810554
29
Verklein
Vergroot
Pagina terug
1/36
Pagina verder
29
Other bushings PG9, PG7 are for other signals of the
room thermostat and the 3-ways valve.
3.4.2 Installation of the room thermostat
Connection of the room thermostat is necessary to do
with twin core cable with recommended diameter min.
Cu 0,5 mm2 and length to 25 m.
The cable for the room thermostat is not allowed to be
placed in the same way with supply cord or another
electric or industrial installation. Minimal separation is
10 cm.
The switch board for the room thermostat connection
(24V) is placed in the right part of the control unit from
the front face, the clamp with marking TER, the room
thermostat has clamps with bridge from the factory
setting.
3.4.3 Installation of mode TUV (heating of
sanitary water) and the storage water tank
If you want to heat TUV (heating of sanitary water), it is
necessary to connect through the electric boiler with
TUV connection set and extend the control unit with
TUV mode.
The complete set consists of:
mode TUV
sensor TUV
3-ways valve
connection cable of TUV mode to the control unit
connections parts and materials
instruction manual
Connection of TUV mode is carried on with the flat
conductor to the connector on the left side of the control
unit (marked TUV). It is necessary to connect a phase 230
V to switchboard X2 according to the circuit diagram with
the conductor enclosed.
Connection of phase conductors of 3-ways valve is carried
on to the switchboard on the TUV mode. Connection of
“working zero” is carried on to the switchboard X2, the
sensor of TUV temperature is connected to the
switchboard on the TUV mode.
More detailed description is enclosed in the TUV
connection set (package).
TUV mode connection through is able to
carry on only responsible service
person.
3.4.4 Installation of GSM mode control
If you want to use the GSM control of the electric boiler
then it is necessary to extend the control unit with GSM
mode.
The GSM mode consists of:
GSM modem (with basic type of aerial)
flat conductor for connection through
connections parts and materials
instruction manual
GSM modem connection is carried on with the flat
conductor to the switchboard GSM on the left part of the
control unit. The flat conductor has to be pulled through
the inlet of upper cover of the boiler. GSM modem is
necessary to screw or to fix another way to the cover of
the boiler to avoid its dismantling. For GSM modem
mounting use inlets on the upper cover of the boiler. If you
have a not strong GSM signal from network then it is
possible to buy additional external aerial determined for
GSM modem SIEMENS.
Aerial parameters:
Frequency scale: 900/1800 MHz (Dual-band)
Impedance: 50 Ohm
Connector: SMA (male)
More detailed description is enclosed in the TUV
connection set (package).
3.5 Heating system
The pipe system of heating system has to be made to
avoid forming of air bubbles and to make easy the process
of deaeration. Deaeration valves have to be placed on
each highest heating system place and on all radiators.
We recommend making the heating pipe from copper.
Plastic pipes have to fulfill requests of heating resistance
and have guaranteed heat resistance have not to loose
parts in the heating water to avoid paralysation of
regulation and safety function components, including the
pump.
The boiler has to be installed in opened or closed heating
system according to the normative conditions
(overpressure of heating system, maximal volume of
heating system).
The boiler could be used for underfloor heating, minimal
temperature of heating water is 30°C. The boiler has not
equipped by the sensor of maximal temperature of
heating water for underfloor heating,, it has to be carried
on by external thermostat connected by its clamps to the
electric boiler.
Using of defrost mixture
We don´t recommend to use defrost mixtures due to their
characteristics, some of them are not convenient for the
boiler operation, concretely reducing of heat
transmission, big volume elasticity, ageing, breakdowns of
rubber parts. It is necessary to think about to use them
inevitable. Regarding inevitable situation it is allowed to
use the defrost mixture Alicol Termo according to
experience of the producer that the boiler operation is not
reducing.
If you are not able to use this defrost mixture and you will
protect your heating system with another defrost mixture
then guarantee claim will not be accepted
3.6 Expansion vessel
The expansion vessel has these parameters:
Total volume 8 dm3
Overpressure of nitrogen filling 1,2 bar
Size 8 l
The expansion vessel eliminates warm elasticity of
heating medium (water) in the heating system therefore
it is necessary to have its sufficient volume. The size of
expansion vessel is projected by a responsible person
technician of heating system project. Below mentioned
is a graph for your basic orientation knowledge of
dependency.
29

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw ATTACK Electric Excellent bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van ATTACK Electric Excellent in de taal/talen: Engels als bijlage per email.

De handleiding is 3.14 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info