123122
installation
3-phase connection (3 a.c. 230 V / 50 Hz):
The voltage between the phases is 230 V a.c.
Install connecting bridges between the connection points 4-5. Uw groepen
moeten afgezekerd zijn met minimaal 16 A (3x). The connecting power cable
must have a minimum core cross section of 2,5 mm
2
.
You can use the bridges provided on the connecting block to make the
required interconnections as indicated in the preceding illustrations. How to
install the bridges is indicated in the junction box cover and in the illustration
below. The bridges should not be placed immediately on top of the connecting
wires, but between the screw-head and the clamp around the connecting wire.
Secure the cable with the strain relief and close the cover.
installation
Special connections:
1 phase connection (1 1N a.c. 230 V / 50 Hz):
The voltage between live and neutral is 230 V a.c.
Install connecting bridges between connection points 1-2 and 4-5. Your group
must be protected by a fuse of at least 32 A. The connecting power cable must
have a minimum core cross section of 6 mm
2
.
2 lives with 1 neutral connection (2 1N a.c. 400 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c. Between the lives
there is a voltage of 400 V. If there is not a voltage of 400 V between the
lives, two wires have been taken from the same live in the meter cupboard
and the hob must be connected with two neutral wires, as indicated above
under 2 lives with 2 neutrals. Install a connecting bridge between the
connection points 4-5. Your groups must be fused with at least 16 A (2x). The
connecting power cable must have a minimum core cross section of 2,5 mm
2
.