810514
61
Verklein
Vergroot
Pagina terug
1/77
Pagina verder
C07100DC023
60
COMMISSIONING
Commissioning should not be undertaken if the wind is abnormally high or blustery, nor should it be undertaken
by anyone without suitable experience, testing equipment and working knowledge of the relevant standards and
regulations.
The customers who will operate the stove are an essential component of any installation.
Ensuring they understand the operation of the stove, its controls and what to expect from the installation,
whether simple or complex, is probably the most important single aspects of commissioning. Someone who
understands never queries a satisfactory stove, but will tell you when something actually is wrong.
Pre Commissioning Checks
The installation should be inspected to ensure the work is complete and the workmanship satisfactory. The
commissioning engineer will be held responsible for any faults with the installation that would have been
apparent at the time of commissioning. No stove should be commissioned if any part of the installation does not
comply with the relevant standards and regulations.
The oil tank should be examined to confirm there is a supply of the correct grade of oil, that a filter and working
isolation valve is fitted. Having verified that the oil pipe work up to the stove is complete and that the fire valve is
closed, the tank isolation valve should be opened and the pipe work inspected for leaks. The pipe into the inlet of
the metering valve should be uncoupled, the fire valve opened and a minimum of one litre of oil collected into a
suitable receptacle. If dirt or water is present in this sample additional oil should be allowed through the pipe
work until it is free from contaminates. The fuel pipe work should be reassembled and the stove’s combustion
pressure testing point located.
If a boiler is fitted, all the control systems and valves should be set to allow for the system heating. The draught
stabilizer should be examined to ensure it opens and closes freely before lighting the stove following the lighting
instuctions relevant to the stove being commissioned.
Commissioning
Shortly after the stove is lit a stove air pressure reading should be taken and the pressure monitored at fifteen
minutes intervals to ensure the stove and the flue are operating safely with sufficient air. As the stove and flue
warm, the supply of air being induced into the burner will increase, and it will be possible to raise the stove’s
firing rate progressively until the stove is running at maximum output. The entire stove and flue should be
allowed to reach normal operating temperature but if becomes apparent that the stabilizer will have difficulty in
limiting the negative pressures within the stove, the burner should be extinguished and an additional stabilizer
should be fitted to the flue pipe.
These are illustrated in the flue draught and governing plate section.
Allow the stove to run at maximum output for at least thirty minutes and turn to minimum for a further fifteen
minutes. At minimum output the stabilizer will normally be shut and if needing to be open to achieve the correct
negative pressure within the stove it is likely further restriction of the flue will be necessary.
The low fire setting of the fuel metering valve has been set at the factory and should only be changed if the
reasons for doing so and the consequences understood; it must never be adjusted to overcome conditions.
61

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Nestor Martin S21 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Nestor Martin S21 in de taal/talen: Nederlands, Engels, Frans als bijlage per email.

De handleiding is 4.75 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info