516068
2
Verklein
Vergroot
Pagina terug
1/2
Pagina verder
OUTDOOR UNIT
Removal Of Air From The Pipe And Gas Leakage Inspection
Gas Leakage Inspection
Please use gas leakage detector to check if leakage
occurs at the connection of Flare nut as shown on
the right.
If gas leakage occurs, further tighten the connection
to stop leakage.
FINAL STAGE OF INSTALLATION
Insulation And Maintenance Of Pipe Connection
1
The connected terminals should be completely sealed with
heat insulator and then tied up with rubber strap.
Please tie the pipe and power line together with vinyl tape as
shown in the figure showing the installation of Indoor and
Outdoor units. Then fix their position with holders.
To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
Completely seal any gap with putty.
Installation Of Remote Controller
2
Power Source And Operation Test
3
The remote controller can be placed in its holder which is
fixed on wall or beam.
To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller
at the place where the holder is to be fixed. The unit will beep
when signal is received from the remote controller. The signal
transmission is weaken by the fluorescent light. Therefore,
during the installation of the remote control holder, please
switch on the light, even during day time, to determine the
mounting location of the holder.
Power Source
CAUTION
!
Please use a new socket. Accident may occur due to the use of old
socket because of poor contact.
Please plug in and then remove the plug for 2 – 3 times. This is to
ensure that the plug is completely plugged into the socket.
Keep additional length for the power cord and do not render the
plug under external force as this may cause poor contact.
Do not fix the power cord with U-shape nail.
Operation Test
Please ensure that the air conditioner is in normal
operating condition during the operation test.
Explain to your customer the proper operation
procedures as described in the user’s manual.
<
IA321: A
>
The controller must
be hooked onto the
hook at the lower
part of the holder.
Push in the remote
controller in the
direction as shown
in figure below.
3
Procedures of using Vacuum Pump for Air Removal
As shown in right figure, remove the cap
of valve core. Then, connect the charge
hose. Remove the cap of valve head.
Connect the vacuum pump adapter to
the vacuum pump and connect the
charge hose to the adapter.
Fully tighten the “Hi” shuttle of the
manifold valve and completely unscrew
the “Lo” shuttle. Run the vacuum pump
for about 10–15 minutes, then completely
tighten the “Lo” shuttle and switch off
the vacuum pump.
2
Completely unscrew the spindle of the
service valve (at 2 places) in anti-
clockwise direction to allow the flow of
coolant (using Hexagonal Wrench key).
3
Remove the charge hose and tighten the
cap of valve head. Check the cap’s
periphery if there is any gas leakage.
The task is then completed.
4
1
Preparation of Pipe
1
Use a pipe cutter to cut the copper pipe.
Jagged edge will cause leakage.
Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.
Before flaring, please put on the flare nut.
Pipe Connection
2
INSTALLATION OF REFRIGERATING PIPES AND AIR REMOVAL
CAUTION
!
AIR REMOVAL
WARNING
If you cannot attach the side cover due to the
connecting cord, press the connecting cord in
direction to the front panel to fix it.
Be sure that the hooks of the side cover is fixed
in certainly. Otherwise water leakage may occur
and this causes short circuit or faults.
The connecting cord should not touch to service
valve and pipes. (It becomes high temperature
in heating operation.)
The naked part of the wire core should be 10 mm and fix
it to the terminal tightly. Then try to pull the individual wire
to check if the contact is tight. Improper insertion may
burn the terminal.
Be sure to use only power cables approved from the
authorities in your country. For example in Germany: Cable
type: NYM 3x1.5mm
2
.
Please refer to the installation manual for wire connection
to the terminals of the units. The cabling must meet the
standards of electrical installation.
There is an AC voltage drop between the L and N terminals
if power is on. Therefore, before servicing, be sure to
remove the plug from the AC outlet or switch off the main
switch.
Do not make any connection in the middle of the connecting
cable. It may cause the wire overheating, emit smoke and
fire.
Checking for the electric source
and the voltage range
Before installation, the power source must be checked and
necessary wiring work must be completed. To make the wiring
capacity proper, use the wire gauges list below for the lead-in from
a pole transformer and for the wiring from a switch board of fuse
box to the main switch and outdoor unit in consideration of the
locked rotor current.
Investigate the power supply capacity and other
electrical conditions at the installation location.
Depending on the model of room air conditioner
to be installed, request the customer to make
arrangements for the necessary electrical work
etc.
The electrical work includes the wiring work
up the outdoor. In localities where electrical
conditions are poor, use of a voltage regulation
is recommended.
IMPORTANT
Cable length
up to 16m
up to 15m
up to 25m
Wire cross-section
1.6mm
2
2.5mm
2
4.0mm
2
IMPORTANT
THIS APPLIANCE
MUST BE EARTHED.
Procedures of Wiring
Wiring of The Outdoor Unit
Please remove the side cover for wire connection.
!
WARNING
!
CONNECTION OF POWER CORD
Please be careful when bending the copper pipe.
Screw in manually while adjusting the center. After that, use of torque wrench to
tighten the connection.
WARNING
!
In case that power is supplied from Indoor Unit
How to Remove The Front Cover
BASE
DRAIN PIPE
Please use exclusive
tool
CAUTION
!
In case of removing flare nut of an Indoor unit, first remove a nut
of small diameter side, or a seal cap of big diameter side will fly
out. Prevent water from entering into the piping when working.
When the meter reaches - 101KPa
(-76cmHg) during pumping, fully
tighten the shuttle.
Meter showing pressure
Closed
Manifold valve
Vacuum
pump
Valve
Charge hose
Valve
Vacuum pump
adapter
When pumping starts, slightly loosen the
flare nut to check of air sucked in. Then
tighten the flare nut.
Fuse Capacity
10A time delay fuse
After remove the screw
and cover, and put the
connecting cords and fix
the cover with screw.
1 Remove the front panel.
Please remove and attach the front panel by both hands.
After opening the front panel by both hands.
1 Undo the right arm while pushing it inside.
2 Slide the front panel to right as shown in figure. Then
remove while pulling it to front.
2 Remove the filters.
3 After removing two screws, pull the center of the front
cover towards you and release the claws.
4 Pull the side faces (lower sections) of the front cover
towards you as shown in the figure and remove the
cover.
How to Attach the Front Cover
1 Check that the drain pan is securely attached.
2 After installing the front cover onto the unit, hook three
claws at upper side of the cover securely. Then, push the
center of the front cover to lock the claws.
3 Tighten the two screws.
4 Install the filter.
5 Slide the shafts of the right and left arms on the washable
panel along the steps to insert the shafts into the holes till
they stop. After checking that the shafts are securely
inserted, close the panel.
CONDENSED WATER DISPOSAL OF OUTDOOR UNIT
There are holes on the base of Outdoor unit for condensed
water to exhaust.
In order to flow condensed water to the drain, the unit is installed on a
stand or a block so that the unit is 100mm above the ground as shown
figure. Join the drain pipe to one hole.
At first insert one portion of the hook to the base (Portion A), then pull the
drain pipe in the direction shown by the arrow while inserting the hook
into the base. After installation, check whether the drain pipe cling to the
base firmly.
When using in cold region, etc.
In cold region with severe cold climate and heavy snow, water
discharged from heat exchanger freeze on the base surface and this
may affect drainage. In such a region, remove bush on the bottom face
of outdoor unit for better drainage. When using drainpipe, consult our
dealer.
A
Copper pipe
Trimming tool
A
Die
Die
Copper pipe
Wrench
Torque
wrench
Flare nut
Lo Hi
The body of
service valve
Cap of
valve core
Hexagonal
Wrench Key
Cap of valve head
Cap of valve head
L
N
DCBADCBA
Indoor Unit
Line Cord
AC 220-240V
Outdoor Unit
Connecting Cord
1.6 or 2.0
2.0
Sleeve of
protection pipe
Putty
Putty
Insulation material for pipe connection
Remote
Controller
Holder for
Remote Controller
Screw (2 pieces)
Mount the outdoor unit on stable ground to prevent vibration and
increase of noise level.
Decide the location for piping after sorting out the different types of
pipe available.
Procedure to remove the
cover of wiring terminals
Remove the screw (1
piece).
Hold the projected
part at the lower left
of the cover and push
the cover upwards to
remove it.
To close the cover,
insert the upper part
of the cover into the
body of outdoor unit,
then be sure that the
hook below the cover
is plugged in before
screwing.
Hook
Please face this side (suction side)
of the unit to the wall
Please remove
the cover for
wire connection.
Outer
Diameter (mm)
6.35
9.52
12.70
For R410A tool
0.0
~
0.5mm
0.0
~
0.5mm
0.0
~
0.5mm
For R22 tool
A (mm)
1.0mm
1.0mm
1.0mm
Method to remove the low cover
Pull the cover at 1 and 2 in the directions as shown by
arrows to remove the cover.
Drain Pipe
Bush
9
10
100 mm ABOVE
Wiring Of The Indoor Unit
For wire connection of the Indoor unit, you need to remove low
cover and front cover.
Method to remove front cover.
Refer to FINAL STAGE OF INSTALLATION How to Remove The
Front Cover.
Connection wire
is put under here
Side cover
A
B
C
D
Connection wire
Screw for earth line
Power line Control line
Indoor
Unit
Outdoor
Unit
GRN + YEL
GRN + YEL
Strip wires
25mm
25mm
10mm
30mm
10mm
30mm
10mm
10mm
70mm
10mm
10mm
35mm
Earth terminal
BA
C
D
Fuse Capacity
15A time delay fuse
For RAC-14CH8 only
Please mount the Outdoor unit on stable ground to prevent vibration
and increase of noise level.
Decide the location for piping after sorting out the different types of
pipe available.
When removing side cover, please pull the handle after undoing the
hook by pulling it downward.
Please face this side (suction
side) of the unit to the wall.
Please remove side cover
when connecting the piping
and connecting cord.
Pull downward
BASE
DRAIN PIPE
CONDENSED WATER DISPOSAL OF OUTDOOR UNIT
There are holes on the base of Outdoor unit for condensed
water to exhaust.
In order to flow condensed water to the drain, the unit is installed on a
stand or a block so that the unit is 100mm above the ground as shown
figure. Join the drain pipe to one hole.
At first insert one portion of the hook to the base (Portion A), then pull
the drain pipe in the direction shown by the arrow while inserting the
hook into the base. After installation, check whether the drain pipe cling
to the base firmly.
When using in cold region, etc.
In cold region with severe cold climate and heavy snow, water
discharged from heat exchanger freeze on the base surface and this
may affect drainage. In such a region, remove bush on the bottom face
of outdoor unit for better drainage. When using drainpipe, consult our
dealer.
A
DRAIN PIPE
BUSH
100 mm ABOVE
9
11
BUSH
12
For RAC-14CH8 only
For RAC-14CH8 only
For RAC-08/10CH8
Outer
dia.of pipe
6.35 (1/4")
9.52 (3/8")
12.7 (1/2")
6.35 (1/4")
9.52 (3/8")
12.7 (1/2")
Valve
head cap
Torque N·m
(kgf
·
cm)
13.7 18.6 (140 190)
34.3 44.1 (350 450)
44.1 53.9 (450 550)
19.6 24.5 (200 ~ 250)
19.6 24.5 (200 ~ 250)
29.4 34.3 (300 350)
12.3 15.7 (125 ~ 160)
Small dia. side
Large dia. side
Valve core cap
Small dia. side
Large dia. side
H
ITAC
H
I
HITACHI
Step
Shaft
Hole
2

Hulp nodig? Stel uw vraag in het forum

Spelregels

Misbruik melden

Gebruikershandleiding.com neemt misbruik van zijn services uitermate serieus. U kunt hieronder aangeven waarom deze vraag ongepast is. Wij controleren de vraag en zonodig wordt deze verwijderd.

Product:

Bijvoorbeeld antisemitische inhoud, racistische inhoud, of materiaal dat gewelddadige fysieke handelingen tot gevolg kan hebben.

Bijvoorbeeld een creditcardnummer, een persoonlijk identificatienummer, of een geheim adres. E-mailadressen en volledige namen worden niet als privégegevens beschouwd.

Spelregels forum

Om tot zinvolle vragen te komen hanteren wij de volgende spelregels:

Belangrijk! Als er een antwoord wordt gegeven op uw vraag, dan is het voor de gever van het antwoord nuttig om te weten als u er wel (of niet) mee geholpen bent! Wij vragen u dus ook te reageren op een antwoord.

Belangrijk! Antwoorden worden ook per e-mail naar abonnees gestuurd. Laat uw emailadres achter op deze site, zodat u op de hoogte blijft. U krijgt dan ook andere vragen en antwoorden te zien.

Abonneren

Abonneer u voor het ontvangen van emails voor uw Hitachi RAS-08CH8 bij:


U ontvangt een email met instructies om u voor één of beide opties in te schrijven.


Ontvang uw handleiding per email

Vul uw emailadres in en ontvang de handleiding van Hitachi RAS-08CH8 in de taal/talen: Engels als bijlage per email.

De handleiding is 0,83 mb groot.

 

U ontvangt de handleiding per email binnen enkele minuten. Als u geen email heeft ontvangen, dan heeft u waarschijnlijk een verkeerd emailadres ingevuld of is uw mailbox te vol. Daarnaast kan het zijn dat uw internetprovider een maximum heeft aan de grootte per email. Omdat hier een handleiding wordt meegestuurd, kan het voorkomen dat de email groter is dan toegestaan bij uw provider.

Stel vragen via chat aan uw handleiding

Stel uw vraag over deze PDF

loading

Uw handleiding is per email verstuurd. Controleer uw email

Als u niet binnen een kwartier uw email met handleiding ontvangen heeft, kan het zijn dat u een verkeerd emailadres heeft ingevuld of dat uw emailprovider een maximum grootte per email heeft ingesteld die kleiner is dan de grootte van de handleiding.

Er is een email naar u verstuurd om uw inschrijving definitief te maken.

Controleer uw email en volg de aanwijzingen op om uw inschrijving definitief te maken

U heeft geen emailadres opgegeven

Als u de handleiding per email wilt ontvangen, vul dan een geldig emailadres in.

Uw vraag is op deze pagina toegevoegd

Wilt u een email ontvangen bij een antwoord en/of nieuwe vragen? Vul dan hier uw emailadres in.



Info