810554
5
Verklein
Vergroot
Pagina terug
1/36
Pagina verder
5
Mounting of the boiler could be carried out only by
authorized company or persons.
On the boiler and 100mm before the boiler there is
not allowed a placement of things from flammable
materials.
The boiler mounted on the wall is not able to be
moved or placed to another place.
Boiler connection is allowed only with nut with flat
ring sealing.
It is necessary to put heating water inlet with a filter
and shut off valves.
It is necessary to leave a free space on both side
walls of the boiler 100 mm and minimally 400mm
from the top for after sales service. In case that you
will not observe this request for free space you have
to pay dismantling and mounting the boiler back to
the wall and to heating system, it is not a repair paid
in guarantee period!
1.3.2 Putting into operation
Putting the boiler into operation has to be carried out
only by authorized professional company or service
person that has a valid agreement signed with the
producer. The list of these companies is enclosed.
The company or person who will put the boiler into
operation has an obligation to assure repairs of
breakdowns or defects in guarantee period. In case that
this company doesn't exist anymore, the guarantee
repair will be assured by any company from the list
closed to you.
By putting the boiler into operation the authorized
person is obligated to:
control connections of the boiler to electric supply
network and to heating system
control tightness of the boiler
control all functions of the boiler
inform the user about boiler operation, its control and
maintenance
inform the user about safety dimensions from sides of
the boiler from flammable walls and its protection
according to ČSN 061008 and ČSN 730823.
To fulfil requests for boiler safety and economic
operation it is necessary to observe below mentioned
conditions:
for boiler mounting and installing the user has to get the
permission from the company who is a distributor of
electricity in your region, control the input of the boiler if
it is in accordance with the input stated in the
permission
for mounting of the boiler it is necessary to have an
authorized technical project for heating system and for
connection of electric boiler
the boiler is able to be mounted only in an environment
according to its determination and according to the
project
manipulation, operation, using, control and
maintenance of the boilers are forbidden if it is not in
accordance with rules and directions of this instruction
manual. It is forbidden mainly to disconnect any of
safety units or elements in the boiler!!!
If the guarantee list is not filling fully, it is not valid
If you take the boiler from the colder environment
to the warmer one (for example if the outside
temperature is below 0° C or C and you want to
m o u n t i t i n s i d e ) , p l e a s e w a i t
approximately 2 hours.
1.3.3 Operation of the boiler
The boiler has to be controlled and used only
according to advices and instructions stated
in this instruction manual, only by adult
person who was posted in maintenance of
the boiler. Putting the boiler into operation will made by
authorized service person during the heating test.
Any manipulation, operation, using and maintenance of
the boiler, which is not in accordance with instructions
and advices stated in this instruction manual, is
inadmissible. The producer is not responsible for
damages caused by wrong using and maintenance of
the boiler.
The producer recommends periodical service controls
of the boiler 1x per year before heating season. The
service control could be done only by a professional
authorized service company or person. The list of
service control steps recommend to be controlled
before heating season you will find in the chapter
“maintenance”.
The producer allows only room thermostat connection,
if the room thermostat has with potentional-free outlet
connection. The authorized service person is
responsible during putting the boiler into operation to
fill and sign guarantee card.
If you find any breakdown or any defect on an electrical
part of the boiler, please, don´t repair it by yourself,
disconnect the boiler from the electric supply network
and ask for after sales service person.
It is not allowed to use the boiler ELECTRIC-EXCELLENT
for another purposes than is stated in this instruction
manual.
1.3.4 Safety
Fire instructions:
Disconnect the boiler from the electric supply
network and take out it out of its operation according
to possibilities.
Extinguish fire using pulverized or
snows extinguish appliance flammable
and explosive materials
Don't stock any flammable and explosive
things closed to the boiler (for example
paper, colours, chemicals etc.)
1.7 Description of function
1.7.1 Technical description
The boiler is designed according to valid norms
5

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw ATTACK Electric Excellent bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van ATTACK Electric Excellent in de taal/talen: Engels als bijlage per email.

De handleiding is 3.14 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info