe above the fitting
since the cover of the insert moves during manoeuvres (see Fig. 48).
Fig. 46 - Seal with adhesive aluminium tape Fig. 47 - Secure the tting Fig. 48 - Flexible pipe connection (rear view of
the insert)
Fig. 49 - Example of ducting
A stove with no ducting has a variable air flow rate from a minimum of 61 m
3
/h to a maximum of 130 m
3
/h, and an air tempe-
rature which varies from a minimum of 90°C to a maximum of 136°C.
In the case of ducting, it is recommended not to exceed 6 metres of pipe and 3 x 90° bends, otherwise the hot air loses its
effectiveness.
Use pipes with an 80 mm diameter with smooth internal walls.
If the pipes pass through cold walls, insulate the pipe with insulating material.
Place a protective grille with large mesh and a total minimum net surface area of 40 cm
2
over the outlet.
After the 6 metres of pipe there can be a variable air flow rate from a minimum of 58 m
3
/h to a maximum of 83 m
3
/h, and an air
temperature which varies from a minimum of 65°C to a maximum of 99°C. (These values have been recorded in the laboratory,
there may be differences in both flow rate and temperature in the installation room).
If you wish to increase the air flow, install a small wall-mounted fan on the outlet with a flow rate of more than 130 m
3
/h, this
should be performed by an authorised technician.
With factory parameters 1/2 of the heat produced by the stove is conveyed into the room where it is installed, the remaining
1/2 comes out from the ducting on the left.
ZEFIRO
3
- ZEN AIRTIGHT
24
To get the best performance you need to balance the power with the air flow. This operation must be performed with the
assistance of an authorised technician.
The ductable fans cannot be deactivated, but they can be operated at a power value between 1 and 5 or in automatic mode.
5.14 PELLET DRAWER INSTALLATION OPTIONAL
The insert is designed for loading the pellet through a drawer.
Proceed as follows to assemble:
Fig. 50 - Upper prole removal Fig. 51 - Gasket removal Fig. 52 - Gasket positioning
Remove the insert from the machine body.
Remove the upper profile above the door (see Fig. 50).
In the structure, remove the silicone gasket under the cover (see Fig. 51) and place it under the pellet loading drawer (see Fig.
52).
Fig. 53 - Drawer positioning Fig. 54 - Drawer front xing Fig. 55 - Drawer central xing
Position the drawer above the machine body (see Fig. 53) and fix the front part first (see Fig. 54) then the central part (see
Fig. 55).
25
ZEFIRO
3
- ZEN AIRTIGHT
Fig. 56 - Adjustment for centring
If necessary, remove the drawer and adjust, using the 2 wheels on the guides, its centring (see Fig. 56).
INSERT WITH DRAWER WITHOUT DUCTING
Fig. 57 - Remove the cover Fig. 58 - Insert insertion
Completely remove the cover from the structure (see Fig. 57).
Position the machine body with the pellet drawer in the structure (see Fig. 58).
INSERT WITH DRAWER AND WITH DUCTING
Fig. 59 - Cover cut Fig. 60 - Insert insertion
Following the precuts, cut the indicated part using an angle grinder/hacksaw (see Fig. 59) and then remove it.
Position the machine body with the pellet drawer in the structure (see Fig. 60) and proceed with the connection of the air
ZEFIRO
3
- ZEN AIRTIGHT
26
ducting pipe (see dedicated chapter).
5.15 TRAPDOOR INSTALLATION OPTIONAL
The insert is designed for loading the pellet through a trapdoor.
The hole in the wall where it will house the trapdoor must have the following dimensions:
L = 34 cm
H = 23.5 cm
Proceed as follows to assemble:
Fig. 61 - Fix the exible hose Fig. 62 - Tighten the clamp Fig. 63 - Remove the cap
Fix the flexible hose to the trapdoor base (see Fig. 61) with the metal clamp (see Fig. 62).
Remove the cap from the structure cover (see Fig. 63).
Fig. 64 - Flexible hose positioning Fig. 65 - Flexible hose xing
Pass the flexible hose inside the hole made in the wall (see Fig. 64).
Fix the pipe end flange to the structure cover, where the cap was previously removed (see Fig. 65).
27
ZEFIRO
3
- ZEN AIRTIGHT
Fig. 66 - Trapdoor external xingTrapdoor external xing Fig. 67 - Trapdoor internal xing
Fix the trapdoor to the door, both internally and externally (see Fig. 66 and Fig. 67).
Fig. 68 - Insert the door in the trapdoor Fig. 69 - Correct hooking of the hinge
Hook the door to the trapdoor (see Fig. 68). Make sure that the hinge is in the correct position (see Fig. 69).
Fig. 70 - Safety lever Fig. 71 - Door closed
Rotate the safety levers to lock the hinges (see Fig. 59).
Close the door (see Fig. 71). The trapdoor is ready to be used.
5.16 FRAME INSTALLATION OPTIONAL
It is possible to insert a compensation/decorative frame around the insert.
Proceed as follows to mount:
ZEFIRO
3
- ZEN AIRTIGHT
28
Fig. 72 - Front xing Fig. 73 - Rear xing 1 Fig. 74 - Rear xing 2
Remove the insert from the structure.
Loosen the 2 hex screws on the base of the structure, fit the frame and tighten the screws again (see Fig. 72).
Fix the frame inside the wall using the supplied flange (see Fig. 73 and Fig. 74).
Insert the insert inside the structure again.
5.17 CONCENTRIC PIPE INSTALLATION OPTIONAL
The insert is designed for the connection of the concentric pipe.
Proceed as follows to assemble:
Remove the ring inside the combustion air fitting (see Fig. 75).
Insert the concentric pipe as in Fig. 76.
Proceed with the connection to the flue pipe (see Fig. 77).
Fig. 75 - Remove the ring Fig. 76 - Concentric pipe connection Fig. 77 - Flue connection
5.18 DISPLAY ROTATION
By default, the display faces left.
Proceed as follows to have the display face right:
29
ZEFIRO
3
- ZEN AIRTIGHT
Fig. 78 - Remove the display Fig. 79 - Remove the at cable Fig. 80 - Remove the screws
Completely remove the door containing the display.
Remove the display (see Fig. 78) and disconnect the flat cable to which it is connected (see Fig. 79).
Remove the 2 screws from the display box (see Fig. 80).
Fig. 81 - Rotate the display box Fig. 82 - Secure the screws Fig. 83 - Connect and reposition the display
Pull the display box back and turn it in the other direction (see Fig. 81).
Fix the box in the new position (see Fig. 82).
Reconnect the flat cable and reposition the display (see Fig. 83).
6 WIFI KIT INSTALLATION
To install the WI-FI Kit, make the power supply cable with plug and faston (see Fig. 84)
Fig. 84 - Plug + Faston
Disconnect the power supply faston (blue - brown) connected directly to the socket and connect them on the double faston of the
power supply cable. Reconnect everything to the main socket. (seeFig. 85 Fig. 86)
ZEFIRO
3
- ZEN AIRTIGHT
30
Fig. 85 - Faston disconnection (blue - brown) Fig. 86 - Double faston connection
Fix the WI-FI module on the bottom of the tank with the power supply cable and the serial cable connected and lock the wi-fi
module feeder on the strut with cable ties as shown. (see Fig. 87)
Fig. 87 - WI-FI module xing
7 SPECIAL MAINTENANCE
7.1 INTRODUCTION
For a long working life of the stove, have a periodic cleaning of the stove as described in the following paragrafs.
Fume outlet pipes (fume conduit + chimney flue + chimney pot) must always be cleaned, scrubbed and checked by an autho-
rized technician in compliance with local regulations, with the instructions of the manufacturer and those of your insurance
company.
It is also necessary to have the combustion chamber, motors and fans cleaned and to have the gaskets and the electronical
elements checked at least once a year.
All these operations must be planned in time with your Autorized Technical Assistance Service.
After a long ineffective time, before turning on the stove check if there are obstructions in the fume exhaust.
If the stove had been using continuously and intensely, the whole system (chimney included), must be cleaned and checked
more frequently.
In case of replacement of damaged pieces please ask for the original spare part at the Autorized Retailer.
31
ZEFIRO
3
- ZEN AIRTIGHT
7.2 FEED SCREW MAINTENANCE
Proceed as follows for the feed screw maintenance:
Fig. 88 - Screw removal Fig. 89 - Coque removal Fig. 90 - Gear motor removal
Enter the tank and loosen the 4 screws of the feed screw coque (see Fig. 88).
Remove the coque (see Fig. 89).
Remove the gear motor by loosening the locking screw (see Fig. 90).
Fig. 91 - Spiral removal Fig. 92 - Bearing removal
Remove the spiral (see Fig. 91).
If worn, remove the bearing (see Fig. 92) and replace it.
To reassemble, proceed in reverse order.
7.3 FLUE GAS EXTRACTOR CLEANING
Every year, clean the flue gas extractor to remove ash or dust causing unbalance of the blades and greater noise.
Remove the insert and loosen the screw behind the right fan (see Fig. 93).
Remove the front screws of the fan (see Fig. 94 and Fig. 95).
ZEFIRO
3
- ZEN AIRTIGHT
32
Fig. 93 - Loosen the screw Fig. 94 - Remove screw 1 Fig. 95 - Remove screw 2
Disconnect the wiring and remove the fan (see Fig. 96).
Remove the flue gas extractor screws (see Fig. 97) and proceed with cleaning.
Fig. 96 - Remove the fan Fig. 97 - Remove the screws
Clean with a brush and vacuum the soot inside (see Fig. 98 and Fig. 99).
Once thoroughly cleaned, put everything back together.
Fig. 98 - Cleaning 1 Fig. 99 - Cleaning 2
7.4 FUME PIPES ANNUAL CLEANING
Clean once a week from soot with brushes.
33
ZEFIRO
3
- ZEN AIRTIGHT
The cleaning operation must be executed by a specialized stove-repairer who will provide for the cleaning of fume pipe, chimney
flue and chimney pot. He will also check their eficiency and will release a written declaration of the safety of the appliance. This
operation must be executed at least once a year.
7.5 GASKET REPLACEMENT
In case of deterioration of fire door, hopper or fume chamber gaskets, it is necessary to replace them by an autorized technician in
order to guarantee the good running of the stove.
Use exclusively original spare parts.
7.6 GLASS REPLACEMENT
In case of break it is essential to replace it before using the stove.
For glass replacement please proceed as follows:
Fig. 100 - Screw removal Fig. 101 - Door proles removal
Remove the screws from glassweight profiles (see Fig. 100).
Remove upper and lower profiles (seeFig. 101).
Take out the damaged glass and replace it only with an original spare part. Please check that the gasket is not damaged and if
necessary, have it replaced.
Reassemble the profiles and screws.
8 IN CASE OF ANOMALY
8.1 PROBLEM SOLVING
Before of every Authorized Technician intervention, the same Technician has the duty to check if the parame-
ters of the mother board correspond to those of the table you own.
In case of doubts regarding the use of the stove, please contact ALWAYS the Authorized Technician on order to
avoi irreparable damages!
ZEFIRO
3
- ZEN AIRTIGHT
34
PROBLEM CAUSE SOLUTION INTERVENTION
The control display
does not switch on
The stove is
without power
supply
Check if the plug is connected.
Burned protection
fuse in the electric
socket
Replace the protection fuses in the electric socket (3.15A-
250V).
Faulty control
display
Replace the control display.
Faulty flat cable Replace the flat cable.
Faulty electronic
board
Replace the mother board.
Pellets do not
reach the combu-
stion chamber
Empty hopper Full the hopper.
Open fire door or
open pellet door
Close fire door and pellet door and check that there are no
pellet grains at the gasket level.
Clogged stove Fume chamber cleaning
Auger blocked by a
foreign object (for
example nails)
Clean the auger.
The auger geared
motor is out of
order
Replace the geared motor.
Check if on the
display there is an
"ACTIVE ALARM"
Have the stove checked.
35
ZEFIRO
3
- ZEN AIRTIGHT
PROBLEM CAUSE SOLUTION INTERVENTION
The fire extinguish
and the stove stops
Empty hopper Full the hopper.
Auger blocked by a
foreign object (for
example nails)
Clean the auger.
Bad quality pellets Try other types of pellets.
Pellet drop value
too low "phase 1"
Adjust the pellet loading.
Check if on the
display there is an
"ACTIVE ALARM"
Have the stove checked.
Flames are weak
and orange colou-
red, pellets do not
burn properly and
the glass blackens
Not sufficient
combustion air
Check as following: probable obstructions of the combusti-
ble air inlet from the back or from the bottom of the stove;
burning pot obstructed holes with too ash remains. Have the
fan blades and auger cleaned.
Obstructed exhaust
The exhaust chimney is partially or totally obsturcted. Contact
an expert stove-repairer who checks the stove from the
exhaust up to the chimney pot. Provide immediately for stove
cleaning.
Obstructed stove Provide immediately at the inner cleaning of the stove.
The fume fan is out
of order
The pellets can burn also thanks to chimney flue depression
without the aid of the fume fan. Have the fume fan imme-
diately replaced. It can be noxious to health to let the stove
running without fume fan.
The exchanger
fan continues to
turn even though
the stove has just
cooled
Faulty fume tem-
perature probe
Replace the fume probe.
Faulty mother
board
Replace the mother board.
Ash remains along
the stove
Faulty or out of
order door gaskets
Replace the gaskets.
Not sealed fume
pipes
Contact an expert stove-repairer who will immediately pro-
vide for sealing the junctions with high-temperature silicone
and/or for replacing pipes with those in compliance to current
regulations. A not sealed fume channelisation can be noxious
to health.
ZEFIRO
3
- ZEN AIRTIGHT
36
PROBLEM CAUSE SOLUTION INTERVENTION
The stove is at its
highest power but
does not heat up.
Ambient tempera-
ture reached.
The stove is at its minimum value. Increase the desired am-
bient temperature.
Stove running and
display showing
"Smoke Overtepe-
rature"
Reached fume
outlet limit tempe-
rature
The stove runs at minimum. NO PROBLEM!
The stove's smoke
duct produces
condensation
Low smoke tempe-
rature
Check that the flue is not clogged.
Increase stove power to minimum (pellet drop and fan revs).
Install condensation collection cup.
Stove running and
display showing
"SERVICE"
Routine main-
tenance alert (it
does not block the
system)
When this flashing message appears upon start-up, it means
that the preset operating hours have elapsed before mainte-
nance. Contact the service centre.
“Pellet reserve
enabling” activates
with the tank full
Failure to reach the
threshold tem-
perature, large or
poor quality pellet,
clogged fume
passage
Increase pellet with “Pellet Recipe or clean the combustion
chamber
9 TECHNICAL DATAS
9.1 FUSE REPLACEMENT
For fuse replacement in the electric socket which stands on the back of the stove, extract the fuses to change with the aid of a
screwdriver for opening the shutter (see Fig. 102).
Fig. 102 - Shutter with fuses to remove
37
ZEFIRO
3
- ZEN AIRTIGHT
9.2 FEATURES
DESCRIPTION ZEFIRO
3
- 9 kW ZEN AIRTIGHT - 9 kW
WIDTH 69,7 cm 69,7 cm
DEPTH 55 cm 55 cm
HEIGHT 49 cm 49 cm
WEIGHT 105 kg 105 kg
INTRODUCED THERMAL POWER (Min/Max) 2,83 - 10,46 kW 2,83 - 10,46 kW
NOMINAL THERMAL POWER (Min/Max) 2,7 - 9,26 kW 2,7 - 9,26 kW
EFFICIENCY (Min/Max) 94,2 - 88,5 % 94,2 - 88,5 %
FLUE GAS TEMPERATURE (Min/Max) 79 - 197°C 79 - 197°C
MAXIMUM FLUE GAS FLOW RATE (Min/Max) 2,6 - 5,7 g/s 2,6 - 5,7 g/s
CO EMISSIONS (13% O2) (Min/Max) 0,024 - 0,012 % 0,024 - 0,012 %
OGC EMISSIONS (13% O
2
) (Min/Max) 3,3 - 2,6 mg/Nm
3
3,3 - 2,6 mg/Nm
3
NOX EMISSIONS (13% O
2
) (Min/Max) 108 - 127 mg/Nm
3
108 - 127 mg/Nm
3
Average CO CONTENT at 13% O
2
(Min/Max) 294 - 148 mg/Nm
3
294 - 148 mg/Nm
3
Average DUST CONTENT at 13% O
2
(Min/Max) 19,2 - 18,9 mg/Nm
3
19,2 - 18,9 mg/Nm
3
FLUE NEGATIVE PRESSURE (Max) 11,9 Pa 11,9 Pa
ON SHARED FLUE NO NO
FLUE GAS EXHAUST DIAMETER Ø80 mm Ø80 mm
FUEL Pellet Ø6-7 mm Pellet Ø6-7 mm
PELLET HEATING CAPACITY 5 kWh/kg 5 kWh/kg
PELLET HUMIDITY ≤ 10% ≤ 10%
HEATABLE VOLUME 18/20°C Coeff. 0.045 kW (Min/Max) 62,4 - 222 m
3
62,4 - 222 m
3
HOURLY CONSUMPTION (Min/Max) 0,59 - 2,17 kg/h 0,59 - 2,17 kg/h
HOPPER CAPACITY 15 kg 15 kg
RANGE (Min/Max) 25 - 6,9 h 25 - 6,9 h
POWER SUPPLY 230 V - 50 Hz 230 V - 50 Hz
ABSORBED POWER (Max) 346 W 346 W
STARTER RESISTANCE ABSORBED POWER 300 W 300 W
MINIMUM EXTERNAL AIR VENT (final cross-section) 80 cm
2
80 cm
2
SEALED CHAMBER STOVE YES YES
EXTERNAL AIR VENT FOR SEALED CHAMBER 60 mm 60 mm
DISTANCE FROM COMBUSTIBLE MATERIAL (back/side/bottom) 200 / 200 / 0 mm 200 / 200 / 0 mm
DISTANCE FROM COMBUSTIBLE MATERIAL (ceiling/front) 750 / 1000 mm 750 / 1000 mm
CADEL srl
31025 S. Lucia di Piave - TV
Via Foresto sud, 7 - Italy
Tel. +39.0438.738669
Fax +39.0438.73343
www.cadelsrl.com
www.free-point.it
Rev. 01 - 2018
3

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Cadel ZEN AIRTIGHT - 2018 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Cadel ZEN AIRTIGHT - 2018 in de taal/talen: Engels als bijlage per email.

De handleiding is 8,15 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

Andere handleiding(en) van Cadel ZEN AIRTIGHT - 2018

Cadel ZEN AIRTIGHT - 2018 Gebruiksaanwijzing - Nederlands - 36 pagina's

Cadel ZEN AIRTIGHT - 2018 Installatiehandleiding - Nederlands - 39 pagina's

Cadel ZEN AIRTIGHT - 2018 Installatiehandleiding - Deutsch - 40 pagina's

Cadel ZEN AIRTIGHT - 2018 Gebruiksaanwijzing - Deutsch - 36 pagina's

Cadel ZEN AIRTIGHT - 2018 Gebruiksaanwijzing - English - 36 pagina's

Cadel ZEN AIRTIGHT - 2018 Gebruiksaanwijzing - Français - 36 pagina's

Cadel ZEN AIRTIGHT - 2018 Installatiehandleiding - Français - 50 pagina's


Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info