591911
12
Verklein
Vergroot
Pagina terug
1/128
Pagina verder
12 | English
1 609 92A 0PW | (31.10.14) Bosch Power Tools
Fasten the drill stand (with drill inserted) using anchors or
vacuum so that the mounted core bit is aligned with the
marked dimensions.
Fastening with Anchor (see figure B)
For fastening of the drill stand to brickwork or concrete with
anchor (accessory), drill a separate anchor hole.
The following dimensions apply for the anchor hole:
Insert a concrete hammer-drive anchor or a brickwork anchor
16. Screw the quick-clamping spindle 17 into the anchor.
Position the drill stand, attach a washer, and then screw to-
gether with the wing nut 18. After levelling (see “Levelling”),
tighten the wing nut using an open-end spanner, size 27 mm.
Fastening with Vacuum (Accessory)
To fasten the drill stand with vacuum, you require a conven-
tional vacuum pump and a Bosch vacuum set (accessory).
The vacuum pump must meet the following minimum require-
ments:
The surface must be smooth and flat in order to fasten with
vacuum. Use on plaster or brickwork is not permitted.
Once the vacuum connection has been established, apply the
levelling screws 6 lightly to the surface so that the drill stand
is in a rigid position and the sealing ring relaxes slightly. Oth-
erwise the drill stand will sit very softly on the sealing ring.
Read and observe the operating instructions of the vacuum
pump and Bosch vacuum set in order to connect them.
The safety and operating instructions for the vacuum
pump and vacuum set are to be strictly observed!
Levelling (does not apply for fastening with vacuum)
Turn the levelling screws 6 in or out individually until the spirit
level 14 on the drill (when mounting vertically) or the spirit
level 15 on the drill (when mounting horizontally) is precisely
aligned.
Now fix the drill stand firmly using anchor attachment.
Operation
Disconnect the plug from the power source before
making any adjustments or changing accessories.
Starting drills accidentally is the cause of some accidents.
After each adjustment on the drill stand, firmly retight-
en all screws.
Drilling-angle Adjustment
Loosen the lower screw 8 of the drilling-angle adjustment
using an open-end spanner (size 17 mm) and take it off.
Loosen the upper screw 5 using an open-end spanner (size
17 mm).
Loosen the clamping nut 11 using an open-end spanner (size
24 mm). Set the drill stand to the required drilling angle.
Retighten the clamping nut 11 using the open-end spanner.
Tighten the upper screw 5 using an open-end spanner (size
17 mm).
The drill stand must not be inserted until the clamping
nut 11 and screw 5 of the angle adjustment have been
retightened.
After drilling, put the drilling column 4 back in the vertical po-
sition in reverse order (drilling angle of 0°). To do so, you have
to insert the lower screw 8 again and tighten it using an open-
end spanner (size 17 mm).
Water Extraction
You require a water collection ring and a wet/dry vacuum
cleaner (both accessories) to collect the water escaping from
the bore hole during wet drilling.
The water collection ring (see “Accessories”, page 13) is in-
tended for use with the drill stand for diamond drills GCR 180
and the diamond drill GDB 180 WE.
Mounting the Water Collection Ring (see figure C)
Cut an opening for the required drilling diameter in the seal-
ing lid.
Slide the tension spring 19 all the way into the gap between
the bottom plate 9 and the drilling column 4. Ensure that the
angled part of the tension spring faces downwards.
Bring the water collection ring into position and place the ten-
sion spring on the contact points on the water collection ring.
(The lugs on the ends of the tension spring are used to pull the
tension spring upwards.)
The tensioning force of the spring will press the water collec-
tion ring with its seal onto the surface and together with the
vacuum of the wet/dry vacuum cleaner will prevent water
from escaping.
Working Advice
For drilling, observe the operating instructions of your
diamond drill.
To drill, loosen the parking brake 13 until the star handle 1 is
easy to move. When doing so, hold the star handle in place in
order to prevent the drill from sliding down in an uncontrolled
manner.
Use the star handle 1 to turn the drill down to the required
drilling depth.
Then, turn the crank back until the core bit is completely visible.
To achieve the maximum possible working length, you have to
remove the drill core as soon as it completely fills the core bit.
Then feed the core bit back into the bore hole and drill to the
maximum depth.
Clearance from anchor holecentre of the intended bore
hole
optimal 210 mm
possible 200300 mm
Diameter Depth
Brickwork 20 mm 85 mm
Concrete 16 mm 50 mm
Volume flow: 6 m
3
/h
Vacuum at least: 80 % (–800 mbar)
OBJ_BUCH-2243-001.book Page 12 Friday, October 31, 2014 12:11 PM
12

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Bosch GCR 180 Professional bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Bosch GCR 180 Professional in de taal/talen: Nederlands, Duits, Engels, Frans, Italiaans, Portugees, Spaans, Pools, Turks, Deens, Zweeds, Noors, Fins als bijlage per email.

De handleiding is 8,66 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info