577300
7
Verklein
Vergroot
Pagina terug
1/63
Pagina verder
01/2014
DUSPOL
®
expert
7
atelybeforeandafterusingit!
Activation of the self-test:
• Short-circuittheprobetipsL1/-
2
and L2/+
3
.
• Pressandholdthepush-button
6
ofthedisplayhan-
dle L2
3
for approx. 3 seconds to start the self-test.
• The buzzersounds, all LEDs(except forthe -12V
LEDor+ 12VLED)
9
and the measuring point il-
lumination must be functioning.
- Replace the batteries, if the self-test cannot be activated
anymore.
- Test the voltage tester with familiar voltage sources, e.g.
witha230Vsocket.
- Do not use the voltage tester, if the voltage indication, the
phase indication and the vibration motor are not working
properly!
4. Checking the absence of voltage of an installation(g-
ure B/C)
For checking the installation, please test the absence of
voltagebycheckingthevoltageindication,thephaseindication
(the phase indication only works in an earthedAC voltage
mains) and the vibration motor (the vibration motor is activated
byactuatingbothpush-buttons).Theinstallationisonlyfree
of voltage, if all three test circuits (voltage indication, phase
indication and vibration motor) are signaling the absence of
voltage.
- ApplythetwoprobetipsL1/+
2
and L2/-
3
tothesystem
parts to be tested.
- Thelevelofvoltageappliedisindicatedbymeansofthe
LEDstepindicator
9
.
- AflashingLEDstepindicatesthatthevoltagevalueofthis
LED step hasnot been reached(except forLED 12V/
24V).ALEDstepwillstarttolightfrom75%to85%of
the step value onwards.
- Alternatingvoltages(AC)areindicatedbythe+12VLED
and the -12VLEDlightingupsimultaneously.
- Direct voltages (DC) are indicated by the + 12 V LED
orthe-12VLEDlighting up.Thepolarity indication
J
shows the polarity (+ or -) applied to the probe tip L2/+
3
.
- Todifferentiatebetweenlow-energyandhigh-energyvolt-
ages(e.g.capacitivelyinducedinterferencevoltages),an
internalloadinthevoltagetestercanbeconnectedbyac-
tuating both push-buttons (see section 5).
Overload indication
If the voltage applied to the probe tips L1/-
2
and L2/+
3
is higher than the admissible nominal voltage, all LEDs of
the step indicator
9
areashing.Overloadisindicatedfrom
1,100VAC/DCon.
5. Load connection with vibration motor (gureB/C)
Both handles L1
7
and L2
8
are equipped with push-buttons
6
.Here,voltage is appliedtoavibrationmotor(motor with
unbalancedmass)inthedisplayhandleL2
8
.
From approx. 200 V on, this motoris set in rotarymotion.
With the voltage increasing, the motor's speed and vibration
increases as well. The duration of the test with a lower inter-
nal resistance (load test) depends on the level of voltage to
be measured. In order to avoid an inadmissible warming of
the device, it is provided with a thermal protection (controlled
reduction). With this controlled reduction, the speed of the vi-
bration motor is reduced and the internal resistance increases.
The load connection (with both push-buttons being actuated)
can be used ...
- to suppress reactive voltages (inductive and capacitive
voltages),
- to charge capacitors,
- totrip10/30mAFIsafetyswitches.ThetrippingoftheFI
safety switch is done by testing the external conductor
(phaseindication)toPE(earth).(figureD)
6. External conductor test (phase indication)(gureD)
- FullygraspthehandlesL1
7
and L2
8
, in order to en-
sure a capacitive coupling to earth.
- ApplytheprobetipL2/+
3
tothesystemparttobetested.
During the single-pole external conductor test (phase in-
dication),makeabsolutelysurenottotouchtheprobetip
L1/-
2
and that it remains contactless.
- IftheredLED
K
lightsuponthedisplay,theexternal
conductor(phase)ofanACvoltageisappliedtothissys-
tem part.
Note:
The single-pole external conductor test (phase indication)
canbecarriedoutinanearthedmainsfrom230V,50/60Hz
(phase to earth) on. Protective clothing and insulating condi-
tions on site might impair the function.
Attention!
Theabsenceofvoltagecanonlybedeterminedbymeansof
a two-pole test.
7. Phase sequence test (gureF/G)
- FullygraspbothhandlesL1
7
and L2
8
, in order to en-
sure a capacitive coupling to earth.
- ApplytheprobetipsL1/-
2
and L2/+
3
to two external
conductors (phases) and check whether the external con-
ductorvoltageofe.g.400Visapplied.
- A clockwise phase sequence (phase L1 before phase L2)
isgiven,ifthegreenLED►ofthephasesequenceindica-
tion
L
lights up.
- A counter-clockwise phase sequence (phase L2 before
phaseL1)isgiven,ifthegreenLED◄ofthephasese-
quence indication
L
lights up.
- Thephasesequencetestalwaysrequiresacountercheck
with the probe tips L1/-
2
and L2/+
3
being inverted dur-
ing which the phase sequence must change.
Note:
The phase sequence test can be carried out in an earthed
three-phase mains from 230V - 900 V,50/60 Hz (phase to
7

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Benning Duspol Expert bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Benning Duspol Expert in de taal/talen: Nederlands, Duits, Engels, Frans, Italiaans, Spaans, Pools, Turks, Deens, Zweeds, Noors, Fins als bijlage per email.

De handleiding is 7,54 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info