or placed to another place.
NOTICE! If you take the boiler from
The boiler has to be connected by the nut with flat ring
colder environment to warmer (for
sealing. example if the outside temperature is
It is necessary to connect the heating water inlet with
below C or C and you want to
a filter and shut off valves. mo un t i t i ns id e), p lea se wa it
It is necessary to leave a free space on both side walls approximately 2 hours
of the boiler 100 mm and minimally 400 mm from the
top for after sales service. In case that you will not
1.3.3 Operation of the boiler
observe this request for free space you have to pay
dismantling and mounting the boiler back to the wall The boiler has to be controlled and used only
and to heating system, it is not repair paid in according to advices and instructions stated in this
guarantee period! instruction manual, only by adult person who was
posted in maintenance of the boiler. Putting the boiler
into operation will made by authorized service person
1.3.2 Putting into operation during the heating test.
Putting the boiler into operation has to be carried out
Any manipulation, operation, using and maintenance
only by authorized professional company or service of the boiler, which is not in accordance with
person that has an valid agreement signed with the instructions and advices stated in this instruction
producer. The list of these companies is enclosed. manual, is inadmissible. The producer is not
The company or person who will put the boiler into
responsible for damages caused by wrong using and
operation has an obligation to assure repairs of maintenance of the boiler.
breakdowns or defects in guarantee period. In case The producer recommends periodical service
that this company doesn't exist anymore, the controls of the boiler, 1x per year before heating
guarantee repair will be assured by any company from season. The service control could be done only by a
the list closed to you. professional authorized service company or person.
The list of service control steps recommend to be
By putting the boiler into operation the authorized
controlled before heating season you will find in the
person is obligated to: chapter “maintenance”.
control connections of the boiler to electric supply The producer allows only room thermostat
network and to heating system
control tightness of the boiler connection, if the room thermostat has with potential-
control all functions of the boiler free outlet connection.The authorized service person
inform the user about boiler operation, its control and is responsible during putting the boiler into operation
maintenance to fill and sign the guarantee card.
inform the user about safety dimensions from sides of If you find any breakdown or any defect on an
the boiler from flammable walls and its protection electrical part of the boiler, please, don´t repair it by
according to ČSN 061008 and ČSN 730823. yourself , disconnect the boiler from the electric
To fulfil requests for boiler safety and economic supply network and ask for after sales service repair
operation it is necessary to observe below mentioned your service person.
conditions: It is not allowed to use the boiler Electric Easy for
for boiler mounting and installing the user has to get another purposes than is stated in this instruction
the permission from the company who is a distributor manual.
of electricity in your region, control the input of the
boiler if it is in accordance with the input stated in the 1.3.4 Safety
permission
the company carrying out the mounting is responsible
to observe the technical project and concrete Fire instructions:
correlative norms and regulations regarding the
mounting and installing of direct heated electric boilers Disconnect the boiler from the electric
supply network and take out it out of its
in central heating systems. operation according to possibilities.
for mounting of the boiler it is necessary to have an Extinguish fire using pulverized or snows
authorized technical project for heating system and for extinguish appliance flammable and
connection of the electric boiler explosive materials.
the boiler is able to be mounted only in an Don´t stock any flammable and explosive
environment according to its determination and things closed to the boiler (for example paper,
according to the project. colours, chemical etc.)
Manipulation, operation, using, control and
maintenance of the boilers are forbidden if it is not in
accordance with rules and directions of this instruction
manual. It is forbidden mainly to disconnect any of
safety units or elements in the boiler!!!
If the guarantee list is not filling fully, it is not valid.
4
4

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw ATTACK Electric Easy bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van ATTACK Electric Easy in de taal/talen: Engels als bijlage per email.

De handleiding is 4.4 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info